The Case for Truly Integrated Cost and Schedule Risk Analysis

  • Jan 1, 2017
  • Colin H Cropley
Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Time and cost outcomes of large and complex projects are forecast poorly across all sectors. Over recent years, Monte Carlo (MC) simulation has increasingly been adopted to forecast project time and cost outcomes more realistically. It is recognised that the simultaneous analysis of time and cost impacts makes sense as a modelling objective, due to the well-known relationship of time and money in projects. But most MC practitioners advocate the use of Schedule Risk Analysis (SRA) feeding into Cost Risk Analysis (CRA) because they believe it is too hard to perform Integrated Cost & Schedule Risk Analysis (IRA) realistically. This chapter elaborates an IRA methodology that produces realistic forecasts without relying on questionable assumptions and enables identification and ranking of all sources of cost uncertainty for risk optimisation as part of the process. It also describes an extension of IRA methodology to include assessment of the assets produced by the project as well as the project itself, thus enabling the analysis of business risks as well as project risks.

Similar Papers
  • Single Report

Application and Interpretation of Acumen Risk<sup>®</sup> Schedule and Cost Risk Analysis

  • Jul 10, 2020
  • Steven Booth +1
  • Single Report

Desktop Instructions for LLNL W80-4 WDCR Schedule and Cost Risk Analysis

  • Mar 12, 2018
  • Maricris Schneider
  • Research Article
  • Citations186

Foundations of risk analysis: a knowledge and decision-oriented perspective

  • May 01, 2004
  • Choice Reviews Online
  • Terje Aven
  • Research Article
  • Citations1

Numerical extraction of electric field distribution from thermal pulse method based on Monte Carlo simulation

  • Jan 01, 2016
  • Acta Physica Sinica
  • Liang Ming-Hui +3
  • Research Article
  • Citations1

Techniques for Capital Expenditure Analysis

  • Sep 01, 1996
  • IIE Transactions
  • Henry C Thorne +1
  • Conference Article

Understanding the Results of an Integrated Cost/Schedule Risk Analysis

  • Sep 10, 2013
  • James Johnson +1
  • Conference Article

Better Predictions, Better Outcomes: How Integrated Cost & Schedule Risk Analysis (iCSRA) Reduces Costly Consequences of Project Delays

  • Nov 04, 2024
  • Christopher Britton
  • Research Article
  • Citations42

Schedule risk analysis for new-product development: The GERT method extended by a characteristic function

  • Jun 16, 2017
  • Reliability Engineering & System Safety
  • Liangyan Tao +3
  • Research Article
  • Citations55

A tool to test and validate algorithms for the resource-constrained project scheduling problem

  • Feb 27, 2018
  • Computers & Industrial Engineering
  • Mario Vanhoucke +1
  • Conference Article

Comparison of State Department of Transportation Practices in Analyzing Risks for Large Infrastructure Projects

  • Dec 11, 2023
  • EPiC series in built environment
  • Joseph Shrestha +2
  • Research Article
  • Citations5

Properties of IBA Razor Nano Chamber in small-field radiation therapy using 6 MV FF, 6 MV FFF, and 10 MV FFF photon beams

  • Sep 30, 2021
  • Acta Oncologica
  • Mari Partanen +4
  • Research Article
  • Citations1

Investigation of Buildup Region and Surface Dose: Comparison of Parallel Plane Ion Chamber, Treatment Planning System, and MC Simulation

  • May 21, 2021
  • Nuclear Technology
  • Taylan Tuğrul
  • Research Article
  • Citations42

On the assessment of economic risk: factorial design versus Monte Carlo methods

  • Jul 01, 1997
  • Reliability Engineering & System Safety
  • Willem J.H Van Groenendaal +1
  • Research Article

SU‐FF‐T‐458: MC Simulations in Support of Developing and Testing An Analytical Dose Algorithm in Ocular Proton Therapy

  • Jun 01, 2006
  • Medical Physics
  • N Koch +1
  • Research Article

Molecular Dynamics Analysis of the Scattering Phenomena of Oxygen Molecules on an Ionomer Surface in Catalyst Layer of Fuel Cell

  • Dec 22, 2023
  • Electrochemical Society Meeting Abstracts
  • Keisuke Mizuki +3
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.