- Book Chapter
- 10.5772/5214
Scheduling under Unavailability Constraints to Minimize Flow-time Criteria
- Dec 01, 2007
- Imed Kacem
In this chapter, we consider some practical scheduling problems under unavailability constraints (breakdown periods, maintenance durations and/or setup times). Such problems can be met in different industrial environments and be associated to numerous real-life applications. This explains why many researchers have become interested in this subject. We aim to present the recent approaches proposed to solve these problems and to discuss their performances. This family of scheduling problems, addressed in this chapter, has been intensively studied (Kacem [8], Lee [17], Schmidt [24]). The studied criteria in this chapter are related to the flowtime minimization (the weighted and unweighted cases). The chapter is organized in two main parts. The first part focuses on the single machine scheduling problem (see Section 2). The second part is devoted to the parallel machine scheduling problem (see Section 3). In each part, we present the main contributions and explain their principles (complexity results, heuristic algorithms and their worstcase performance, existing approximation schemes, exact methods, branch-and-bound algorithms, dynamic programming, integer linear models, lower bounds. . .). Finally, Section 4 concludes the paper.
Read more