- Conference Article
11
- 10.1109/ictc.2016.7763280
Centralized MAC protocol for wireless full duplex networks considering D2D communications
- Oct 01, 2016
- Won-Kyung Kim + 2 more +2
The full duplex communication is a spotlighted technology as a most promising solution that can solve channel capacity problem in wireless network. In the future, the device to device(D2D) communication can be considered to reduce the load of network. Furthermore, the centralized network have advantages in collision ratio. For these reasons, we propose a novel centralized full duplex MAC protocol for wireless networks while considering D2D communications using spatial channel reuse algorithm. The proposed protocol can minimize the scheduling overhead while maximize the network throughput. Additionally, it can solve the hidden/exposed node problems without using the RTS/CTS mechanism. The simulation result shows better performance in dense networks with 190% improved average throughput compare to that of half duplex protocol. Based on simulation results, full duplex transmission can be applied to small dense networks such as internet of things (IoT) based networks.
Read more