• Home
  • Search
  • Throughput-delay analysis of one-to-many wireless multi-hop flows based on random linear network coding
  • Cite Icon4
  • https://doi.org/10.1109/jcn.2013.000074Copy DOI Icon

Throughput-delay analysis of one-to-many wireless multi-hop flows based on random linear network coding

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

This paper addresses the issue of throughput-delay of one-to-many wireless multi-hop flows based on random linear network coding (RLNC). Existing research results have been focusing on the single-hop model which is not suitable for wireless multi-hop networks. In addition, the conditions of related system model are too idealistic. To address these limitations, we herein investigate the performance of a wireless multi-hop network, focusing on the one-to-many flows. Firstly, a system model with multi-hop delay was constructed; secondly, the transmission schemes of system model were gradually improved in terms of practical conditions such as limited queue length and asynchronous forwarding way; thirdly, the mean delay and the mean throughput were quantified in terms of coding window size if and number of destination nodes N for the wireless multi-hop transmission. Our findings show a clear relationship between the multi-hop transmission performance and the network coding parameters. This study results will contribute significantly to the evaluation and the optimization of network coding method.

Similar Papers
  • Conference Article
  • Citations3

Different network coding techniques for multihop Machine-to-Machine (M2M) Communication in next generation smart environment

  • Jul 01, 2017
  • Krit Karan Singh Bhardwaj +1
  • Conference Article
  • Citations1

Design of Wireless Sensor Network Based on Random Linear Network Coding

  • Aug 01, 2012
  • Wei Ou +3
  • Conference Article
  • Citations1

Random linear intersession network coding with selective cancelling

  • Jan 01, 2009
  • Chih-Chun Wang +1
  • Research Article
  • Citations12

Random linear network coding with ladder-shaped global coding matrix for robust video transmission

  • Sep 06, 2010
  • Journal of Visual Communication and Image Representation
  • Hui Wang +2
  • Research Article
  • Citations26

Passive Network Tomography for Erroneous Networks: A Network Coding Approach

  • Apr 15, 2010
  • IEEE Transactions on Information Theory
  • Hongyi Yao +2
  • Conference Article

Network RS codes for efficient network adversary localization

  • Nov 01, 2010
  • Hongyi Yao +3
  • Research Article
  • Citations1

GRAND-Assisted Random Linear Network Coding in Wireless Broadcasts

  • Jan 01, 2025
  • IEEE Transactions on Communications
  • Rina Su +3
  • Research Article

네트워크 코딩의 병렬처리 성능비교

  • Aug 31, 2012
  • The KIPS Transactions:PartC
  • Seong-Min Choi +2
  • Research Article
  • Citations58

Network Coding in Heterogeneous Multicore IoT Nodes With DAG Scheduling of Parallel Matrix Block Operations

  • Aug 01, 2017
  • IEEE Internet of Things Journal
  • Simon Wunderlich +3
  • Research Article
  • Citations59

Packing and Covering Properties of Subspace Codes for Error Control in Random Linear Network Coding

  • May 01, 2010
  • IEEE Transactions on Information Theory
  • Maximilien Gadouleau +1
  • Research Article
  • Citations5

Joint design of channel and network coding for star networks connected by binary symmetric channels

  • Jan 01, 2014
  • IEEE Transactions on Communications
  • Christian Koller +3
  • Conference Article
  • Citations3

Random Linear Network Coding with Cooperating in Wireless Sensor Network

  • Sep 01, 2011
  • Tao Jin +2
  • Research Article
  • Citations39

Tunable sparse network coding

  • Jan 01, 2012
  • Repository for Publications and Research Data (ETH Zurich)
  • Soheil Feizi +2
  • Conference Article
  • Citations9

On enhancing the random linear network coding

  • Dec 01, 2011
  • Ms Najeem +1
  • Conference Article
  • Citations1

MAC Aware Random Network Coding for Wireless Unicast Flows

  • Dec 16, 2020
  • Ali Akbar +3
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.