• Home
  • Search
  • Time-Impact Optimal Trajectory Planning for Wafer-Handling Robotic Arms Based on the Improved Snake Optimization Algorithm.
  • Cite Icon2
  • https://doi.org/10.3390/s25061872Copy DOI Icon

Time-Impact Optimal Trajectory Planning for Wafer-Handling Robotic Arms Based on the Improved Snake Optimization Algorithm.

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

To enhance the working efficiency of a wafer-handling robotic arm and simultaneously alleviate the impact and vibration during the motion process, a trajectory planning approach based on an improved snake optimization (ISO) algorithm is proposed. The following improvements have been made to the snake optimization (SO) algorithm: the introduction of a Chaotic Tent Map for initializing the swarm, the use of randomly perturbed dynamic learning factors to replace fixed values, the application of a cosine annealing learning rate for self-adaptively updating individual positions, and the incorporation of Bayesian optimization for parameterization and fine-tuning of the system's selection process. Furthermore, the ISO algorithm is applied in the Cartesian space of the robotic arm to effectively address the trajectory planning challenge of the single-segment start-stop S-shaped speed curve with arc transitions. The simulation results indicate that the improved S-shaped speed curve has increased by 24.1% compared with the original plan, and the mean and variance rankings of ISO algorithm have, respectively, improved by 60.8% and 63.4%, compared with the SO algorithm. Meanwhile, this study has successfully achieved the Pareto optimal solution with time and impact as the targets based on the established MATLAB experimental simulation platform.

Similar Papers
  • Research Article

Trajectory Planning of Shipbuilding Welding Manipulator Based on Improved Whale Optimization Algorithm

  • Jan 01, 2025
  • International Journal of Advanced Computer Science and Applications
  • Caiping Liang +4
  • Research Article
  • Citations2

Robot Manipulator Minimum Jerk Trajectory Planning Based on the Improved Dung Beetle Optimizer Algorithm

  • Sep 25, 2024
  • Journal of Circuits, Systems and Computers
  • Haohao Ma +6
  • Research Article
  • Citations4

Geosteering based on resistivity data and evolutionary optimization algorithm

  • Mar 27, 2024
  • Applied Computing and Geosciences
  • Maksimilian Pavlov +3
  • Research Article

Research on Control Algorithm of Visual Servo Grasping Operating System for Unmanned Aerial Vehicle Robot Arm for Transmission Line Inspection

  • Jan 01, 2025
  • Applied Mathematics and Nonlinear Sciences
  • Shi Ru +4
  • Book Chapter
  • Citations5

Modeling, Analysis and Trajectory Planning of a 5 Degree of Freedom Robotic Arm for a Transmission Line Crossing Robot

  • Jan 01, 2016
  • C M Shruthi +2
  • Conference Article
  • Citations7

A Flexible Collision-Free Trajectory Planning for Multiple Robot Arms by Combining Q-Learning and RRT*

  • Aug 20, 2022
  • Tomoya Kawabe +1
  • Conference Article
  • Citations13

Deepwater Facility Selection

  • May 06, 2002
  • Beverley F Ronalds
  • PDF
  • Research Article

Simulation of a robot arm that can supplant the dynamic activities of human arm

  • Sep 30, 2022
  • GSC Advanced Engineering and Technology
  • Okechukwu Stanley Ikwunze +1
  • Research Article
  • Citations1

Enhanced crayfish optimization algorithm: Orthogonal refracted opposition-based learning for robotic arm trajectory planning.

  • Feb 05, 2025
  • PloS one
  • Yuefeng Leng +2
  • Book Chapter

Smooth Collision-Free Trajectory Planner for AMR Based on B-spline Interpolation and I-GWO

  • Jan 01, 2023
  • Ayoub Idtaleb +1
  • Conference Article
  • Citations2

Optimization of trajectory planning based on loading robot

  • Jun 11, 2021
  • Houyao Zhu +5
  • PDF
  • Research Article
  • Citations22

Sensorization of Robotic Hand Using Optical Three-Axis Tactile Sensor: Evaluation with Grasping and Twisting Motions

  • Aug 01, 2010
  • Journal of Computer Science
  • Yussof
  • Research Article
  • Citations14

Deep reinforcement learning trajectory planning for robotic manipulator based on simulation-efficient training

  • Mar 10, 2025
  • Scientific Reports
  • Bin Zhao +3
  • Research Article
  • Citations2

New optimal algorithm of data association for multi-passive-sensor location system

  • Aug 01, 2007
  • Science in China Series F: Information Sciences
  • Li Zhou +2
  • Research Article

Robotic arm time-optimal trajectory planning using the Adaptive Gold Search algorithm

  • Sep 01, 2025
  • Advances in Mechanical Engineering
  • Chen Lifeng +5
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.