• Home
  • Search
  • Time series modelling for steel production
  • Cite Icon9
  • https://doi.org/10.1353/jda.2016.0112Copy DOI Icon

Time series modelling for steel production

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Steel and its production has now become an important ingredient for the economy of emerging countries. In this process, it is also very important to develop sophisticated forecast techniques for steel production in order to determine the real growth rate of an economy. Especially in South Asia where steel and its production, is one of the largest segment of the economy. Majority population of this region has associated directly or indirectly with steel industry. Inspite the importance of steel for this region, no conclusive research work has done related to this issue. This study investigates the forecasts of steel production in Pakistan for the first time, which is an important emerging economy of the South Asian region. Prediction is an important topic in finance and economics which has spurred the interest of researchers over the years to develop better predictive models. The auto regressive integrated moving average (ARIMA) models have been explored in literature for time series prediction. This paper presents extensive process of building stock price predictive model using the ARIMA model.This paper forecasts steel production by using different time series ARIMA models. A data set of steel production of Pakistan from 1972 -2010 is used for the analysis. Different diagnostic tests are applied in order to check the adequacy of the fitted models. The results show that ARIMA (1,1,4) is suitable model for prediction of steel production in this case. It is concluded that model- 3 of this study is the best model to forecast the production of steel in Pakistan. After checking all the test it is come to know that the data is stationary at first difference and AR(1), MA(1), MA(2), MA(3) and MA(4) with first order is suitable for forecasting the production of steel. The forecasted values obtained from model- 3 are closer to the actual values as compared to the other model. The forecasted value of 2014 show that the production of steel in that particular year appeared to be least as compared to the production during the last five years. These results suggest that the policy makers and planning division of the country must give attention toward this matter and try to find out the reasons of low productivity of steel in the country. It is also an opportunity for the policy makers to develop policies which may help the steel production in future.

Similar Papers
  • Research Article
  • Citations53

Statistical analysis of aerosols over the Gangetic–Himalayan region using ARIMA model based on long-term MODIS observations

  • Jun 17, 2014
  • Atmospheric Research
  • Kirti Soni +3
  • Research Article
  • Citations88

Time series analysis of aerosol optical depth over New Delhi using Box–Jenkins ARIMA modeling approach

  • Mar 02, 2016
  • Atmospheric Pollution Research
  • Kanika Taneja +3
  • PDF
  • Research Article
  • Citations6

Forecasting Stock Price PT. Telkom Using Hybrid Time Series Regression Linear– Autoregressive Integrated Moving Average Model

  • Jan 01, 2022
  • Jurnal Matematika, Statistika dan Komputasi
  • Kartika Ramadani +2
  • Research Article
  • Citations6

Modeling for Growth and Forecasting of Pulse Production in Bangladesh

  • May 30, 2013
  • Research Journal of Applied Sciences, Engineering and Technology
  • Niaz Md Farhatrahman +2
  • Research Article

BITCOIN PRICE PREDICTION BY USING ARIMA

  • May 02, 2024
  • INTERANTIONAL JOURNAL OF SCIENTIFIC RESEARCH IN ENGINEERING AND MANAGEMENT
  • Abass Hassan
  • Research Article
  • Citations8

Time Series Analysis and Forecasting of Oilseeds Production in India: Using Autoregressive Integrated Moving Average and Group Method of Data Handling – Neural Network

  • Feb 27, 2019
  • Asian Journal of Agricultural Extension, Economics & Sociology
  • Debasis Mithiya +2
  • Research Article
  • Citations9

Univariate approach to the monthly total ozone time series over Kolkata, India: autoregressive integrated moving average (ARIMA) and autoregressive neural network (AR-NN) models

  • Feb 17, 2010
  • International Journal of Remote Sensing
  • Goutami Chattopadhyay +1
  • PDF
  • Research Article
  • Citations32

Forecasting exports and imports through artificial neural network and autoregressive integrated moving average

  • Jan 01, 2019
  • Decision Science Letters
  • Teg Alam
  • Research Article

FORECASTING THE PRICE OF CURLY RED CHILI PEPPERS IN EAST JAVA PROVINCE USING ARIMA MODEL WITH ITERATIVE OUTLIER DETECTION PROCEDURE

  • Dec 31, 2025
  • Jurnal Statistika dan Aplikasinya
  • Fareka Erdien +4
  • Research Article
  • Citations3

Prediction of nosocomial infection incidence in the Department of Critical Care Medicine of Guizhou Province with a time series model

  • Jun 01, 2020
  • Annals of Translational Medicine
  • Yumei Cheng +3
  • Research Article
  • Citations5

Aplikasi Model ARIMA dalam Peramalan Data Harga Emas Dunia Tahun 2010-2022

  • Jun 30, 2023
  • Jurnal Statistika dan Aplikasinya
  • Akbar Rizki
  • Research Article
  • Citations41

COVID-19 prevalence estimation: Four most affected African countries.

  • Jan 01, 2020
  • Infectious Disease Modelling
  • Adewale F Lukman +5
  • Book Chapter
  • Citations2

Analysing the Impact of Covid-19 on Automobile Sales in India Using ARIMA Modelling

  • Nov 09, 2022
  • Suyash Srivastava +2
  • PDF
  • Research Article
  • Citations7

Price Analysis and Forecasting for Bitcoin Using Auto Regressive Integrated Moving Average Model

  • Dec 01, 2021
  • Annals of Science and Technology
  • Olufunke G. Darley +2
  • Research Article
  • Citations1

Forecasting the exchange rate of Nigerian Naira to United State’ Dollar using ARIMA-GARCH Model

  • Oct 14, 2022
  • Dutse Journal of Pure and Applied Sciences
  • Bashir Magaji +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.