• Home
  • Search
  • TM 402 - A New Operating Cable And Pipe Burying System
  • https://doi.org/10.4043/3983-msCopy DOI Icon

TM 402 - A New Operating Cable And Pipe Burying System

  • May 4, 1981
  • Vincenzo Di Tella +2 more
Show More
  • Abstract
  • Literature Map
  • Similar Papers
Abstract

ABSTRACT The use of pipes or cables laid on seabottom calls for the adoption of means to guarantee protection against possible damage caused by dragging anchors, trawler nets and the action of currents on free spans. The preferred protection method, most commonly used, is the burying of the cable or pipe in a trench of proper size dug along the line route: at present, for the most important cable and pipe laying projects, the national authorities prescribe a line burying for the whole route. To give a reliable solution to this construction problem, Tecnomare, on the basis of the design and construction experience gained during a previous project TM 102, has designed, built and tested a new system for the burying of underwater cables and pipes, named TM 402, which is now at an operating stage. Such a system consists of an underwater remotely operated crawler, linked by means of an umbilical cable to surface equipment for power supply and control; it can operate under manual or fully automatic computer control in a various spread of soil conditions and in water depths up to 160 meters. The underwater vehicle supports a special chain trenching tool by which a narrow trench with vertical walls is made. The cable or flexible line is supported by a proper handling device which lays it with a controlled geometry onto the trench bottom. A complete instrumentation system allows a continuous monitoring of the system performances and of the cable/pipe conditions. In this paper a detailed description of the system and of its main components and subsystems is given, together with its operating capabilities and procedures. The results of the sea trials carried out in the Summer of the 1980 campaign are, moreover, reported. INTRODUCTION The construction of underwater hydrocarbon transportation lines and of underwater electric power or telecommunication links requires the adoption of means which may guarantee their protection against possible damage caused by human activities or environmental unforeseen loadings. This protection is necessary, not only for the technical-economical reasons connected with the, usually, very high downtime and repair costs consequent to the disruption of the line's economic utilization, but also, in the case of oil/gas transport lines, for ecological and safety reasons due to pollution risk in case of line failure. Safety rules in many countries impose the burial of oil and gas underwater pipelines; the number of underwater electric power line projects for which authorities have prescribed partial or total burying is increasing. The main causes of damage to underwater lines is the impact with dropping or dragging anchors, trawl net dead weight and the action of currents and waves on free-spans. For large size pipelines an alternative to a protection technique can consists in an overdesign of the pipe and coating mechanical characteristics in order to make it capable of taking up possible accidental impact loads.

Similar Papers
  • Conference Article
  • Citations1

Challenges Related to Pipeline Free Spans in Watercourse Crossings

  • Jun 21, 2021
  • Mario Caruso +3
  • Conference Article
  • Citations5

Meeting the Challenges of Deepwater Cable and Pipeline Burial

  • Apr 30, 2001
  • M Finch +1
  • Conference Article

Analytical Estimation of Pretension Requirement to Inner Pipe of Pipe-in-Pipe Flowline in Ultra Deep Water Using J-Lay Installation

  • May 04, 2009
  • Ranil Banneyake +3
  • Research Article
  • Citations7

Wave action on a vertical wall with a submerged horizontal plate: Analysis of phase variation of forces and probability of exceedance

  • Jan 01, 2022
  • International Journal of Naval Architecture and Ocean Engineering
  • Ahmad Alyousif +3
  • Conference Article

Critical Analysis of IS 1255-1983, Reaffirmed 1996 for “Code of Practice for Installation and Maintenance of Power Cables up to and Including 33 kV Rating”

  • Nov 26, 2020
  • Ravi Kumar +1
  • Conference Article
  • Citations7

A three-dimensional silicon shadowmask for patterning on trenches with vertical walls

  • Jun 01, 2009
  • S Morishita +5
  • Research Article

Paleoecologic Aspects of Trace Fossils: ABSTRACT

  • Jan 01, 1969
  • AAPG Bulletin
  • John O Maberry
  • Conference Article
  • Citations1

State of the Art Pipeline Engineering Adopted for the BM-C-33 Offshore Export Pipeline

  • Oct 17, 2023
  • P R Nystrøm +5
  • Conference Article
  • Citations26

Multistage Constructions of Linear Compressors, Non-Overtaking Delay Lines, and Flexible Delay Lines

  • Jan 01, 2006
  • C.-S Chang +3
  • Research Article
  • Citations5

An Operational Subsea Wireline System

  • Feb 01, 1989
  • Journal of Petroleum Technology
  • Chris Dines +2
  • Research Article

ユニブーム地層探査機による網走湖の湖底堆積構造

  • Jan 01, 1978
  • Japanese Journal of Limnology (Rikusuigaku Zasshi)
  • Kinshiro Nakao +1
  • Research Article
  • Citations13

Hydrodynamic characteristics of a vertical wall with an immersed horizontal plate subjected to regular and random waves

  • Jul 27, 2021
  • Ocean Engineering
  • Ahmad Alyousif +3
  • Research Article
  • Citations23

Impact pressure of dam-break waves on a vertical wall with various downstream conditions by an explicit mesh-free method

  • May 21, 2022
  • Ocean Engineering
  • Jinlong Zuo +3
  • Conference Article

Assessment Of An Analysis Of An Instrumented Drilling Jackup Conductor

  • May 02, 1994
  • Djamel Hamel-Derouich +2
  • Research Article
  • Citations5

Wave force variation due to burial of submarine pipelines in uniformly graded and low hydraulic conductivity soil

  • Feb 02, 2012
  • Applied Ocean Research
  • S Neelamani +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.