• Home
  • Search
  • Towards integrated working arrangements for optimizing potential overall benefits from building information modeling
  • https://doi.org/10.5353/th_b5089998Copy DOI Icon

Towards integrated working arrangements for optimizing potential overall benefits from building information modeling

  • Jan 1, 2013
  • Aoxiang Ren
Show More
  • Abstract
  • Literature Map
  • Similar Papers
Abstract

Building Information Modeling (BIM) has been in use in the Hong Kong Architecture, Engineering and Construction (AEC) industry as an Information and Communication Technology (ICT) tool for more than a decade. However, the increasing usage and rapid development in both the AEC industry and academia point to the potential multiple applications, impacts and much broader potential benefits that may be generated from BIM implementation. The current frequently used BIM applications have advanced the project performances levels and consequential benefits of relevant stakeholders in different dimensions.
\nHowever, BIM development in the Hong Kong industry has not been smooth. Attention has been diverted from potential benefits to the barriers and constraints that retard BIM implementation. This has in turn limited the applications, hence not convincing industry participants of their potential benefits in quantitative terms. Furthermore, conflicts between BIM implementation and the existing project processes also retard the smooth development of BIM. A higher level of collaborative working is required for deriving more benefits from BIM.
\nThis research aims to develop possible feasible solutions to reduce the conflicts/barriers in BIM implementation and advance current BIM implementation towards more collaborative and integrated working arrangements (IWAs), with expected broader potential benefits in the context of the Hong Kong industry. IWAs in this research refer to: a) organization structures, b) information exchange mechanisms, and c) project processes. 
\nAn inter-locking set of research methods were applied in this study to achieve the research goal. Literature reviews were conducted to extract and illustrate the basic concepts in BIM and lay the foundation for proposal development. Semi-structured interviews and a questionnaire survey were conducted to explore BIM implementation scenarios in the Hong Kong AEC industry. Two case studies helped to map out BIM implementation processes in real projects in Hong Kong. Finally, a focus group meeting was held to discuss, validate and improve the relevant research findings and improvement proposals. 
\nThe main outcomes of this research are the proposed short term IWAs and long term IWAs for optimizing overall potential benefits of BIM implementation. The proposed short term IWAs consist of specific measures for participants to address the barriers and conflicts in BIM implementation within existing project processes. The proposed long term IWAs are based on a conceptual framework and processes to build an integrated working environment for BIM. The outcomes of this research can help industry practitioners to overcome current barriers and derive more benefits from BIM by developing specific measures targeting the current scenarios, as well as provide possible directions for moving further forward in the long term. The research outcomes also offer relevant contributions to knowledge by proposing fresh concepts and approaches to creating and developing collaborative working environment for BIM implementation based on relevant principles and guidelines that are in turn derived from Relational Contracting (RC) frameworks.

Similar Papers
  • Research Article
  • Citations6

Introduction to the Special Issue on Information and Communication Technology (ICT) in AEC Organizations: Assessment of Impact on Work Practices, Project Delivery, and Organizational Behavior

  • Sep 26, 2014
  • Journal of Management in Engineering
  • Salman Azhar +1
  • PDF
  • Research Article
  • Citations11

Client-Driven Level 2 BIM Implementation: A Case Study from the UAE

  • Jun 18, 2021
  • The Open Construction and Building Technology Journal
  • Muhammad T Shafiq
  • Research Article
  • Citations156

BIM compatibility and its differentiation with interoperability challenges as an innovation factor

  • Jan 21, 2020
  • Automation in Construction
  • Sara Shirowzhan +4
  • Supplementary Content
  • Citations5

BIM IMPLEMENTATION STRATEGY FRAMEWORK FOR SMALL ARCHITECTURAL PRACTICES

  • Jan 01, 2020
  • University of Salford Institutional Repository (University of Salford)
  • Paul M Coates
  • Research Article
  • Citations25

Implementation of Building Information Modeling (BIM) in Pakistan Construction Industry

  • Aug 18, 2018
  • Engineering, Technology & Applied Science Research
  • I A Bhatti +5
  • Research Article
  • Citations41

Drivers for implementation of building information modeling (BIM) within the Nigerian construction industry

  • Feb 08, 2021
  • Journal of Financial Management of Property and Construction
  • Oludolapo Ibrahim Olanrewaju +3
  • Research Article
  • Citations2

Analysis of Factors Inhibiting the Implementation of Building Information Modeling (BIM) in Construction Projects

  • Jul 05, 2024
  • Bentang : Jurnal Teoritis dan Terapan Bidang Rekayasa Sipil
  • M Archie Alverinaldo +1
  • Research Article
  • Citations58

Critical success factors for BIM implementation: a Malaysian case study

  • May 09, 2020
  • Engineering, Construction and Architectural Management
  • Saznizam Sazmee Sinoh +2
  • Book Chapter
  • Citations1

The Application of BIM in the Undergraduate Course “Integrated Building Project Development”

  • Dec 23, 2020
  • Calvin C W Keung +1
  • Conference Article
  • Citations5

BIM Implementation in China: A Case Study Approach

  • Jan 01, 2015
  • Bo Jiang +3
  • Research Article
  • Citations19

Factors influencing BIM use in green building construction project management in the UK and China

  • Jun 03, 2023
  • Building Research & Information
  • Ling Tian +3
  • PDF
  • Research Article
  • Citations1

Inhibiting Factors Analysis of BIM Implementation in Jambi City’s Construction Companies

  • Apr 01, 2024
  • CIVED
  • Nada Milani Azrita +2
  • Research Article
  • Citations16

Identifying key factors for building information modelling adoption in Singapore

  • Sep 01, 2015
  • Proceedings of the Institution of Civil Engineers - Management, Procurement and Law
  • Meghdad Attarzadeh +2
  • Research Article
  • Citations5

Identifying key factors for building information modelling adoption in Singapore

  • Sep 01, 2015
  • Proceedings of the Institution of Civil Engineers - Management, Procurement and Law
  • Meghdad Attarzadeh +2
  • Research Article
  • Citations4

Application of Building Information Modeling toward Social Sustainability

  • Nov 01, 2021
  • IOP Conference Series: Earth and Environmental Science
  • N S A Rahim +4
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.