• Home
  • Search
  • Unit commitment for power plants with tracking speed limits
  • Cite Icon1
  • https://doi.org/10.1109/iceceng.2011.6057744Copy DOI Icon

Unit commitment for power plants with tracking speed limits

  • Sep 1, 2011
  • Tao Fan +1 more
Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Unit commitment is an efficient method to lower the total cost of the power plant by scheduling units' generation and meeting the constraint condition. However, in practice, few power plants implement the algorithm for fear that the load response in the power plant would not be fast enough to track the unscheduled load demand from the power grid if some units of the power plant are shut down. This paper proposes a new unit commitment method that tries to solve this problem effectively. The proposed method guarantees the desired speed limit by setting the plant-level load tracking speed. In this method a ‘one-at-a-time’ unit commitment is accomplished. The most expensive unit (which is determined by computing its cost) is optimized, the unit commitment schedule is updated, and the load dispatch result is re-computed. The result will be repeatedly optimized until the spinning reserve or load tracking speed is lack. The optimization loop will breaks out as well if the unit schedules of two consecutive iterations over the time period remain unchanged. The test results from 10-machine system shows that the proposed method is easy to understand and quick to solve, and is of practical use.

Similar Papers
  • Research Article
  • Citations5

送電損失と線路過負荷を考慮した火力発電機起動停止計画手法

  • Jan 01, 2002
  • IEEJ Transactions on Power and Energy
  • Guoliang Zhao +1
  • PDF
  • Research Article
  • Citations9

Solving Unit Commitment Problem Using Modified Subgradient Method Combined with Simulated Annealing Algorithm

  • Jan 01, 2010
  • Mathematical Problems in Engineering
  • Ümmühan Başaran Filik +1
  • Research Article
  • Citations68

Multi-area unit commitment

  • May 01, 1992
  • IEEE Transactions on Power Systems
  • F.N Lee +1
  • Conference Article
  • Citations3

Optimal Dispatch Model of Wind Power Accommodation in Combined Heat and Power System Based on Unit Commitment

  • May 01, 2019
  • Chaofan Hu +4
  • PDF
  • Research Article
  • Citations14

Unit Commitment Towards Decarbonized Network Facing Fixed and Stochastic Resources Applying Water Cycle Optimization

  • May 03, 2018
  • Energies
  • Heba-Allah I Elazab +3
  • Conference Article
  • Citations8

Day ahead optimal scheduling of generators using Dynamic Programming method

  • Dec 01, 2019
  • Smriti Jain +1
  • PDF
  • Research Article
  • Citations4

Hybrid Robust/Stochastic Unit Commitment With Iterative Partitions of the Continuous Uncertainty Set

  • Jul 20, 2018
  • Frontiers in Energy Research
  • Patrick Gögler +2
  • Conference Article
  • Citations4

Reliability Constrained Day Ahead Unit Commitment with Optimal Spinning Reserve Allocation for Solar Integrated Power System

  • Dec 01, 2020
  • Smriti Jain +2
  • Research Article
  • Citations420

A New Method for Unit Commitment at Electricite De France

  • May 01, 1983
  • IEEE Transactions on Power Apparatus and Systems
  • A Merlin +1
  • Research Article
  • Citations75

Solution of the unit commitment problem by the method of unit periods

  • Jan 01, 1990
  • IEEE Transactions on Power Systems
  • G.B Sheble
  • PDF
  • Research Article
  • Citations31

Annual Assessment of Large-Scale Introduction of Renewable Energy: Modeling of Unit Commitment Schedule for Thermal Power Generators and Pumped Storages

  • May 23, 2017
  • Energies
  • Takashi Mitani +5
  • Conference Article
  • Citations1

Extracting physical power plant parameters from historical behaviour

  • Sep 01, 2019
  • David Kraljic +2
  • Conference Article
  • Citations8

Application of Artificial Bee Colony Method for Unit Commitment

  • Aug 01, 2018
  • Minal Babu Kokare +1
  • Research Article
  • Citations46

Evaluating the impact of sub-hourly unit commitment method on spinning reserve in presence of intermittent generators

  • Jul 21, 2016
  • Energy
  • Mehdi Kazemi +3
  • Research Article
  • Citations49

Enhanced priority list unit commitment method for power systems with a high share of renewables

  • Aug 26, 2013
  • Electric Power Systems Research
  • E Delarue +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.