• Home
  • Search
  • V-shape property for job sequences that minimize the expected completion time variance
  • Cite Icon22
  • https://doi.org/10.1016/0377-2217(95)00097-6Copy DOI Icon

V-shape property for job sequences that minimize the expected completion time variance

  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

V-shape property for job sequences that minimize the expected completion time variance

Similar Papers
  • Research Article
  • Citations1

A two-phase simulated annealing algorithm to minimise the completion time variance of jobs in flowshops

  • Jan 01, 2020
  • International Journal of Process Management and Benchmarking
  • S Thiagarajan +1
  • Research Article
  • Citations5

A modified ant-colony optimisation algorithm to minimise the completion time variance of jobs in flowshops

  • Oct 15, 2012
  • International Journal of Production Research
  • J Krishnaraj +3
  • Research Article
  • Citations13

Heuristics to minimize the completion time variance of jobs on a single machine and on identical parallel machines

  • May 26, 2016
  • The International Journal of Advanced Manufacturing Technology
  • Raju Rajkanth +2
  • Research Article
  • Citations27

Single machine sequencing with random processing times and random due‐dates

  • Dec 01, 1969
  • Naval Research Logistics Quarterly
  • Thomas B Crabill +1
  • Research Article
  • Citations76

On Johnson's Two-Machine Flow Shop with Random Processing Times

  • Feb 01, 1986
  • Operations Research
  • Peng-Sheng Ku +1
  • Research Article
  • Citations20

Control of a Batch Processing Machine Serving Compatible Job Families

  • Aug 01, 2003
  • IIE Transactions
  • John J Neale +1
  • Research Article
  • Citations1

An Adaptive SPT Rule for Scheduling and Testing Heterogeneous Jobs

  • Aug 13, 2019
  • SSRN Electronic Journal
  • Retsef Levi +2
  • Conference Article

Planning and Control of Projects with Different Types of Precedence Relationships and a Service Level Using Stochastic Simulation

  • Jan 01, 2015
  • D.F Muñoz
  • Research Article
  • Citations26

Crane scheduling in a flexible electroplating line: a tolerance-based approach

  • Dec 01, 1992
  • Journal of Electronics Manufacturing
  • Nai-Chien Yin +1
  • Research Article
  • Citations1

Stochastic group scheduling problems on single and multiple machines

  • Jan 01, 2004
  • Journal of Statistics and Management Systems
  • Jason Chao-Hsien Pan +1
  • Conference Article
  • Citations6

Combining simulation with a GRASP metaheuristic for solving the permutation flow-shop problem with stochastic processing times

  • Dec 11, 2016
  • Daniele Ferone +3
  • Research Article
  • Citations21

On the performance of synchronized programs in distributed networks with random processing times and transmission delays

  • Jan 01, 1994
  • IEEE Transactions on Parallel and Distributed Systems
  • S Rajsbaum +1
  • Research Article
  • Citations2

OPTIMAL RANDOM BACKUP POLICIES FOR A DATABASE SYSTEM

  • Aug 01, 2014
  • International Journal of Reliability, Quality and Safety Engineering
  • Mingchih Chen +2
  • Research Article
  • Citations76

A stochastic scheduling algorithm for precedence constrained tasks on Grid

  • Apr 19, 2011
  • Future Generation Computer Systems
  • Xiaoyong Tang +4
  • Research Article
  • Citations4

Solving a single machine stochastic scheduling problem using a branch and bound algorithm and simulated annealing

  • Jan 01, 2012
  • International Journal of Management Science and Engineering Management
  • Mohammad Mahdavi Mazdeh +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.