WIPP Facility Work Plan for Solid Waste Management Units

  • Feb 14, 2002
  • Washington Tru Solutions Llc
Show More
  • Abstract
  • Literature Map
  • Citations
  • Similar Papers
Abstract

This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

Similar Papers
  • Single Report
  • Citations3

Final voluntary release assessment/corrective action report

  • Nov 12, 1996
  • Westinghouse Electric Corp., Carlsbad, Nm (United States) Waste Isolation Div
  • Single Report

RCRA Facility Investigation Plan, Tank 2064-U (S-205), Y-12 Plant, Oak Ridge, Tennessee

  • Nov 01, 1987
  • William Allison
  • Single Report

RCRA facility assessments

  • Jul 01, 1994
  • Book Chapter

Hazardous Wastes: Standards and Regulations

  • Jul 16, 2015
  • Handbook of Clean Energy Systems
  • Joseph J Santoleri
  • Single Report

Environmental Restoration Operations: Consolidated Quarterly Report January -March 2017

  • Jul 01, 2017
  • John Cochran
  • Single Report

Annual Hanford Site environmental permitting status report

  • Oct 01, 1996
  • S.A Thompson
  • Single Report

ER Consolidated Qtrly Rpt_July-September 2015_January 2016

  • Jan 01, 2016
  • John Cochran
  • Single Report

Hanford Site Hazardous waste determination report for transuranic debris waste streams NPFPDL1A, NPFPDL1B, NPFPDL1C and NPFPDL1D

  • Sep 29, 1999
  • J.A Winterhalder
  • Single Report

2013 Los Alamos National Laboratory Hazardous Waste Minimization Report

  • Aug 24, 2015
  • Sonja L Salzman +1
  • Research Article
  • Citations4

The role of the agency for toxic substances and disease registry under the Superfund Amendments and Reauthorization Act of 1986

  • Jan 01, 1988
  • Journal of Hazardous Materials
  • F.Henry Habicht
  • Single Report

Impact of the resource conservation and recovery act on energy facility siting

  • Jan 01, 1982
  • C W Tevepaugh
  • Single Report

Quality Assurance Project Plan for the Environmental Monitoring Program in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

  • Dec 01, 1993
  • Oak Ridge National Lab., Tn (United States) +1
  • Research Article
  • Citations10

Evaluation of Landfill‐Liner Designs

  • May 01, 1990
  • Journal of Environmental Engineering
  • R Lee Peyton +1
  • Single Report

Los Alamos National Laboratory Environmental Restoration Project quarterly technical report, April--June 1994

  • Aug 18, 1994
  • Los Alamos National Lab., Nm (United States)
  • Single Report

Soil Management Plan for the Oak Ridge Y-12 National Security Complex Oak Ridge, Tennessee

  • Mar 02, 2005
  • Oak Ridge Y-12 Plant (Y-12), Oak Ridge, Tn
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.