- Research Article
6
- 10.21276/ambi.2022.09.1.ta04
Performance-enhancing and improvement studies in a 210 kW Rooftop Solarphotovoltaic Plant by Manual Cleaning
- Apr 01, 2021
- AMBIENT SCIENCE
- Deepak Deepak + 1 more +1
Recently Government of India (GOI) has announced that country has achieved the milestone of 100 GW from renewable energy sources. Also, The Indian government wants to install 450 gigawatts of renewable energy capacity by 2030, with solar accounting for 280 GW (more than 60%). To ensure that the sun continues to shine over the country's sunrise industry for the next ten years, roughly 25 GW of solar energy capacity will need to be added each year But a major problem with the solar power plant is the accumulation of dust and soiling on the surface of a photovoltaic panel. It reduces the efficiency of the photovoltaic panel. Generally, dust problem occurs in the dessert area while soiling problem occurs in other locations. However, solar power plants performance also depends on the tilt angle, Surface material of photovoltaic panel, solar incidence angle, and weather patterns (humidity, rainfall, airborne particle concentration, wind, etc.). Accumulation of dust on the photovoltaic panel surface partially stops the transmission of solar radiation, which decreases photovoltaic panel conversion efficiency and the overall performance of the solar power plant (
Read more