- Conference Article
- 10.2118/230348-ms
Pioneering Ultra High-Pressure Zero-Flaring Well Cleanups Under Extreme Sour Gas Conditions
- Nov 25, 2025
- T Tankiyev + 17 more +17
Abstract Strict environmental regulations in Kazakhstan limit flaring during well cleanup, creating technical challenges for high-pressure wells under sour gas conditions (SPE-172339-MS). Conventional surface Well testing equipment could not meet these constraints, risking delays in production. This paper addresses these challenges through the deployment of ultra-high pressure zero flaring Surface Well Testing package for High Pressure well testing. It evaluates field application, operational feasibility, and implications for regulatory compliance in ultra-high-pressure environments. In comparison, global standards such as the European Union, ETS and US EPA, Subpart W also impose strict controls on flaring and greenhouse gas emissions. By aligning with these frameworks, Kazakhstan's regulatory stance demonstrates both local compliance and broader applicability to international sustainability practices. Karachaganak Petroleum Operating B.V. (KPO), operator of one of Kazakhstan's largest gas condensate fields, faced this challenge directly. Many of its wells on the low-pressure (LP) reservoir have wellhead pressures lower than the production system, and the presence of sour gas added further technical complexity. To address this, SLB and KPO developed the Zero-Flaring package with a surface pressure-boosting system to reinject multiphase well effluents into the production line. First deployed in 2018, it eliminated flaring during LP/HP cleanups. However, the package could only handle wells, which are connected to production line with flowing pressure up to 130barg. Beyond this injection pressure, there was a need to develop an ultra-high-pressure package (UHP) capable of well cleanup and injection at production line pressure exceeding 130barg. Flaring remained the only technically feasible industrial option for UHP well cleanup due to the unavailability of suitable surface equipment capable of cleaning and reinjecting in the production line at ultra high pressure (> 130barg). This approach conflicted with Kazakhstan's strict environmental regulations, which imposed severe flaring limits and threatened to delay or halt production from new UHP wells. To overcome this, Zero-Flaring Ultra High-Pressure (UHP) separation package - a groundbreaking solution enabling flaring-free cleanup of high-pressure wells was developed. The solution was successfully deployed in 2024 during three UHP cleanup operations at the Karachaganak field. The package performed safely and reliably under ultra-high-pressure and sour gas conditions, eliminating flaring and associated CO₂ emissions. It also enabled earlier production readiness, avoided regulatory noncompliance, and significantly reduced carbon footprint. This deployment marked the industry's first field use of a 220-bar-rated separator for surface well testing. The integration of high-specification pressure components and optimized flow assurance management contributed to the system's success under challenging well conditions. This paper discusses the design, execution, and performance of the technology and highlights its scalability for future HP developments requiring environmentally compliant, zero-flaring operations. This paper presents the first deployment of a 220barg rated surface separator used for zero-flaring UHP well cleanup an innovation that sets a new benchmark for ultra-high-pressure operations. It offers insights into equipment application under extremely sour gas conditions and operational workflows that ensure regulatory compliance. The paper provides scalable, field-proven solutions toward low-emission, sustainable energy production.
Read more