• Home
  • Search
  • A fuzzy multi-objective programming for scheduling of weighted jobs on a single machine
  • Cite Icon11
  • https://doi.org/10.1007/s00170-009-1947-5Copy DOI Icon

A fuzzy multi-objective programming for scheduling of weighted jobs on a single machine

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

This paper considers a classic model of weighted single machine scheduling problem and aims to improve it to a real-world application through fuzzy set theory. For this purpose, processing times and due dates of jobs are defined as fuzzy numbers. In the proposed model, two objectives are considered to be minimized: average tardiness and number of tardy jobs. The objectives are converted into fuzzy statement through fuzzy arithmetic. Because the problem is NP-hard, it is proposed to solve the model through three well-known meta-heuristic algorithms as Simulated Annealing, Tabu Search, and Genetic Algorithm albeit with some modifications. Comparative analysis of algorithms is attainable through different experimented results on generated benchmark problems with different sizes and difficulties. Efficiency of the developed algorithms is analyzed on the different versions of the model which come from the assumption of different parameters and/or components. Algorithms' behaviors to managerial insights are also considered in some sensitivity analysis experiments. The obtained results show the applicability of the proposed model in real-world scheduling problems.

Similar Papers
  • Research Article
  • Citations23

Sensitivity analysis of a fuzzy multiobjective scheduling problem

  • Jun 15, 2008
  • International Journal of Production Research
  • Sanja Petrovic +2
  • Research Article
  • Citations5

Fuzzy Scheduling Problem on Unrelated Parallel Machine in JIT Production System

  • May 15, 2020
  • Artificial Intelligence Evolution
  • Javad Rezaeian +3
  • Research Article
  • Citations1

Finding Pareto optima for maximum tardiness, maximum earliness and number of tardy jobs

  • Jan 01, 2012
  • International Journal of Operational Research
  • Ghasem Moslehi +1
  • Research Article
  • Citations43

Scheduling unit processing time jobs on a single machine with multiple criteria

  • Jan 01, 1990
  • Computers & Operations Research
  • Chuen-Lung Chen +1
  • Research Article
  • Citations4

Solving TSP by Considering Processing Time: Meta-Heuristics and Fuzzy Approaches

  • Dec 01, 2011
  • Fuzzy Information and Engineering
  • S.H Nasseri +1
  • Research Article
  • Citations52

Multi-objective parallel machine scheduling problem with job deterioration and learning effect under fuzzy environment

  • Apr 04, 2015
  • Computers & Industrial Engineering
  • Mohammad Rostami +2
  • Research Article
  • Citations7

Single machine total tardiness maximization problems: complexity and algorithms

  • Dec 28, 2012
  • Annals of Operations Research
  • Evgeny R Gafarov +2
  • Research Article
  • Citations11

Single-machine scheduling to minimize earliness and number of tardy jobs

  • Jun 01, 1993
  • Journal of Optimization Theory and Applications
  • T C E Cheng +1
  • Dissertation

Hybrid Ant Colony Optimization For Fuzzy Unrelated Parallel Machine Scheduling Problems

  • Apr 04, 2016
  • Po An Su
  • Book Chapter
  • Citations6

Scheduling of Unit Processing Time Jobs on a Single Machine

  • Jan 01, 1997
  • Suna Köksalan Kondakci +2
  • Research Article
  • Citations26

Characterizations of endograph metric and Γ-convergence on fuzzy sets

  • Mar 06, 2018
  • Fuzzy Sets and Systems
  • Huan Huang
  • PDF
  • Research Article
  • Citations1

Nature-Inspired Metaheuristics for Two-Agent Scheduling with Due Date and Release Time

  • Dec 29, 2020
  • Complexity
  • Hongwei Li +4
  • Research Article
  • Citations11

Multi-objective scheduling in labor-intensive manufacturing systems

  • Oct 01, 2020
  • Journal of Manufacturing Systems
  • Gürsel Süer +3
  • Research Article
  • Citations31

A composite heuristic for the single machine early/tardy job scheduling problem

  • Jul 01, 1998
  • Computers and Operations Research
  • Maria Teresa Almeida +1
  • Conference Article
  • Citations5

Stochastic Scheduling on Unrelated Machines

  • May 11, 2017
  • DROPS (Schloss Dagstuhl – Leibniz Center for Informatics)
  • Martin Skutella +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.