• Home
  • Search
  • Multi-objective parallel machine scheduling problem with job deterioration and learning effect under fuzzy environment
  • Cite Icon52
  • https://doi.org/10.1016/j.cie.2015.03.022Copy DOI Icon

Multi-objective parallel machine scheduling problem with job deterioration and learning effect under fuzzy environment

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Multi-objective parallel machine scheduling problem with job deterioration and learning effect under fuzzy environment

Similar Papers
  • Research Article
  • Citations56

Multi-objective fuzzy parallel machine scheduling problems under fuzzy job deterioration and learning effects

  • Oct 24, 2017
  • International Journal of Production Research
  • Oğuzhan Ahmet Arık +1
  • Research Article
  • Citations17

Reconfigurable Dynamic Cellular Manufacturing System: A New Bi-Objective Mathematical Model

  • Jan 01, 2014
  • RAIRO - Operations Research
  • Masoud Rabbani +3
  • Research Article
  • Citations66

Green vessel scheduling in liner shipping: Modeling carbon dioxide emission costs in sea and at ports of call

  • Sep 29, 2017
  • International Journal of Transportation Science and Technology
  • Maxim A Dulebenets
  • PDF
  • Research Article
  • Citations11

Sustainable Supply Chain Model for Defective Growing Items (Fishery) with Trade Credit Policy and Fuzzy Learning Effect

  • Apr 27, 2023
  • Axioms
  • Osama Abdulaziz Alamri
  • PDF
  • Research Article
  • Citations29

A Sustainable Green Supply Chain Model with Carbon Emissions for Defective Items under Learning in a Fuzzy Environment

  • Jan 06, 2023
  • Mathematics
  • Basim S O Alsaedi +3
  • Research Article
  • Citations8

Designing a new mathematical model for optimising a multi-product RFID-based closed-loop food supply chain with a green entrepreneurial orientation

  • Oct 18, 2021
  • British Food Journal
  • Farshid Jahanshahee Nezhad +4
  • Research Article
  • Citations1

Genetic Algorithm and Mathematical Modelling for Integrated Schedule Design and Fleet Assignment at a Mega-Hub

  • Jun 16, 2025
  • Aerospace
  • Melis Tan Tacoglu +2
  • Research Article
  • Citations26

A bi-objective multi-period series-parallel inventory-redundancy allocation problem with time value of money and inflation considerations

  • Dec 09, 2016
  • Computers & Industrial Engineering
  • Najmeh Alikar +4
  • Research Article
  • Citations5

Fuzzy Scheduling Problem on Unrelated Parallel Machine in JIT Production System

  • May 15, 2020
  • Artificial Intelligence Evolution
  • Javad Rezaeian +3
  • Research Article
  • Citations135

Some scheduling problems with deteriorating jobs and learning effects

  • Nov 17, 2007
  • Computers & Industrial Engineering
  • T.C.E Cheng +2
  • PDF
  • Research Article
  • Citations8

A fuzzy interval based multi-criteria homogeneous group decision making technique: An application to airports ranking problem

  • Oct 15, 2023
  • Decision Making: Applications in Management and Engineering
  • Bipradas Bairagi
  • Research Article
  • Citations27

A Pareto block-based estimation and distribution algorithm for multi-objective permutation flow shop scheduling problem

  • Jul 14, 2014
  • International Journal of Production Research
  • Anurag Tiwari +3
  • Research Article
  • Citations444

Long term supplier selection using a combined fuzzy MCDM approach: A case study for a telecommunication company

  • Mar 04, 2008
  • Expert Systems with Applications
  • Semih Önüt +2
  • Research Article
  • Citations48

A two-stage genetic algorithm for multi-objective job shop scheduling problems

  • Jul 26, 2009
  • Journal of Intelligent Manufacturing
  • Voratas Kachitvichyanukul +1
  • Research Article
  • Citations11

Multi-objective flexible job shop scheduling problem using variable neighborhood evolutionary algorithm

  • Jul 27, 2017
  • Modern Physics Letters B
  • Chun Wang +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.