A new heuristic solution method in resource-constrained project scheduling

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

A new heuristic method is presented for the resolution of multiresource constrained conflicts in project scheduling. In attempting to find a minimal makespan solution, the algorithm employs a simple procedure to generate a feasible solution with no backtracking. A postanalysis phase then applies a hill-climbing search. The solution method is different from existing heuristic methods in that it repairs resource conflicts rather than constructs detailed schedules by dispatching activities. Resource-violating sets of activities are identified which must be prevented from concurrent execution because this would violate resource constraints. Repairs are made by imposing an arc to sequence two activities in such a resource violating set. Computational results are compared with those of existing heuristics for the minimal makespan problem.

Similar Papers
  • Research Article
  • Citations27

Dynamic reserve site selection under contagion risk of deforestation

  • Sep 20, 2006
  • Ecological Modelling
  • Régis Sabbadin +2
  • Research Article
  • Citations47

Planning quality inspection operations in multistage manufacturing systems with inspection errors

  • Jan 01, 1998
  • International Journal of Production Research
  • J Lee +1
  • Research Article
  • Citations10

Mixed-integer linear programming for project scheduling under various resource constraints

  • Jun 27, 2024
  • European Journal of Operational Research
  • Nicklas Klein +2
  • Book Chapter

Problems in Protean Systems - Computer Programs for Some Solution Methods

  • Jan 06, 2022
  • Radha Kalyan +1
  • Research Article
  • Citations34

Least cost influence propagation in (social) networks

  • May 12, 2018
  • Mathematical Programming
  • Matteo Fischetti +4
  • Conference Article
  • Citations5

An efficient approach to discrete Multiple Different Facility Location Problem

  • Oct 01, 2008
  • D Shishebori +2
  • Book Chapter
  • Citations3

Course Scheduling Problem and Real-Life Implementation

  • Jan 01, 2023
  • Ali Berk Behrenk +2
  • Book Chapter
  • Citations2

A Location-Routing Based Solution Approach for Reorganizing Postal Collection Operations in Rural Areas

  • Jan 01, 2020
  • Maurizio Boccia +3
  • Research Article
  • Citations2

Stochastic RWA and Lightpath Rerouting in WDM Networks

  • Jun 07, 2022
  • INFORMS Journal on Computing
  • Maryam Daryalal +1
  • Research Article
  • Citations5

Task assignment and sequencing decision model under uncertain available time of service providers

  • Jan 11, 2018
  • Journal of the Operational Research Society
  • Lu Zhen +4
  • Research Article
  • Citations9

Supply Chain Optimization in Pulp Distribution Using a Rolling Horizon Solution Approach

  • Jun 14, 2008
  • SSRN Electronic Journal
  • David Bredstrom +1
  • PDF
  • Research Article
  • Citations11

Comparison of Heuristic Priority Rules in the Solution of the Resource-Constrained Project Scheduling Problem

  • Sep 05, 2021
  • Sustainability
  • Osman Hürol Türkakın +2
  • Book Chapter
  • Citations38

The Aircraft Sequencing Problem

  • Jan 01, 2003
  • Torsten Fahle +4
  • Conference Article
  • Citations3

Skill-oriented priority scheduling for solving the Resource Constrained Project Scheduling Problem

  • Sep 01, 2015
  • Aurelia Ciupe +3
  • Research Article
  • Citations1

Heuristic for integrated purchasing and production planning

  • Jan 01, 2011
  • European J. of Industrial Engineering
  • Supakanya Chinprateep +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.