Abstract

Resource-constrained project scheduling (RCPS) aims to minimize project duration under limited resource availabilities. The heuristic methods that are often used to solve the RCPS problem make use of different priority rules. The comparative merits of different priority rules have not been discussed in the literature in sufficient detail. This study is a response to this research gap. It compares 17 heuristic priority rules and seeks the best performing heuristic priority rule. This is the first study ever that compares heuristic priority rules by considering combinations of variations in (1) resource allocation procedures, (2) number of activities, (3) number of resource constraints, and (4) resource supply levels. The objective is to understand the relative merits of heuristic rules used in solving the RCPS problem. The findings indicate that the “minimum late finish time” rule generates the shortest predicted project duration when used in parallel resource allocation, whereas the “minimum late start time”, “minimum late finish time”, and the “highest rank of positional weight 2” rules perform best in serial resource allocation. It was also found that parallel resource allocation is slightly superior to serial resource allocation in most instances.

Loading PDF

Similar Papers
  • Research Article
  • Citations27

Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem

  • Nov 11, 2019
  • Engineering, Construction and Architectural Management
  • Marimuthu Kannimuthu +3
  • Research Article
  • Citations187

A Hybrid Genetic Algorithm for Assembly Line Balancing

  • Nov 01, 2002
  • Journal of Heuristics
  • José Fernando Gonçalves +1
  • Research Article
  • Citations15

Reinforcement Learning for Resource Constrained Project Scheduling Problem with Activity Iterations and Crashing

  • Jan 01, 2020
  • IFAC PapersOnLine
  • Inkyung Sung +2
  • Conference Article
  • Citations4

A Multi-Timescale Load Balancing Approach in Vehicular Edge Computing

  • Nov 01, 2020
  • Tao Lin +3
  • Conference Article
  • Citations3

Skill-oriented priority scheduling for solving the Resource Constrained Project Scheduling Problem

  • Sep 01, 2015
  • Aurelia Ciupe +3
  • Conference Article
  • Citations8

Application of Resource-Constrained Project Scheduling with a Critical Chain Method on organizational Project Management

  • Jun 01, 2010
  • Xiaogang Wang +3
  • PDF
  • Research Article
  • Citations8

Effective Project Scheduling Under Workspace Congestion and Workflow Disturbance Factors

  • Jan 09, 2014
  • Australasian Journal of Construction Economics and Building - Conference Series
  • Vitaly Semenov +4
  • PDF
  • Research Article
  • Citations6

Комплексный метод составления расписаний для сложных индустриальных программ с учетом пространственно-временных ограничений

  • Jan 01, 2014
  • Proceedings of the Institute for System Programming of RAS
  • V.A Semenov +4
  • PDF
  • Research Article
  • Citations2

Scheduling for Indonesia’s Aircraft Wing Structure Design Project with Critical Path Method and Resource-Constrained Project Scheduling

  • Jan 01, 2018
  • MATEC Web of Conferences
  • Melissa Putri Hidayat +2
  • Research Article
  • Citations1

Evolve ensemble rules automatically for the block spatial scheduling under dynamic environments via surrogate-assisted cooperative evolution genetic programming

  • Aug 27, 2024
  • International Journal of Production Research
  • Lubo Li +2
  • Research Article
  • Citations67

Resource–constrained project scheduling: a heuristic for the multi–mode case

  • Aug 01, 2001
  • OR-Spektrum
  • Roland Heilmann
  • PDF
  • Research Article
  • Citations3

Defining work-zones for resource allocation in Hong Kong public housing project construction using heuristic rules and operations simulation

  • Sep 24, 2021
  • Journal of Information Technology in Construction
  • Zilu Lin +3
  • Research Article
  • Citations85

A new heuristic solution method in resource-constrained project scheduling

  • Jun 01, 1991
  • Naval Research Logistics
  • Colin E Bell +1
  • Research Article
  • Citations7

Relationships between colleague ratings and faculty compensation

  • Jan 01, 1979
  • Research in Higher Education
  • John Muffo
  • Research Article

MTTDFR-SJFR: A Combinatorial Rule Approach to Balance Tradeoff Between Flowtime, Makespan, Delayed Jobs, Total Tardiness and Utilization

  • Oct 01, 2018
  • Advanced Science Letters
  • Zafril Rizal M Azmi +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.