Effective Project Scheduling Under Workspace Congestion and Workflow Disturbance Factors

  • Abstract
  • Highlights & Summary
  • PDF
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Effective project management implies the use of advanced planning and scheduling methods that allow to determine feasible sequences of activities and to complete a project on time and on budget. Traditional scheduling tools like fundamental Critical Path Method (CPM) and various methods for Resource Constrained Project Scheduling Problem (RCPSP) and Time Constrained Project Scheduling Problem (TCPSP) have many shortcomings for construction projects where spatial factor plays a critically important role. Previous attempts to interpret space as a specific resource were successful for particular problems of line-of-balance scheduling, space scheduling, dynamic layout planning, horizontal and vertical logic scheduling, workspace congestion mitigating, scheduling multiple projects with movable resources, spatial scheduling of repeated and grouped activities and motion planning. However, none of these methods considers the spatio-temporal requirements in a holistic framework of generic RCPSP problem and provides feasible results accounting for workspace and workflow factors. In this paper we start with the classical RCPSP statement and then present mathematically strong formalisation of the extended generalised problem, taking into account workspace congestion and workflow disturbance constraints specified in practically meaningful and computationally constructive ways. For the generalised RCPSP problem an effective scheduling method is proposed. The method tends to minimise the project makespan while satisfying timing constraints and precedence relations, not exceeding resource utilisation limits, avoiding workspace congestions and keeping workflows continuous. The method reuses so-called serial scheduling scheme and provides for additional computational routines and heuristic priority rules to generate feasible schedules satisfying all the imposed requirements. Advantages of the method and prospects for its application to industrial needs are outlined in the paper too.

Loading PDF

Similar Papers
  • PDF
  • Research Article
  • Citations6

Комплексный метод составления расписаний для сложных индустриальных программ с учетом пространственно-временных ограничений

  • Jan 01, 2014
  • Proceedings of the Institute for System Programming of RAS
  • V.A Semenov +4
  • PDF
  • Research Article
  • Citations8

Review of conventional metaheuristic techniques for resource-constrained project scheduling problem

  • Jan 01, 2022
  • Journal of Project Management
  • Amir Golab +3
  • Research Article
  • Citations37

Artificial Bee colony for resource constrained project scheduling problem

  • Jan 01, 2011
  • International Journal of Industrial Engineering Computations
  • Reza Akbari +2
  • Conference Article
  • Citations3

Skill-oriented priority scheduling for solving the Resource Constrained Project Scheduling Problem

  • Sep 01, 2015
  • Aurelia Ciupe +3
  • Research Article
  • Citations10

Mixed-integer linear programming for project scheduling under various resource constraints

  • Jun 27, 2024
  • European Journal of Operational Research
  • Nicklas Klein +2
  • Research Article
  • Citations1

A Modified Variable Neighbourhood Search Heuristic for the Multi‐Mode Resource Constrained Project Scheduling Problem with A Case Study

  • Jul 01, 2019
  • INCOSE International Symposium
  • Ripon K Chakrabortt +2
  • Book Chapter

Kinematic Model of Project Scheduling with Resource Constrained under Uncertainties

  • Jan 01, 2015
  • Garbi Giuliani Paulineli +3
  • Book Chapter
  • Citations1

An Introduction to the Resource Constrained Project Scheduling Problem Solving Techniques

  • Sep 14, 2016
  • Amaia Lusa +1
  • Research Article
  • Citations4

An S-graph Based Approach for Multi-Mode Resource-Constrained Project Scheduling with Time-Varying Resource Capacities

  • Aug 01, 2018
  • Chemical engineering transactions
  • Olivér Ősz +1
  • Research Article
  • Citations2

A Genetic Algorithm Based Solution with Schedule Mode for RCPSP

  • Jul 04, 2011
  • Advanced Materials Research
  • Yan Hua Ren +2
  • Research Article
  • Citations49

An improved fuzzy critical chain approach in order to face uncertainty in project scheduling

  • Jan 20, 2017
  • International Journal of Construction Management
  • E Roghanian +2
  • Book Chapter

Proposing a Pre-emptive Resource Constrained Project Scheduling Problem (PRCPSP) Model to Optimize Manpower and Project Delivery Time (A Case Study)

  • Oct 26, 2020
  • Arman Saeidi +3
  • Research Article

A Permutation Encoding Technique Applied to Genetic Algorithm Solution of Resource Constrained Project Scheduling Problem

  • Dec 29, 2014
  • Nigerian Journal of Technology
  • Mh Oladeinde +1
  • Research Article
  • Citations29

Solving the Resource Constrained Project Scheduling Problem using the parallel Tabu Search designed for the CUDA platform

  • Nov 26, 2014
  • Journal of Parallel and Distributed Computing
  • Libor Bukata +2
  • Research Article
  • Citations7

IP-Based Energetic Reasoning for the Resource Constrained Project Scheduling Problem

  • Jul 17, 2010
  • Electronic Notes in Discrete Mathematics
  • Anis Kooli +3
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.