• Home
  • Search
  • Artificial Bee colony for resource constrained project scheduling problem
  • Cite Icon37
  • https://doi.org/10.5267/j.ijiec.2010.04.004Copy DOI Icon

Artificial Bee colony for resource constrained project scheduling problem

  • Abstract
  • Highlights & Summary
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Solving resource constrained project scheduling problem (RCPSP) has important role in the context of project scheduling.Considering a single objective RCPSP, the goal is to find a schedule that minimizes the makespan.This is NP-hard problem (Blazewicz et al., 1983) and one may use meta-heuristics to obtain a global optimum solution or at least a near-optimal one.Recently, various meta-heuristics such as ACO, PSO, GA, SA etc have been applied on RCPSP.Bee algorithms are among most recently introduced meta-heuristics.This study aims at adapting artificial bee colony as an alternative and efficient optimization strategy for solving RCPSP and investigating its performance on the RCPSP.To evaluate the artificial bee colony, its performance is investigated against other meta-heuristics for solving case studies in the PSPLIB library.Simulation results show that the artificial bee colony presents an efficient way for solving resource constrained project scheduling problem.

Similar Papers
  • PDF
  • Research Article
  • Citations8

Review of conventional metaheuristic techniques for resource-constrained project scheduling problem

  • Jan 01, 2022
  • Journal of Project Management
  • Amir Golab +3
  • Conference Article
  • Citations3

Skill-oriented priority scheduling for solving the Resource Constrained Project Scheduling Problem

  • Sep 01, 2015
  • Aurelia Ciupe +3
  • Research Article
  • Citations20

A novel algorithm for solving resource-constrained project scheduling problems: a case study

  • Nov 08, 2018
  • Journal of Advances in Management Research
  • Mahmood Kasravi +2
  • Research Article
  • Citations9

Integrating artificial bee colony and bees algorithm for solving numerical function optimization

  • Dec 22, 2013
  • Neural Computing and Applications
  • Hsing-Chih Tsai
  • Research Article
  • Citations1

A Modified Variable Neighbourhood Search Heuristic for the Multi‐Mode Resource Constrained Project Scheduling Problem with A Case Study

  • Jul 01, 2019
  • INCOSE International Symposium
  • Ripon K Chakrabortt +2
  • PDF
  • Research Article
  • Citations8

Effective Project Scheduling Under Workspace Congestion and Workflow Disturbance Factors

  • Jan 09, 2014
  • Australasian Journal of Construction Economics and Building - Conference Series
  • Vitaly Semenov +4
  • Book Chapter
  • Citations9

A Differential Evolution Algorithm for Solving Resource Constrained Project Scheduling Problems

  • Jan 01, 2016
  • Ismail M Ali +3
  • Research Article
  • Citations4

A Permutation-Based Bees Algorithm for Solving Resource-Constrained Project Scheduling Problem

  • Oct 01, 2019
  • International Journal of Swarm Intelligence Research
  • Mohamed Amine Nemmich +2
  • Abstract
  • Citations1

00/01553 Thermodynamics of TiO x in blast furnace-type slags

  • May 01, 2000
  • Fuel and Energy Abstracts
  • Research Article
  • Citations2

A Genetic Algorithm Based Solution with Schedule Mode for RCPSP

  • Jul 04, 2011
  • Advanced Materials Research
  • Yan Hua Ren +2
  • Book Chapter

Kinematic Model of Project Scheduling with Resource Constrained under Uncertainties

  • Jan 01, 2015
  • Garbi Giuliani Paulineli +3
  • Research Article

Automatic Clustering and Multi-Directional Scheduling Scheme for Multi-Mode Scheduling Projects

  • Sep 30, 2019
  • Industrial Engineering & Management Systems
  • Hamid Reza Yoosefzadeh
  • Research Article
  • Citations4

An S-graph Based Approach for Multi-Mode Resource-Constrained Project Scheduling with Time-Varying Resource Capacities

  • Aug 01, 2018
  • Chemical engineering transactions
  • Olivér Ősz +1
  • Book Chapter

Proposing a Pre-emptive Resource Constrained Project Scheduling Problem (PRCPSP) Model to Optimize Manpower and Project Delivery Time (A Case Study)

  • Oct 26, 2020
  • Arman Saeidi +3
  • Research Article

A Permutation Encoding Technique Applied to Genetic Algorithm Solution of Resource Constrained Project Scheduling Problem

  • Dec 29, 2014
  • Nigerian Journal of Technology
  • Mh Oladeinde +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.