Abstract

ABSTRACTNurse rostering is a complex scheduling problem which requires the assignment of various shifts to different types of registered nurses and is subject to a set of constraints encompassing patient demand coverage and working and rest regulations. In addition to these constraints, the flexibility and fairness of shift assignments have become a pressing issue that directly affects nurse satisfaction. In this article, a two-stage heuristic algorithm is proposed to fulfill the fairness and flexibility objectives on nurse shift assignment. The first stage identifies the shift type combination that meets the demanded staffing level for each time interval of the day, and makes the shift assignments also comply with the set of working constraints. The second stage generates nurse rosters that allocate the weekend shifts as evenly as possible over a given planning horizon based on a hospital's requests. A case study using data from a US hospital is presented to illustrate the applicability of the method, and comparisons of the three most commonly used shift length designs are discussed. The results show that cost savings and fairness can be achieved through appropriate shift designs.

Similar Papers
  • Conference Article
  • Citations3

Knowledge extraction for system design: application to a complex industrial scheduling problem

  • Jan 01, 1995
  • R Bisdorff
  • Conference Article
  • Citations11

TDRSS Scheduling Algorithm for Non-Uniform Time-Space Distributed Missions

  • Dec 01, 2017
  • Lei Wang +4
  • Research Article

Addressing Operating Room Planning and Scheduling Problem by Genetic Engineering Algorithm

  • Jan 01, 2025
  • IEEE Access
  • Majid Sohrabi +3
  • Research Article
  • Citations296

Cyclic Transfer Algorithm for Multivehicle Routing and Scheduling Problems

  • Oct 01, 1993
  • Operations Research
  • Paul M Thompson +1
  • Research Article
  • Citations19

Constraint programing for solving four complex flexible shop scheduling problems

  • Feb 21, 2021
  • IET Collaborative Intelligent Manufacturing
  • Leilei Meng +7
  • Research Article
  • Citations38

The reliable design of a hierarchical multi-modes transportation hub location problems (HMMTHLP) under dynamic network disruption (DND)

  • May 23, 2018
  • Computers & Industrial Engineering
  • Sara Sadat Torkestani +3
  • Research Article
  • Citations27

Minimizing total earliness and tardiness on a permutation flow shop using VNS and MIP

  • Jun 26, 2014
  • Computers & Industrial Engineering
  • R M’Hallah
  • Book Chapter
  • Citations9

A Differential Evolution Algorithm for Solving Resource Constrained Project Scheduling Problems

  • Jan 01, 2016
  • Ismail M Ali +3
  • Research Article
  • Citations9

Scheduling of parallel machines with sequence-dependent batches and product incompatibilities in an automotive glass facility

  • Jan 20, 2013
  • Journal of Scheduling
  • Alvaro J Lozano +1
  • Research Article
  • Citations60

A branch and bound algorithm for a single-machine scheduling problem with positive and negative time-lags

  • May 01, 1999
  • Discrete Applied Mathematics
  • Peter Brucker +2
  • Research Article
  • Citations7

Two-stage heuristic algorithm for the large-scale capacitated location routing problem

  • Jan 01, 2016
  • International Journal of Mathematical Modelling and Numerical Optimisation
  • Oualid Guemri +3
  • PDF
  • Research Article
  • Citations43

An improved simulated annealing algorithm based on residual network for permutation flow shop scheduling

  • Oct 08, 2020
  • Complex & Intelligent Systems
  • Yang Li +4
  • Conference Article
  • Citations2

A study on the integration of complex machines in complex job shop scheduling

  • Dec 09, 2018
  • Karim Tamssaouet +4
  • Research Article
  • Citations3

A dynamic programming optimization procedure for a two-product biomass-to-methane conversion system

  • Jul 01, 1987
  • Journal of Mathematical Analysis and Applications
  • Richard M Feldman +2
  • Conference Article
  • Citations6

A STUDY ON THE INTEGRATION OF COMPLEX MACHINES IN COMPLEX JOB SHOP SCHEDULING

  • Dec 01, 2018
  • Karim Tamssaouet +4
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.