Acceptance Test Procedure: SY101 air pallet system

  • May 30, 1995
  • B.m Koons
Show More
  • Abstract
  • Literature Map
  • Similar Papers
Abstract

The purpose of this test procedure is to verify that the system(s) procured to load the SY-101 Mitigation Test Pump package fulfills its functional requirements. It will also help determine the man dose expected due to handling of the package during the actual event. The scope of this procedure focuses on the ability of the air pallets and container saddles to carry the container package from the new 100 foot concrete pad into 2403-WD where it will be stored awaiting final disposition. This test attempts to simulate the actual event of depositing the SY-101 hydrogen mitigation test pump into the 2403-WD building. However, at the time of testing road modifications required to drive the 100 ton trailer into CWC were not performed. Therefore a flatbed trailer will be use to transport the container to CWC. The time required to off load the container from the 100 ton trailer will be recorded for man dose evaluation on location. The cranes used for this test will also be different than the actual event. This is not considered to be an issue due to minimal effects on man dose.

Similar Papers
  • Single Report

Rotary mode core sampling service trailer Acceptance Test Plan

  • Nov 28, 1994
  • A.J Kostelnik
  • Research Article
  • Citations45

Detecting mycotoxins in agricultural commodities.

  • Jan 01, 2003
  • Molecular Biotechnology
  • Thomas B Whitaker
  • Single Report

Acceptance test procedure for C-018H, 242-A evaporator/PUREX plant process condensate treatment facility

  • Aug 16, 1994
  • D.E Parrish
  • Single Report

Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

  • May 18, 2000
  • M.R Koch
  • Single Report

242T FACP replacement

  • Nov 17, 1994
  • M.F Ferry
  • Conference Article
  • Citations5

<title>Clementine: diode-pumped laser qualification</title>

  • Apr 10, 1995
  • Proceedings of SPIE, the International Society for Optical Engineering/Proceedings of SPIE
  • Mark E Kushina +4
  • Book Chapter
  • Citations3

Surface-Smoothness Evaluation and Specifications for Flexible Pavements

  • Jan 01, 1990
  • W Uddin +2
  • Single Report

System design package for the solar heating and cooling central data processing system

  • Mar 01, 1978
  • Not Given Author
  • Single Report

ENRAF Series 854 Advanced Technology Gauge (ATG) Acceptance Test Procedure

  • Aug 17, 1999
  • J.H Huber
  • Single Report

105 K East isolation barrier acceptance analysis report

  • May 31, 1995
  • K.J Mccracken +1
  • Single Report

Acceptance test report for the Westinghouse 100 ton hydraulic trailer

  • Mar 06, 1995
  • R.A Barrett
  • PDF
  • Research Article

Pemanfaatan e-tikbroh.yak: aplikasi jemput antar sampah non-organik rumah tangga di Kota Banda Aceh (Making use of e-tikbroh.yak: the pick-up and delivery non-organic waste service app in Banda Aceh)

  • Dec 31, 2023
  • Buletin Pengabdian Bulletin of Community Services
  • Rizanna Rosemary +3
  • Research Article
  • Citations4

Dynamic Comparison of Three- and Four-Equation Reactor Core Models in a Full-Scope Power Plant Training Simulator

  • Feb 01, 2004
  • Nuclear Technology
  • Gilberto Espinosa-Paredes +4
  • Single Report

SN-268 encasement leak detection ANA-WT-LDSTA-335 acceptance test procedure

  • Aug 25, 1999
  • D.W Vandyke
  • Single Report

SITE ACCEPTANCE TEST PROCEDURES WINGS III-V VAFB

  • Feb 28, 1963
  • R E Sheffield +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.