• Home
  • Search
  • An Efficient False Path-Aware Heuristic Critical Path Selection Method with High Coverage of the Process Variation Space
  • Cite Icon2
  • https://doi.org/10.1145/3177866Copy DOI Icon

An Efficient False Path-Aware Heuristic Critical Path Selection Method with High Coverage of the Process Variation Space

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

In this article, we present a critical path selection method that efficiently finds true (sensitizable) critical paths of a circuit in the presence of process variations. The method, which is based on the viability analysis, tries to select the least number of true critical paths that cover all of circuit critical gates. Critical gates are those that make a path critical with a probability higher than a predefined threshold value. Selecting fewer critical paths leads to less computation time for the algorithm and shorter test time of fabricated chips. For this purpose, an efficient Statistical Static Timing Analysis– (SSTA) based technique is suggested. This technique tries to find circuit-critical gates whose process parameter variations cover a major part of the process space. Improving the process space coverage using fewer paths is achieved by considering both spatial (proximity of gates) and structural (having common gates) correlations in the analysis of choosing the critical paths. In the selection process, paths with low similarities in their characteristics are preferred. In addition, only true paths whose delays affect the maximum delay of the circuit are included. The selected paths can be used in the test process of the fabricated chips to determine if the chip meets its timing requirements. Also, a modified viability analysis that incorporates statistical computations is used in the SSTA. The efficacy of the proposed method is evaluated by comparing its results for combinational and sequential ISCAS benchmarks with those obtained by exhaustive search. Results indicate although, on average, only 4.38% of all the critical paths found by the exhaustive search are selected by the proposed method, the maximum probability of criticality for the paths that are not considered in our method is, on average, less than 4%.

Similar Papers
  • Conference Article
  • Citations3

Functional timing optimization

  • Jan 20, 2003
  • A Saldanha
  • Research Article
  • Citations11

Variation-Aware False Path Analysis Based on Statistical Dynamic Timing Analysis

  • Nov 01, 2012
  • IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems
  • Jongyoon Jung +1
  • Conference Article
  • Citations5

Application Specific True Critical Paths Identification in Sequential Circuits

  • Jul 01, 2019
  • Lembit Jurimagi +5
  • Research Article
  • Citations3

Statistical Gate Delay Model for Multiple Input Switching

  • Jan 01, 2009
  • IEICE Transactions on Fundamentals of Electronics, Communications and Computer Sciences
  • Takayuki Fukuoka +2
  • Research Article
  • Citations1

STATISTICAL TIMING ANALYSIS OF THE CLOCK PERIOD IMPROVEMENT THROUGH CLOCK SKEW SCHEDULING

  • Aug 01, 2011
  • Journal of Circuits, Systems and Computers
  • Shannon M Kurtas +1
  • Research Article
  • Citations39

A Scalable Statistical Static Timing Analyzer Incorporating Correlated Non-Gaussian and Gaussian Parameter Variations

  • Jan 01, 2008
  • IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems
  • J Singh +1
  • Conference Article
  • Citations1

Process variation-aware approximation for efficient timing management of digital circuits

  • Sep 01, 2015
  • Mohsen Faryabi +3
  • Conference Article
  • Citations8

Statistical static timing analysis using Markov chain Monte Carlo

  • Mar 01, 2010
  • Yashodhan Kanoria +2
  • Conference Article
  • Citations1

Pseudo circuit model for representing uncertainty in waveforms

  • Mar 01, 2011
  • A Nigam +4
  • Conference Article
  • Citations49

Accelerating statistical static timing analysis using graphics processing units

  • Jan 19, 2009
  • Kanupriya Gulati +1
  • Conference Article
  • Citations51

An accurate sparse matrix based framework for statistical static timing analysis

  • Jan 01, 2006
  • Digest of technical papers/Digest of technical papers - IEEE/ACM International Conference on Computer-Aided Design
  • Anand Ramalingam +5
  • Conference Article
  • Citations66

Non-linear statistical static timing analysis for non-Gaussian variation sources

  • Jan 01, 2007
  • Proceedings - ACM IEEE Design Automation Conference
  • Lerong Cheng +2
  • Conference Article
  • Citations8

Path-Based Statistical Static Timing Analysis for Large Integrated Circuits in a Weak Correlation Approximation

  • May 01, 2019
  • Dmytro Mishagli +2
  • Conference Article

Implementation of Retiming Technique for Clock Period Optimization by Brute-Force Approach

  • Apr 07, 2023
  • Vishwaraj Mahan +1
  • Conference Article
  • Citations1

Accurate Estimation of Circuit Delay Variance with Limited Monte Carlo Simulations Using Bayesian Inference

  • Apr 05, 2023
  • Chithira P R
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.