• Home
  • Search
  • Arc-based formulation and GRASP-enhanced iterated greedy algorithm for identical parallel machine scheduling with a common server
  • https://doi.org/10.1016/j.swevo.2025.102250Copy DOI Icon

Arc-based formulation and GRASP-enhanced iterated greedy algorithm for identical parallel machine scheduling with a common server

Show More
  • Abstract
  • Literature Map
  • References
  • Similar Papers
Abstract

• Examines scheduling on m identical parallel machines with a common server. • Considers sequence-dependent setup times in parallel machine scheduling. • Introduces an arc-based MILP formulation for makespan minimization. • Presents a GRASP-enhanced Iterated Greedy algorithm with strong performance. • Reports 21 new best-known solutions across benchmark test instances. The identical parallel machine scheduling problem with a single server and sequence-dependent setup times is a challenging optimization problem with important applications in manufacturing and service industries. In such environments, several machines depend on a common server to perform setup operations before production can begin, which creates strong interdependencies and demands more effective scheduling strategies. This characteristic highlights the practical relevance of the problem. The interaction between machine availability and server operations often becomes a critical bottleneck. This study introduces two complementary approaches. The first is an exact method based on a novel arc-based mixed-integer linear programming (ABF) model, which extends the modeling capability of existing formulations by capturing server-related constraints more effectively. The second is an approximation method built on an Iterated Greedy (IG) algorithm. The IG procedure is improved by two evaluation mechanisms: one model-based evaluation derived from the proposed ABF model, and another employing a greedy randomized adaptive search procedure (GRASP)-based strategy that integrates greedy selection, randomization, and reconstruction to enhance solution quality. Computational experiments are conducted on existing benchmark instances. The results show that the proposed ABF model performs well on small and medium-sized instances compared to existing exact methods, while the IG variants, particularly the proposed GRASP-based version, deliver strong performance against state-of-the-art metaheuristics developed for this problem. In addition, 21 new best-known solutions are reported, further demonstrating the effectiveness of the proposed approaches.

Similar Papers
  • Book Chapter
  • Citations2

Identical Parallel-Machine Scheduling and Worker Assignment Problem Using Genetic Algorithms to Minimize Makespan

  • Jan 01, 2011
  • Imran Ali Chaudhry +1
  • Research Article
  • Citations3

Using a variable neighborhood search to solve a bi-objective identical parallel machine scheduling problem

  • Apr 01, 2018
  • Electronic Notes in Discrete Mathematics
  • Leandro Resende Mundim +1
  • Conference Article
  • Citations5

Metaheuristics for identical parallel machines scheduling to minimize mean tardiness

  • Mar 01, 2015
  • Husam Kaid +3
  • Research Article
  • Citations28

A dispatching rule and a random iterated greedy metaheuristic for identical parallel machine scheduling to minimize total tardiness

  • Sep 13, 2017
  • International Journal of Production Research
  • Cheng-Hsiung Lee
  • Research Article
  • Citations59

Comparing meta-heuristic approaches for parallel machine scheduling problems

  • Jan 01, 2002
  • Production Planning & Control
  • Alexandre S Mendes +3
  • Research Article
  • Citations50

Event driven strategy based complete rescheduling approaches for dynamic m identical parallel machines scheduling problem with a common server

  • Nov 14, 2015
  • Computers & Industrial Engineering
  • Alper Hamzadayi +1
  • Research Article
  • Citations28

An exact method for [formula omitted] problem

  • Dec 13, 2005
  • Computers & Operations Research
  • Rabia Nessah +2
  • Research Article
  • Citations39

An intelligent water drop algorithm to identical parallel machine scheduling with controllable processing times: a just-in-time approach

  • Mar 19, 2015
  • Computational and Applied Mathematics
  • Vahid Kayvanfar +2
  • Research Article
  • Citations28

Approximation algorithms for precedence-constrained identical machine scheduling with rejection

  • Jun 16, 2016
  • Journal of Combinatorial Optimization
  • Xianzhao Zhang +3
  • Research Article
  • Citations3

Parallel machine scheduling with a total energy consumption limitation for minimizing total completion time

  • Aug 01, 2024
  • Engineering Optimization
  • Kai Li +4
  • Research Article

Evolutionary programming method for minimizing the number of tardy jobs

  • Jul 01, 1999
  • IFAC Proceedings Volumes
  • Liu Min +1
  • Research Article
  • Citations5

A fast local search for the identical parallel machine scheduling problem with the position‐based deteriorating effect and maintenance

  • Feb 03, 2025
  • International Transactions in Operational Research
  • Radosław Rudek
  • Research Article
  • Citations2

A branch and bound algorithm for an identical parallel machine scheduling problem with a job splitting property

  • Mar 01, 2008
  • Computers & Operations Research
  • Shimsang-Oh +1
  • Research Article
  • Citations20

Modeling and solving for bi-objective cutting parallel machine scheduling problem

  • Apr 05, 2019
  • Annals of Operations Research
  • Ronghua Meng +2
  • Conference Article
  • Citations11

Machine scheduling with sequence-dependent setup times using a randomized search heuristic

  • Jul 01, 2009
  • Jairo R Montoya-Torres +3
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.