• Home
  • Search
  • ASSEMBLY LINE BALANCING IMPLEMENTATION IN MINOR AND SUB ASSEMBLY WORK SHOP AT SHIPYARDS
  • Cite Icon1
  • https://doi.org/10.5750/ijme.v158ia2.984Copy DOI Icon

ASSEMBLY LINE BALANCING IMPLEMENTATION IN MINOR AND SUB ASSEMBLY WORK SHOP AT SHIPYARDS

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Recently, the competitive environment is very tough in shipbuilding industry and under these circumstances, manufacturing a ship in a shorter time becomes significantly important in order to meet the customer demands. Therefore, it is hard to do that by using traditional manufacturing techniques. The shipyards located in Turkey usually have functional locations for the machines and this situation often causes longer production times. Instead of this, assembly lines should be redesigned as workshops in the shipyard. Prefabrication work unit is a good example in which an assembly line is needed to be designed. In this study, an assembly line design for prefabrication work unit was performed. For this, assignments of work operations to work shops were carried out by using Largest Set Rule Algorithm and some alternatives were created according to compare the different values of cycle time. These alternatives were simulated by using a production simulation program and the most appropriate assembly line design was presented.

Similar Papers
  • PDF
  • Research Article
  • Citations4

Evaluation of redundant configurations in assembly lines with fractional tasks

  • Jun 07, 2022
  • Production Engineering
  • Paolo Renna
  • Research Article
  • Citations14

A bi-level optimisation approach for assembly line design using a nested genetic algorithm

  • Nov 18, 2020
  • International Journal of Production Research
  • Daria Leiber +1
  • Research Article
  • Citations10

An assembly line design and construction for a small manufacturing company

  • Apr 18, 2008
  • Assembly Automation
  • Ramazan Yaman
  • Research Article
  • Citations3

Multi-objective Early-stage Design of Automotive Hybrid Assembly Lines

  • Jan 01, 2015
  • Procedia CIRP
  • M Colledani +5
  • Research Article
  • Citations15

A bi‐objective ergonomic assembly line balancing model with conic scalarization method

  • Jul 26, 2022
  • Human Factors and Ergonomics in Manufacturing & Service Industries
  • Busra N Yetkin +1
  • Research Article
  • Citations5

AutomationML as Seamless Data Exchange Format for Integration of Automated Planning Tools for Assembly Line Design

  • Jan 01, 2022
  • Procedia CIRP
  • Carsten Seeber +1
  • Research Article
  • Citations18

An approach to find task sequence for re‐balancing of assembly lines

  • Sep 28, 2010
  • Assembly Automation
  • Kürşad Ağpak
  • Research Article
  • Citations22

Automated design of multi-station assembly lines

  • Jan 01, 2019
  • Procedia CIRP
  • Daria Leiber +3
  • Research Article
  • Citations1

A Simulation Study on the Layout Design of Micro Assembly Line for Lens Module

  • Jan 01, 2014
  • IFAC Proceedings Volumes
  • Dug Hee Moon +4
  • Conference Article
  • Citations4

Automatic configuration of a powertrain assembly line layout based on a KBE approach

  • Sep 01, 2014
  • Andrea Ascheri +4
  • Conference Article

Assembly line design in final assembly excavator at XYZ Corp using genetic algorithm

  • Jan 01, 2019
  • AIP conference proceedings
  • Risty Mayang Sari +2
  • Research Article
  • Citations7

Improved moth flame optimization algorithm to optimize cost-oriented two-sided assembly line balancing

  • Aug 09, 2019
  • Engineering Computations
  • Mohd Fadzil Faisae Ab Rashid +3
  • Research Article

EVALUASI CYCLE TIME TERHADAP KONDISI MEDAN PADA PROYEK PEMBANGUNAN AKSES JALAN SAMOTA LANJUTAN KABUPATEN SUMBAWA

  • Dec 06, 2024
  • GANEC SWARA
  • Hasyim Hasyim +1
  • Research Article
  • Citations9

Clustering methods for geometric objects and applications to design problems

  • Jan 01, 1986
  • The Visual Computer
  • F Dehne +1
  • Research Article
  • Citations10

Assembly Lines with Overlapping Work Stations

  • Sep 01, 1975
  • A I I E Transactions
  • Ravinder Nanda +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.