- Research Article
- 10.1088/1755-1315/1564/1/012037
Implementation of BIM (Building Information Modeling) in the Construction Project of Coal Terminal
- Dec 01, 2025
- IOP Conference Series: Earth and Environmental Science
- Hokky Santoso Sie + 3 more +3
The increasing complexity of construction projects, especially in maritime infrastructure. Private Port Terminal / Terminal Untuk Kepentingan Sendiri (TUKS), demands innovative approaches to enhance efficiency, coordination, and accuracy. Building Information Modeling (BIM) has emerged as a transformative technology in addressing these challenges by integrating multidisciplinary data into a centralized digital environment. This study investigates the implementation of BIM in the planning and execution phases of a coal terminal jetty project located in Kalimantan, Indonesia. The primary aim is to evaluate BIM’s contribution to clash detection, cost estimation, and construction scheduling, using Autodesk Revit for 3D modeling and Navisworks for 4D simulation and clash analysis. Methodologically, the research adopts a case study approach involving comprehensive data collection from technical drawings, schedules, and cost estimates, followed by BIM modeling and analysis. The findings reveal that the application of BIM significantly improves design coordination through early identification and resolution of spatial conflicts, reducing hard clashes by over 70% after model revision. Furthermore, quantity takeoffs derived from the BIM model provide more precise cost estimations, while 4D simulation enhances construction timeline accuracy, mitigating the risk of delays and cost overruns. Comparative analysis shows that BIM-based planning reduces total construction costs by approximately 8.6% and project duration by 12.3% compared to conventional methods. The study contributes to the field by offering empirical evidence of BIM’s effectiveness in maritime infrastructure projects, highlighting its potential in improving decision-making, minimizing rework, and optimizing resource allocation. Practical implications include guiding stakeholders in adopting BIM for similar projects, while social implications involve promoting transparency and accountability in construction. Future research should explore automated clash categorization and lifecycle integration for long-term asset management using BIM.
Read more