Component and process commonalities in production system under various uncertain factors

Show More
  • Abstract
  • Literature Map
  • References
  • Similar Papers
Abstract

In this paper, the authors studied the effects of process and component/part commonality and uncertain factors (viz. lead time, machine breakdown etc.) on deliverable parameters of a multi product, multi-period and multistage dependent demand manufacturing environment. The throughput of finished products and average production time of the system are examined for various experimental scenarios on the basis of existing manufacturing setup of a company consisting of multiple end products. Simulation package, namely WITNESS is used to simulate/analyze the situations of the production lines. Simulation models are developed, verified and validated with the historical data from the company. It is found that inclusion of common components in manufacturing system is always beneficial over the non-commonality environment, especially i) in uncertain situations, ii) for long procurement lead time of components and iii) when the number of parts increase in the system. Impacts of machine breakdown on system outcomes are higher than that of the lead time variation. The combination of uncertain factors has more impact on outcomes (throughput and average production time) compared to the individual factor. Commonality has a better control over the machine breakdown than lead time uncertainty. Component commonality is more effective for a production environment under uncertain situations than the process commonality.

Similar Papers
  • Research Article
  • Citations78

LT variance or LT mean reduction in supply chain management: Which one has a higher impact on SC performance?

  • Dec 24, 2009
  • International Journal of Production Economics
  • S Kamal Chaharsooghi +1
  • Research Article
  • Citations122

The Effect of Lead Time Uncertainty on Safety Stocks

  • Feb 01, 2004
  • Decision Sciences
  • Sunil Chopra +2
  • Research Article
  • Citations68

To wait or not to wait: Optimal ordering under lead time uncertainty and forecast updating

  • Oct 07, 2009
  • Naval Research Logistics (NRL)
  • Yimin Wang +1
  • Research Article
  • Citations54

A Theoretical Model of Manufacturing Lead Times and Their Relationship to a Manufacturing Goal Hierarchy

  • Sep 01, 1996
  • Decision Sciences
  • John G Wacker
  • Book Chapter

Inventory Policies in Blood Bank Management

  • Jan 01, 2018
  • Farah Hani Jamaludin +4
  • Research Article
  • Citations54

Optimal supply planning in MRP environments for assembly systems with random component procurement times

  • Oct 01, 2008
  • International Journal of Production Research
  • M A Louly +2
  • Research Article
  • Citations24

Computational algorithmic procedure of optimal inventory policy involving a negative exponential crashing cost and variable lead time demand

  • Aug 17, 2006
  • Applied Mathematics and Computation
  • Jong-Wuu Wu +2
  • Research Article
  • Citations46

Reducing lead time risk through multiple sourcing: the case of stochastic demand and variable lead time

  • Jan 01, 2013
  • International Journal of Production Research
  • Christoph H Glock +1
  • Research Article
  • Citations167

Involvement of controllable lead time and variable demand for a smart manufacturing system under a supply chain management

  • Jun 24, 2021
  • Expert Systems with Applications
  • Bikash Koli Dey +2
  • Research Article
  • Citations25

QMCD approach for perishability models: The (S, s) control policy with lead time

  • Jul 10, 2019
  • IISE Transactions
  • Yonit Barron +1
  • Research Article
  • Citations67

The MPS parameterization under lead time uncertainty

  • Nov 06, 2003
  • International Journal of Production Economics
  • Mohamed-Aly Ould-Louly +1
  • Research Article
  • Citations197

Supply planning under uncertainties in MRP environments: A state of the art

  • Jan 01, 2007
  • Annual Reviews in Control
  • Alexandre Dolgui +1
  • PDF
  • Research Article
  • Citations11

Effective Investment to Reduce Setup Cost in a Mixture Inventory Model Involving Controllable Backorder Rate and Variable Lead Time with a Service Level Constraint

  • Jan 01, 2012
  • Mathematical Problems in Engineering
  • Hsien-Jen Lin
  • Research Article
  • Citations79

Min–max distribution free continuous-review model with a service level constraint and variable lead time

  • Jan 07, 2014
  • Applied Mathematics and Computation
  • Ilkyeong Moon +2
  • Research Article
  • Citations1

Cadeias de Suprimentos “Leagile” e a Geração de Valor

  • Oct 13, 2014
  • Organizações e Sustentabilidade
  • Ernani Carpenedo Busanelo
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.