• Home
  • Search
  • The MPS parameterization under lead time uncertainty
  • Cite Icon67
  • https://doi.org/10.1016/j.ijpe.2003.08.008Copy DOI Icon

The MPS parameterization under lead time uncertainty

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

The MPS parameterization under lead time uncertainty

Similar Papers
  • Research Article
  • Citations54

Optimal supply planning in MRP environments for assembly systems with random component procurement times

  • Oct 01, 2008
  • International Journal of Production Research
  • M A Louly +2
  • Research Article
  • Citations68

To wait or not to wait: Optimal ordering under lead time uncertainty and forecast updating

  • Oct 07, 2009
  • Naval Research Logistics (NRL)
  • Yimin Wang +1
  • Research Article
  • Citations78

LT variance or LT mean reduction in supply chain management: Which one has a higher impact on SC performance?

  • Dec 24, 2009
  • International Journal of Production Economics
  • S Kamal Chaharsooghi +1
  • Research Article
  • Citations197

Supply planning under uncertainties in MRP environments: A state of the art

  • Jan 01, 2007
  • Annual Reviews in Control
  • Alexandre Dolgui +1
  • Research Article
  • Citations13

A continuous review inventory model with controllable backorder rate and investments

  • Mar 01, 2009
  • International Journal of Systems Science
  • R Uthayakumar +1
  • Research Article
  • Citations182

TECHNICAL NOTEA note on lead time and distributional assumptions in continuous review inventory models

  • Nov 01, 1998
  • Computers & Operations Research
  • Ilkyeong Moon +1
  • Research Article
  • Citations167

Involvement of controllable lead time and variable demand for a smart manufacturing system under a supply chain management

  • Jun 24, 2021
  • Expert Systems with Applications
  • Bikash Koli Dey +2
  • Research Article
  • Citations27

Robust design of (s, S) inventory policy parameters in supply chains with demand and lead time uncertainties

  • Nov 15, 2013
  • International Journal of Systems Science
  • Kamran Karimi Movahed +1
  • Research Article

Component and process commonalities in production system under various uncertain factors

  • Dec 04, 2010
  • AFRICAN JOURNAL OF BUSINESS MANAGEMENT
  • M A Wazed +2
  • PDF
  • Research Article
  • Citations11

Effective Investment to Reduce Setup Cost in a Mixture Inventory Model Involving Controllable Backorder Rate and Variable Lead Time with a Service Level Constraint

  • Jan 01, 2012
  • Mathematical Problems in Engineering
  • Hsien-Jen Lin
  • Research Article
  • Citations7

Inventory Models Involving Lead Time Crashing Cost as an Exponential Function

  • Jun 30, 2016
  • International Journal of Managing Value and Supply Chains
  • Vijayashree M +1
  • Research Article
  • Citations36

A robust fuzzy stochastic model for the responsive-resilient inventory-location problem: comparison of metaheuristic algorithms

  • Mar 04, 2021
  • Annals of Operations Research
  • Sina Nayeri +3
  • Research Article
  • Citations1

Raw Material Inventory Control on Probabilistic Demand and Lead Time Using Continuous Review System

  • Jan 31, 2024
  • Journal of Industrial Engineering and Halal Industries
  • Ali Parkhan +3
  • Research Article
  • Citations96

Setup cost reduction in an inventory model with finite-range stochastic lead times

  • Jan 01, 1990
  • International Journal of Production Research
  • Farrokh Nasri +2
  • Research Article
  • Citations20

Influence of lot size and planned lead time on service level and inventory for a single-stage production system with advance demand information and random required lead times

  • Aug 03, 2015
  • International Journal of Production Economics
  • Klaus Altendorfer
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.