Continuous Adjustments and the Reality Test in Managing Complex Projects

Show More
  • Abstract
  • Literature Map
  • Similar Papers
Abstract

The state-of-the-art in the practice of probabilistic network planning for complex construction projects PERT (Program Evaluation Review Technique) is evaluated along the lines of thought of the reality test that was introduced in the workshop “Error in the Sciences”, Lorentz Center, Leiden University, 2011. The conclusion is that the application of the PERT-methodology during project execution can be improved by: including in the planning software the actual durations of the activities as soon as these are finished; monitoring progress by keeping the probability of timely completion just over 50%; and adopting risk ranking for prioritising managerial attention.

Similar Papers
  • Research Article
  • Citations23

A dependent project evaluation and review technique: A Bayesian network approach

  • Jul 30, 2019
  • European Journal of Operational Research
  • Johan René Van Dorp
  • Research Article

Enhancing programevaluation and review technique (PERT) for construction project scheduling with Bayesian updating and appropriate probability distributions

  • Dec 25, 2024
  • Journal of Science and Technology in Civil Engineering (JSTCE) - HUCE
  • Nguyen Anh Duc
  • Research Article

Critical Path Identification and Time Estimation in Construction: Application of PDM and PERT

  • Nov 24, 2024
  • Jurnal Sipakatau: Inovasi Pengabdian Masyarakat
  • Gufran Darma Dirawan +5
  • Research Article

Improving Project Time Estimation in Game Development: Rayleigh Distribution and Program Evaluation and Review Technique Approach

  • Jan 20, 2025
  • Jurnal sosial dan sains
  • Mochamad Haikal Ghiffari +1
  • Conference Article
  • Citations2

Random Simulation Method for the PERT Network Based on the CrystalBall and Excel Environment

  • Sep 01, 2011
  • Hongxiang Ouyang +1
  • Research Article
  • Citations2

Scheduling The Construction of Low-Income Community Houses in Palu City Using the Probabilistic Duration Method

  • Jun 01, 2024
  • IOP Conference Series: Earth and Environmental Science
  • A Setiawan +2
  • Research Article
  • Citations1

A Comparative Analysis of the CPM and PERT Methods in Project Time Management for a High-Rise Building Construction Project in Yogyakarta

  • May 01, 2025
  • Sustainable Civil Building Management and Engineering Journal
  • Fazabella Wijaya Santoso +2
  • Research Article
  • Citations1

ANALISIS PELAKSANAAN PENJADWALAN PROYEK PEMBANGUNAN GEDUNG CLUBHOUSE DENGAN PENDEKATAN CPM DAN PERT PADA PT. XY

  • Apr 30, 2018
  • JKIE (Journal Knowledge Industrial Engineering)
  • Kasid Kasid +1
  • Research Article
  • Citations1

An Engineer’s Introduction to PERT Scheduling and Control

  • Apr 01, 1966
  • Marine Technology and SNAME News
  • Vernon C Honsinger
  • Research Article
  • Citations27

New Method for Calculating Path Float in Program Evaluation and Review Technique (PERT)

  • Sep 15, 2003
  • Journal of Construction Engineering and Management
  • Deng Hua Zhong +1
  • Research Article
  • Citations24

RPERT: Repetitive-Projects Evaluation and Review Technique

  • Sep 12, 2013
  • Alexandria Engineering Journal
  • Remon Fayek Aziz
  • Research Article
  • Citations23

Project Control Based on a Mutual Application of Pert and Earned Value Management Methods

  • Jan 01, 2016
  • Procedia Engineering
  • Anastasiia Mishakova +3
  • Research Article

Penjadwalan Waktu Menggunakan Metode Program Evaluation and Review Technique (PERT)

  • Mar 31, 2024
  • Surya Beton : Jurnal Ilmu Teknik Sipil
  • Ferdi Novanto +2
  • Research Article

A Dynamic Operations Research Framework for Military Logistics and Resource Allocation Under Uncertainty: A War Simulation Case Study

  • Jan 01, 2026
  • SSRN Electronic Journal
  • Atharva Nirdesh Varshney +1
  • Conference Article
  • Citations8

Engineering, procurement and construction (EPC) project management for reducing cost and time: A case study of petrochemical plant

  • May 01, 2018
  • Supakan Sangroungrai +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.