• Home
  • Search
  • COST ANALYSIS FOR EQUIPMENT REPLACEMENT.
  • https://doi.org/10.2308/tar-7051456Copy DOI Icon

COST ANALYSIS FOR EQUIPMENT REPLACEMENT.

Show More
  • Abstract
  • Literature Map
  • Similar Papers
Abstract

Abstract The analysis of costs for use in equipment replacement decisions is not a new topic, for much has been said and written on the subject. However, one who reads this literature finds advocated a confusing diversity of formulas and methods for computing and comparing costs. The objective of this article is therefore to examine these differences and to develop an approach to the problem which will be logically sound and also workable in the solution of practical business problems. It will be limited to methods of determining and comparing costs for use in deciding whether or not to replace an existing piece or type of equipment with a new or different machine capable of performing the same function. The first step in developing a method for analysis of costs to be used in decisions as to replacement of equipment must be a clear statement of the principle underlying the comparison of alternatives in the selection of equipment. From this it is possible to determine what facts are needed and with this in mind one can proceed to collect the data. A cost comparison can then be made with assurance that the results will be reliable within the limits of the precision with which the cost figures have been measured. It will also be found that this approach can simplify a problem the solution to which has often been made complex and confusing.

Similar Papers
  • Research Article
  • Citations2

Analyzing the Impact of Depreciation-Estimating Methods on State Transportation Agencies’ Equipment Replacement Decisions Using Dynamic Programming

  • Jul 01, 2023
  • Journal of Management in Engineering
  • Lei Qiao +4
  • Research Article
  • Citations1

Right-Sizing and Replacing the Right Equipment at the Right Time

  • May 01, 2011
  • Biomedical Instrumentation & Technology
  • Jill Schlabig Williams
  • Research Article
  • Citations10

Integrating mining loading and hauling equipment selection and replacement decisions using stochastic linear programming

  • Dec 07, 2015
  • International Journal of Mining, Reclamation and Environment
  • Gabriel Santelices +4
  • Research Article
  • Citations5

Deposition patterns on garments during application of lawn and garden chemicals: A comparison of six equipment types

  • Aug 01, 1992
  • Archives of Environmental Contamination and Toxicology
  • Karen K Leonas +1
  • Research Article
  • Citations3

An input-output model for equipment replacement decisions

  • Apr 01, 1987
  • Engineering Costs and Production Economics
  • J.M.A Tanchoco
  • Research Article
  • Citations18

Markov chain optimization of repair and replacement decisions of medical equipment

  • May 24, 2021
  • Resources, Conservation and Recycling
  • Hao-Yu Liao +2
  • Conference Article

Upgrade vs. replacement: a practical guide to decision-making [industrial power apparatus

  • May 03, 1995
  • D.T Hart +1
  • Research Article

Don't Be Shy and Retiring With Old Equipment

  • Jul 01, 2011
  • Biomedical Instrumentation & Technology
  • Robert H Stiefel
  • Conference Article
  • Citations11

Vision in Protection and Control Area ¿ Meeting the Challenges of 21st Century

  • Jan 01, 2006
  • V Madani +4
  • PDF
  • Research Article
  • Citations25

Elaboration of the equipment replacement terms taking into account wear and tear and obsolescence

  • Jun 14, 2018
  • Eastern-European Journal of Enterprise Technologies
  • Inna Lapkina +1
  • Conference Article
  • Citations1

Maintenance scheduling of flood control plant under uncertainty based on multi-objective optimization

  • Mar 01, 2018
  • Isao Takami +3
  • Research Article
  • Citations13

Single-Use versus Reusable Endoscopes for Percutaneous Biliary Endoscopy with Lithotripsy: Technical Metrics, Clinical Outcomes, and Cost Comparison

  • Dec 24, 2021
  • Journal of Vascular and Interventional Radiology
  • Sharon Pang +4
  • Research Article
  • Citations77

A Cost Analysis of Carpal Tunnel Release Surgery Performed Wide Awake versus under Sedation.

  • Dec 01, 2018
  • Plastic & Reconstructive Surgery
  • Todd H Alter +3
  • Book Chapter

5 - Equipment Selection

  • Jan 01, 2001
  • Compressor Performance
  • M Theodore Gresh
  • Book Chapter
  • Citations11

Planning, Designing and Optimising Production Using Geostatistical Simulation

  • Jan 01, 2018
  • P A Dowd +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.