Planning, Designing and Optimising Production Using Geostatistical Simulation

  • Jan 1, 2018
  • P A Dowd +1 more
Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

The full potential of geostatistical simulation as a tool for planning, designing and optimising production is only realised when it is integrated within the entire design and production cycle. In the planning and design stages this involves the simulation of components of the production cycle that depend on (simulated) grades and geology. In the production stage it involves integration with the mining method and the type and use of equipment. This paper explores the general concepts of integrated geostatistical simulation and illustrates them with particular reference to blast design, equipment selection and the associated quantification of ore loss, ore dilution and the ability to select ore on various scales. The critical component of most metalliferous open pit mining operations is ore selection, i.e. the minimisation of ore loss and ore dilution during extraction. In general, extraction comprises drilling, blasting and loading, all of which are planned and designed on the basis of uncertain models of geology and grade. The application describes the integration of geostatistically simulated grade, geological and geomechanical models with blast modelling to provide a link between the estimated in situ characteristics of the orebody and the locations of the same (displaced) characteristics following the blast. This approach provides a means of evaluating different types of selection and thereby enables planners to optimise the selection process in terms of blast design, type and size of loading equipment, maximisation of ore recovery and minimisation of ore loss and dilution. This conversion of the in situ/block model resource to a realistically recoverable reserve may, in many instances, be the most significant source of uncertainty in reserve estimation.

Similar Papers
  • Research Article

Some basic improvements in mineral resource estimation and reporting

  • Jan 13, 2025
  • CIM Journal
  • B W Downing +1
  • Research Article
  • Citations7

Measured anatomical distributions of solar UVR on strawberry production workers in Italy.

  • Apr 03, 2014
  • Journal of agricultural safety and health
  • Giorgia Nardini +2
  • Research Article
  • Citations8

Critical points for the maintenance of genetic variability over a production cycle in the European sea bass, Dicentrarchus labrax

  • Aug 16, 2013
  • Aquaculture
  • Patricia Novel +6
  • Front Matter
  • Citations1

Multidetector-row CT: high performance but still many questions

  • Feb 15, 2003
  • European Journal of Radiology
  • Pr Alain Blum
  • Research Article
  • Citations4

Optimal Path Planning Algorithm with Built-In Velocity Profiling for Collaborative Robot.

  • Aug 17, 2024
  • Sensors (Basel, Switzerland)
  • Rafal Szczepanski +3
  • Research Article
  • Citations20

Optimal rail profile design for a curved segment of a heavy haul railway using a response surface approach

  • Sep 02, 2015
  • Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit
  • Jianxi Wang +3
  • Research Article

COST ANALYSIS FOR EQUIPMENT REPLACEMENT.

  • Jan 01, 1947
  • The Accounting Review
  • Walter B Mcfarland
  • Research Article
  • Citations4

Response of Layer Breeders to Dietary Acetylsalicylic Acid.: 4. Egg Residue Studies

  • Jun 01, 1993
  • Poultry Science
  • Christopher D Mcdaniel +5
  • Research Article

4. Extraction

  • Jan 01, 2001
  • Geological Society, London, Engineering Geology Special Publications
  • Research Article
  • Citations5

Integrated energy system planning method considering electric-heat-gas coupling

  • Sep 01, 2020
  • IOP Conference Series: Earth and Environmental Science
  • Nan Wang +5
  • Research Article
  • Citations17

A new approach for the geological risk evaluation of coal resources through a geostatistical simulation

  • Sep 10, 2011
  • Arabian Journal of Geosciences
  • Omid Ashgari +1
  • Conference Article

Performance monitoring: controlling your costs by defining your desired service level and performance criteria [telecommunication powering

  • Oct 29, 1995
  • J.A.J Van Dongen
  • Research Article

ОПРЕДЕЛЕНИЕ ВОЗДУХООБМЕНА РЕПРОДУКТОРНОГО ТЕХНОЛОГИЧЕСКОГО МОДУЛЯ С РЕКОМЕНДАЦИЯМИ ПО ПОДБОРУ НЕОБХОДИМОГО ВЕНТИЛЯЦИОННОГО ОБОРУДОВАНИЯ

  • Jan 01, 2024
  • Техника и технологии в животноводстве
  • I.E Plaksin +1
  • Conference Article
  • Citations3

The making of IEEE 1683 - an introduction and behind the scenes look

  • Jun 01, 2016
  • Marcelo E Valdes +2
  • Research Article
  • Citations30

Optimization of folate deposition in eggs through dietary supplementation of folic acid over the entire production cycle of Hy-Line W36, Hy-Line W98, and CV20 laying hens

  • Mar 01, 2010
  • Journal of Applied Poultry Research
  • T.M Dickson +4
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.