• Home
  • Search
  • Drill String Failure Analysis and Erosion Wear Study at Key Point for Gas Drilling
  • Open Access IconOpen Access
  • Cite Icon7
  • https://doi.org/10.1260/0144-5987.32.3.553Copy DOI Icon

Drill String Failure Analysis and Erosion Wear Study at Key Point for Gas Drilling

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Erosion wear at the key point of a drill string is very severe in gas drilling. The investigation shows that failure of drill string is very serious in gas drilling. The probability of failure of the drill pipe and the drill collar is the highest in all the drill string, and the near placement of pin and box is often damaged. According to the investigation of drill string failure and erosion theory, the erosion model of drill string is established. The erosion rate at the key point of a drill string is solved using the Grant and Tabakoff formula. Different factors, such as gas injection volume, rate of penetration (ROP), cuttings' diameter, cuttings' shape factor, cuttings' number, and temperature of the annulus, are considered. The result shows that the erosion rate at the key point is more severe than that of other locations on the drill pipe. Because of higher peak stress for a drill string with eroded wear, there is a more serious effect on the residual strength of a drill string with eroded wear. Crack forms easily, due to severe erosive wear and deeper pits. Also, fracture failure of a drill string is caused by larger axial load and torque. In this paper, analysis of such influencing parameters as gas injection volume, ROP, cuttings' particle size, cuttings' shape factor, cuttings number and temperature of the annulus is conducted, among which gas injection volume, ROP and cuttings number are proven as the main controlling factors that affect the erosion wear at the key point of a drill pipe.

Similar Papers
  • Research Article
  • Citations28

Experimental and numerical study of drill pipe erosion wear in gas drilling

  • Sep 13, 2012
  • Engineering Failure Analysis
  • Xiaohua Zhu +4
  • Conference Article
  • Citations4

High Performance, Slim-hole Drilling with 4 in. Drill Pipe and a Streamline Connection

  • Sep 13, 2004
  • Guillaume J Plessis +3
  • Conference Article
  • Citations8

The Effect Of Hole Curvature On Drill Pipe While Drilling Inside Casing Or Open Hole

  • Oct 09, 1977
  • Tommy Warren
  • Research Article
  • Citations9

Stress Analysis on Drilling String Vibration in Gas Drilling

  • Jan 01, 2012
  • Energy Procedia
  • Fu Jianhong +6
  • Conference Article

Vibration wave characteristics in Conventional and Periodic Drill string models

  • Jan 01, 2016
  • Fesmi Abdul Majeed +1
  • Research Article
  • Citations2

Simulation of Drill Pipe Lateral Vibration due to Riser's Oscillation

  • Dec 04, 2013
  • Advanced Materials Research
  • Nabil Al Batati +2
  • Conference Article

A CFD Based Correlation for Erosion Factor for Long-Radius Elbows and Bends

  • Feb 05, 2001
  • Jianrong Wang +1
  • Conference Article
  • Citations2

A Novel Tool to Improve Rate of Penetration–Down-hole Drilling String Absorption & Hydraulic Supercharging Device

  • Oct 26, 2015
  • Hongning Zhang +3
  • Conference Article

Causes and Remedies of Drillstring Failures while Drilling Medium Radius Horizontal Wells (Field Study)

  • Sep 11, 2000
  • IADC/SPE Asia Pacific Drilling Technology
  • M M Amro
  • Conference Article
  • Citations1

Further Developments in Drill Pipe Fatigue Management: A Case Study

  • Mar 17, 2009
  • R F Zoanni +3
  • Conference Article
  • Citations3

Effect of Formations Compressive Strength on Drill String Vibrations

  • Mar 26, 2013
  • Abdolali Esmaeili +3
  • Research Article
  • Citations10

Advantages of Heavy Metal Collars in Directional Drilling and Deviation Control

  • May 01, 1976
  • Journal of Petroleum Technology
  • W.B Bradley +3
  • Conference Article
  • Citations11

Oil and Gas Drill Bit Technology and Drilling Application Engineering Saves 77 Drilling Days on the World’s Deepest Engineered Geothermal Systems EGS Wells

  • Mar 08, 2021
  • Jennifer Cardoe +4
  • Conference Article
  • Citations6

Solving the Deccan Trap Drilling Challenge with Innovative Ridged and Conical Diamond Elements Technology

  • Nov 11, 2019
  • Anshul Sharma +5
  • Research Article
  • Citations5

Analysis of critical whirling velocity of drill string

  • Apr 30, 2021
  • Energy Sources, Part A: Recovery, Utilization, and Environmental Effects
  • Jialin Tian +3
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.