Abstract

In this paper, we consider a parallel machine scheduling problem with non-renewable resources. Each job consumes several components and must be processed in one stage composed of identical parallel machines. Resources availability operations, jobs assignment and sequencing are considered and optimized simultaneously. In order to find an optimal solution, an exact method is applied to optimize the total completion time. Due to the problem complexity and prohibitive computational time to obtain an exact solution, a metaheuristic approach based genetic algorithm is proposed and several heuristics are adapted to solve it. Moreover, the impact of non-renewable resources procurement methods on production scheduling is analyzed. The system performances are evaluated in terms of measures such as the solution quality and the execution time. The simulation results show that the proposed genetic algorithm gives the same results as the exact method for small instances and performs the best compared to heuristics for medium and large instances.

Similar Papers
  • Research Article
  • Citations13

Heuristics to minimize the completion time variance of jobs on a single machine and on identical parallel machines

  • May 26, 2016
  • The International Journal of Advanced Manufacturing Technology
  • Raju Rajkanth +2
  • Research Article
  • Citations46

A vibration damping optimization algorithm for a parallel machines scheduling problem with sequence-independent family setup times

  • Mar 06, 2015
  • Applied Mathematical Modelling
  • Esmaeil Mehdizadeh +2
  • Research Article
  • Citations82

Scheduling identical parallel machines with tooling constraints

  • Aug 10, 2016
  • European Journal of Operational Research
  • Andreza Cristina Beezão +3
  • Research Article
  • Citations30

Minimizing the total completion time on a parallel machine system with tool changes

  • Dec 05, 2015
  • Computers & Industrial Engineering
  • A Costa +2
  • Research Article
  • Citations231

A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines

  • Apr 12, 2002
  • Computers & Operations Research
  • Jeffery K Cochran +2
  • Book Chapter
  • Citations2

Identical Parallel-Machine Scheduling and Worker Assignment Problem Using Genetic Algorithms to Minimize Makespan

  • Jan 01, 2011
  • Imran Ali Chaudhry +1
  • Research Article
  • Citations7

Dispatching problems for parallel machines in the TFT‐LCD assembly process

  • Dec 09, 2019
  • International Transactions in Operational Research
  • Jyh‐Wen Ho +2
  • Research Article
  • Citations42

A swarm optimization approach for flexible flow shop scheduling with multiprocessor tasks

  • Dec 04, 2011
  • The International Journal of Advanced Manufacturing Technology
  • Manas Ranjan Singh +1
  • Research Article
  • Citations4

Parallel Machine Scheduling on Jobs and Partial Maintenance Activities due to job-Dependent Machine Deteriorations

  • Jan 12, 2019
  • American Journal of Mathematical and Management Sciences
  • Hao Tian +2
  • Research Article

Arc-based formulation and GRASP-enhanced iterated greedy algorithm for identical parallel machine scheduling with a common server

  • Dec 11, 2025
  • Swarm and Evolutionary Computation
  • Alper Hamzadayı +1
  • PDF
  • Research Article
  • Citations18

A Genetic Algorithm for Ship Routing and Scheduling Problem with Time Window

  • Jan 01, 2012
  • American Journal of Operations Research
  • Khaled Al-Hamad +2
  • PDF
  • Research Article
  • Citations8

Integrated Scheduling of Tasks and Preventive Maintenance Periods in a Parallel Machine Environment With Single Robot Server

  • Jan 01, 2021
  • IEEE Access
  • Lotfi Hidri +3
  • Research Article
  • Citations20

A genetic algorithm for the multi-stage and parallel-machine scheduling problem with job splitting – A case study for the solar cell industry

  • Aug 01, 2013
  • International Journal of Production Research
  • Chen-Yang Cheng +3
  • Research Article
  • Citations34

Approximation algorithms for minimizing total weighted completion time of orders on identical machines in parallel

  • Feb 21, 2006
  • Naval Research Logistics (NRL)
  • Joseph Y‐T Leung +2
  • Research Article
  • Citations53

A robust Island Parallel Genetic Algorithm for the Quadratic Assignment Problem

  • Jul 01, 2013
  • International Journal of Production Research
  • Umut Tosun +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.