Egyptian Deepwater Development, a Case Study

  • May 5, 2003
  • Metwaly Toubar +3 more
Show More
  • Abstract
  • Literature Map
  • Citations
  • Similar Papers
Abstract

Abstract The Burullus Gas Company, a sister company of the Rashid Petroleum Company (Rashpetco), operates the West Delta Deep Marine Concession. (WDDM) on behalf of partners: Egyptian Government Petroleum Corperation (EGPC), BG Group and Edison Gas. This paper describes the first deepwater offshore completion operations conducted in Egypt as part of the Scarab/Saffron development. The two fields are located in water depths ranging from 400 to 650m and are situated some 90km offshore the Nile Delta. The development consists of 8 vertical sub-sea wells that were drilled and completed to depths ranging from 1800 to 2100 meters TVDSS. The original budgeted time for the completion operations was 36 days per well. The last well to be completed took less than 14 days, which approached the perceived technical limit for the operations. The paper will provide a detailed description of the completion operations and the lessons learned for this development. It will also identify a number of improvements and modifications that were implemented This paper will focus on the completion operations from sand phase completion to clean up and suspension operations Introduction The Burullus Gas Company, a sister company of the Rashid Petroleum Company (Rashpetco), operates the West Delta Deep Marine Concession (WDDM) on behalf of partners EGPC, BG Group and Edison Gas. The concession contains the Scarab and Saffron Reservoirs, discovered in 1997. The fields are located in water depths ranging from 400 to 650m and are situated some 90km offshore the Nile Delta. This is the first deepwater gas field development in Egypt. Phase 1 of the development consists of 8 vertical sub-sea wells that were drilled and completed to depths ranging from 1800 to 2100 meters TVDSS. (Figure-1) Scarab Saffron represents a significant milestone for the Egyptian Oil and Gas industry, as it is the first advanced subsea development. Development of the fields commenced in the later part of 1999. A number of the development wells were pre-drilled in 2001 to obtain early reservoir information to assist in the completions design. Completion operations commenced in April 2002. Considerable focus was given to the adoption of "best practices" for efficient drilling and completion installation through use of the BG Group's Total Value Drilling (TVD) initiative. With operating costs approaching US$200,0000 per day, a major part of the well cost is rig time. As a result, a considerable amount of time was spent optimizing the well design and thus reducing the operational sequence to minimize rig time. Completion operations have shown a significant learning curve and best in class performance resulting in the final sub-sea completion being run in under 14 days. This has resulted in estimated saving of over $20m in the overall drilling and completion costs against the overall project budget. (Figure-2) Completion Design Sand Control The reservoirs comprise a number of unconsolidated, highly permeable sand channels of plio-pleistecene age within El-Wastani formation. A comprehensive database of information on these formations has been collected during exploration and appraisal drilling. Data from logs and well tests has shown a tendency for sand production even at low drawdowns. Sand control therefore formed an integral part of the completion design.

Similar Papers
  • Research Article

Technology Focus: Offshore Production and Flow Assurance

  • Nov 01, 2015
  • Journal of Petroleum Technology
  • Sally A Thomas
  • Conference Article
  • Citations3

Single-Trip Subsea Completions

  • May 02, 1994
  • K.J Johnson +4
  • Conference Article
  • Citations1

Fast Track Sand Control and Sand Management Review and Implementation in a Subsea Development

  • May 30, 2007
  • Frederic Jean-Bernard Guinot +4
  • Research Article
  • Citations3

Gas–Water–Sand Inflow Patterns and Completion Optimization in Hydrate Wells with Different Sand Control Completions

  • Nov 15, 2024
  • Journal of Marine Science and Engineering
  • Chenfeng Liu +4
  • Research Article

Sand Settling in a Subsea Production System

  • Dec 01, 2010
  • Journal of Petroleum Technology
  • Karen Bybee
  • Research Article

Single-Trip Multizone Gravel Packing

  • Sep 01, 2009
  • Journal of Petroleum Technology
  • Karen Bybee
  • Conference Article
  • Citations2

Marlim Field: The Evolution of Deepwater Drilling/Completion/Workover

  • May 03, 1999
  • Andre Lima Cordeiro +2
  • Conference Article
  • Citations4

A Subsea Reeled Tubing Service Unit

  • Sep 05, 1989
  • C C Cobb +1
  • Conference Article
  • Citations4

Review of a Multi-Lateral Drilling and Stimulation Program

  • Nov 23, 1997
  • D.K Triolo +1
  • Conference Article

Multifaceted Smart Completion Application: A Gulf of Mexico Case Study

  • Apr 22, 2024
  • J P Manning +3
  • Conference Article
  • Citations21

A Review of Horizontal Drilling and Completion Techniques for Recovery of Coalbed Methane

  • Nov 18, 1996
  • Samuel O Osisanya +1
  • Conference Article

Gullfaks A Subsea Wells System Development, Completion, and Production Startup

  • Apr 27, 1987
  • O Inderberg +1
  • Conference Article
  • Citations5

A Case Study Using a Remotely Controlled Downhole Valve for Completion Installation

  • Sep 30, 2013
  • Keith Oddie +2
  • Research Article
  • Citations1

Sanding: An Expert-System Approach for Assessment and Control in Wells

  • Dec 01, 1997
  • Journal of Energy Resources Technology
  • M Kanj +2
  • Conference Article

A Cost Effective Newbuild Semisubmersible Floating Production Platform

  • May 06, 1996
  • Richad D&Apos;Souza +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.