• https://doi.org/10.13023/ktc.rr.2004.30Copy DOI Icon

Environmental Commitment Follow-Up

Show More
  • Abstract
  • Literature Map
  • Similar Papers
Abstract

Three recently completed road construction projects were investigated to determine Kentucky Transportation Cabinet (KYTC) effectiveness in implementing project commitments (including environmental commitments). Documentation was obtained from KYTC districts in which the projects were constructed and KYTC officials involved with the projects from planning through construction were interviewed. The projects were inspected to audit completion of project commitments. Key stakeholders (officials of local governments, resource agencies, metropolitan planning organizations, interest groups, and adjacent landowners) were interviewed about the projects. They were asked to grade KYTC for implementation of project commitments using a standard report card format. The findings for these investigations are presented. The auditing procedure employed in this study can be used to rate future KYTC projects, identify problems, and suggest solutions.

Similar Papers
  • Research Article

Jurisdictional Roadside Ditches

  • Oct 12, 2016
  • UKnowledge (University of Kentucky)
  • Sarah M Mccormack +2
  • Research Article
  • Citations2

Assessment of Data Collection for ESAL Determinations for the Kentucky Transportation Cabinet, Division of Planning

  • Aug 26, 2013
  • UKnowledge (University of Kentucky)
  • David Q Hunsucker +1
  • Research Article
  • Citations6

Contractor Performed Quality Control on KyTC Projects

  • Aug 30, 2013
  • UKnowledge (University of Kentucky)
  • Donn E Hancher +2
  • Supplementary Content

Highway-Railway At-Grade Crossings: Rideability Measurements and Assessments

  • Jun 26, 2013
  • UKnowledge (University of Kentucky)
  • Jerry G Rose +3
  • Research Article
  • Citations3

Quantifying roadside assessment for highway safety.

  • Sep 28, 2017
  • UKnowledge (University of Kentucky)
  • Reginald R Souleyrette +2
  • Research Article

Assessment of Kentucky's Historic Truss Bridges

  • May 06, 2014
  • UKnowledge (University of Kentucky)
  • Lenahan O’Connell +2
  • Research Article

Identifying Significant Environmental Features Using Feature Recognition

  • Nov 06, 2015
  • UKnowledge (University of Kentucky)
  • Megan White +3
  • Research Article
  • Citations1

Development of ESAL Forecasting Procedures for Superpave Pavement Design

  • Jan 06, 2014
  • UKnowledge (University of Kentucky)
  • Brad W Rister +1
  • Research Article
  • Citations13

REDUCTION OF STRESSES ON BURIED RIGID HIGHWAY STRUCTURES USING THE IMPERFECT DITCH METHOD AND EXPANDED POLYSTYRENE (GEOFOAM)

  • Jun 29, 2013
  • UKnowledge (University of Kentucky)
  • Liecheng Sun +2
  • Research Article

Construction Training for the Current and Next Generation of Technicians (TA-32)

  • May 29, 2013
  • UKnowledge (University of Kentucky)
  • Paul M Goodrum +1
  • Research Article
  • Citations1

Preventive Maintenance Program for Bridges

  • Oct 12, 2016
  • UKnowledge (University of Kentucky)
  • Theodore Hopwood +3
  • Research Article
  • Citations1

İlköğretim Sosyal Bilgiler ve Fen Bilgisi Öğretiminde Öğretmenlerin Dersin Geliştirme Bölümü Etkinliklerine İlişkin Öğrenci Görüşleri

  • May 01, 2005
  • Kuram ve Uygulamada Egitim Yönetimi Dergisi
  • Semra Demir +1
  • Research Article
  • Citations5

Ore Grade Reconciliation Techniques – A Review

  • Oct 22, 2015
  • Journal of Geosciences and Geomatics
  • Richard Amoako +1
  • Research Article

ANALISIS DAN PENGEMBANGAN BUKU AJAR KIMIA KELAS X SEMESTER I SMK FARMASI SESUAI KTS

  • Jan 01, 2014
  • Boni Mariska Ratnawati +2
  • Research Article

Prospective follow up of children with anorectal malformation: our center experience until 10 years of age.

  • Jan 01, 2016
  • SHILAP Revista de lepidopterología
  • Leily Mohajerzadeh +10
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.