• Home
  • Search
  • Contractor Performed Quality Control on KyTC Projects
  • Cite Icon6
  • https://doi.org/10.13023/ktc.rr.2002.26Copy DOI Icon

Contractor Performed Quality Control on KyTC Projects

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

This report addresses issues related to transferring the responsibility for quality control from the Kentucky Transportation Cabinet (KyTC) to construction contractors. Surveys of the KyTC, other state departments of transportation, and Kentucky highway contractors were done to identify the advantages, concerns, and modifications of the Contractor Performed Quality Control (CPQC) program. An advisory committee of experienced KyTC engineers, Federal Highway Administration representatives, and contractor representatives met periodically to identify approaches for handling key issues of the program. Several key topics related to CPQC are presented in this report, with emphasis on quality control/quality assurance (QC/QA) administration, QC/QA procedures, quality acceptance and verification testing, and CPQC training. Specific issues related to CPQC pay items in Kentucky are also discussed. Several recommendations have been proposed to enhance the program. If properly implemented, CPQC can improve a contractor's work performance and help relieve the State's burden for inspection. Additional monitoring of the program is necessary to make further improvements and to include other pay items.

Similar Papers
  • Research Article

Jurisdictional Roadside Ditches

  • Oct 12, 2016
  • UKnowledge (University of Kentucky)
  • Sarah M Mccormack +2
  • Research Article

Environmental Commitment Follow-Up

  • Aug 23, 2013
  • UKnowledge (University of Kentucky)
  • Theodore Hopwood +1
  • Research Article
  • Citations2

Assessment of Data Collection for ESAL Determinations for the Kentucky Transportation Cabinet, Division of Planning

  • Aug 26, 2013
  • UKnowledge (University of Kentucky)
  • David Q Hunsucker +1
  • Supplementary Content

Highway-Railway At-Grade Crossings: Rideability Measurements and Assessments

  • Jun 26, 2013
  • UKnowledge (University of Kentucky)
  • Jerry G Rose +3
  • Research Article
  • Citations3

Quantifying roadside assessment for highway safety.

  • Sep 28, 2017
  • UKnowledge (University of Kentucky)
  • Reginald R Souleyrette +2
  • Research Article

Assessment of Kentucky's Historic Truss Bridges

  • May 06, 2014
  • UKnowledge (University of Kentucky)
  • Lenahan O’Connell +2
  • Research Article

Identifying Significant Environmental Features Using Feature Recognition

  • Nov 06, 2015
  • UKnowledge (University of Kentucky)
  • Megan White +3
  • Research Article
  • Citations1

Development of ESAL Forecasting Procedures for Superpave Pavement Design

  • Jan 06, 2014
  • UKnowledge (University of Kentucky)
  • Brad W Rister +1
  • Research Article
  • Citations13

REDUCTION OF STRESSES ON BURIED RIGID HIGHWAY STRUCTURES USING THE IMPERFECT DITCH METHOD AND EXPANDED POLYSTYRENE (GEOFOAM)

  • Jun 29, 2013
  • UKnowledge (University of Kentucky)
  • Liecheng Sun +2
  • Research Article

Construction Training for the Current and Next Generation of Technicians (TA-32)

  • May 29, 2013
  • UKnowledge (University of Kentucky)
  • Paul M Goodrum +1
  • Research Article
  • Citations1

Preventive Maintenance Program for Bridges

  • Oct 12, 2016
  • UKnowledge (University of Kentucky)
  • Theodore Hopwood +3
  • PDF
  • Research Article
  • Citations32

An Extensive Quality Control and Quality Assurance (QC/QA) Program Significantly Improves Inter-Laboratory Concordance Rates of Flow-Cytometric Minimal Residual Disease Assessment in Acute Lymphoblastic Leukemia: An I-BFM-FLOW-Network Report.

  • Dec 06, 2021
  • Cancers
  • Margarita Maurer‐Granofszky +69
  • Research Article
  • Citations2

Author's Reply to "Comments on Classification and Reporting of Mineral Resources for High-Nugget Effect Gold Vein Deposits," by M. Vallee

  • Jan 01, 2002
  • Exploration and Mining Geology
  • S C Dominy
  • Research Article
  • Citations6

Construction QA/QC Systems: Comparative Analysis

  • Sep 01, 1980
  • Journal of the Construction Division
  • Jack H Willenbrock +1
  • Book Chapter

Quality Control, Radiation Safety and Maintenance Programs

  • Nov 06, 2016
  • Cari Borrás
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.