Examining the Value of Monte Carlo Simulation for Project Time Management

  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Research Question: This paper investigates whether the Monte Carlo simulation can be widely used as a practicable method for the analysis of the risks that impact project duration. Motivation: The main goal was to explore the use of the Monte Carlo simulation for project time management, and shed some light on the key benefits and drawbacks of this method. The paper reviewed the existing literature considering traditional use of the Monte Carlo for quantitative project risk analysis (such as Kwak & Ingall, 2007; Hulett, 2017) and elaborated the issue by suggesting potential improvements in terms of method modification for schedule management, such as event chain methodology proposed by Agarwal & Virine (2017). Another goal was to examine the capability of user-friendly software to provide project managers with some of these benefits. Idea: The core idea of this paper was to evaluate the value of the Monte Carlo method for project time and schedule management, by matching traditional foundations with modern techniques. Data: The paper used the secondary data extracted from relevant literature and project examples. A literature review reveals how the application of the Monte Carlo simulation evolved as a project management tool, along with specific benefits and concerns for its application. Tools: A detailed application of the Monte Carlo in predicting project duration is provided, and the applicability and viability of the method are proven through a case demonstration. Following the presentation of a practical example and discussion of the main features, some limitations and potential improvements to the Monte Carlo method are suggested. Findings: Even with the existence of certain limitations, the Monte Carlo simulation remains the primary method for quantitative analysis of project risks. Despite the Monte Carlo having been found to be applicable, adaptable and predictive of total project duration, it is found to be insufficiently used by practitioners. Contribution: The paper urges the need for research on successful diffusion of the Monte Carlo simulation and helps practitioners to understand the adaptability of the Monte Carlo simulation as a tool for risk quantification and its use for effective duration planning of their projects.

Similar Papers
  • Research Article

Research on Time Management and Risk Management of Small and Medium-Sized Enterprises

  • Oct 01, 2024
  • Science, Technology and Social Development Proceedings Series
  • Qicheng Gao
  • Conference Article
  • Citations2

Improvement of Project Control Management in a Chemical Plant

  • Jan 01, 2015
  • K Nutsiri +1
  • Research Article
  • Citations3

Uncertainty evaluation of blackout initiated accident sequences of a typical PHWR

  • Oct 19, 2011
  • Nuclear Engineering and Design
  • Prashant Tewari +4
  • Book Chapter
  • Citations3

A Daily Work Report Based Approach for Schedule Risk Analysis

  • Oct 11, 2019
  • Chau Le +1
  • Research Article
  • Citations3

Application of Quantitative Risk Assessment Techniques in Property Investment Appraisal in Enugu Urban, Nigeria

  • Jun 01, 2017
  • Journal of Land Management and Appraisal
  • Obinna Collins Nnamani
  • Conference Article

Comparison of State Department of Transportation Practices in Analyzing Risks for Large Infrastructure Projects

  • Dec 11, 2023
  • EPiC series in built environment
  • Joseph Shrestha +2
  • Research Article
  • Citations50

Risk analysis and fire safety engineering

  • Nov 01, 1998
  • Fire Safety Journal
  • Håkan Frantzich
  • Research Article
  • Citations81

Monte Carlo Simulation: Its Status and Future

  • Apr 01, 1997
  • Journal of Petroleum Technology
  • James A Murtha
  • Supplementary Content
  • Citations2

Coherent Quantitative Analysis of Risks in Agribusiness: Case of Ukraine

  • Dec 30, 2011
  • AgEcon Search (University of Minnesota, USA)
  • Arthur Tarasov
  • Conference Article
  • Citations2

Household Solar Water Heating System Investment Modelling and Risk Analysis

  • Jan 01, 2007
  • Luka Lugaric +2
  • Conference Article
  • Citations4

Research on Equipment Maintenance Time Management based on Risk Evaluation

  • Dec 01, 2018
  • Zhengkun Dai +2
  • Conference Article
  • Citations2

The calculation of component failure probability in the seismic PSA using Monte Carlo sampling

  • Nov 01, 2011
  • Chang-Hong Peng +2
  • Conference Article

Evaluation method of power grid construction project schedule management in the context of infrastructure digital management

  • Apr 03, 2023
  • Chen Chen +4
  • Dissertation

Implementation project management concept for installing devices of auto part assembly line

  • Jan 01, 2014
  • Patipat Kruechotikul
  • Research Article

Simulation Model for Investigation of Probable Activity Production Rates

  • Jun 01, 2025
  • International Journal of Innovative Research in Computer Science and Technology
  • Akash T
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.