Extended open shop scheduling with resource constraints: Appointment scheduling for integrated practice units

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

An Integrated Practice Unit (IPU) is a new approach to outpatient care in which a co-located multidisciplinary team of clinicians, technicians, and staff provide treatment in a single patient visit. This article presents a new integer programming model for an extended open shop problem with application to clinic appointment scheduling for IPUs. The advantages of the new model are discussed and several valid inequalities are introduced to tighten the linear programming relaxation. The objective of the problem is to minimize a combination of makespan and total job processing time, or in terms of an IPU, to minimize a combination of closing time and total patient waiting time. Feasible solutions are obtained with a two-step heuristic, which also provides a lower bound that is used to judge solution quality. Next, a two-stage stochastic optimization model is presented for a joint pain IPU. The expected value solution is used to generate two different patient arrival templates. Extensive computations are performed to evaluate the solutions obtained with these templates and several others found in the literature. Comparisons with the expected value solution and the wait-and-see solution are also included. For the templates derived from the expected value solution, the results show that the average gap between the feasible solution and lower bound provided by the two-step heuristic is 2% for 14 patients. They also show that either of the two templates derived from the expected value solution is a good candidate for assigning appointment times when either the clinic closing time or the patient waiting time is the more important consideration. Sensitivity analysis confirmed that the optimality gap and clinic statistics are stable for marginal changes in key resources.

Similar Papers
  • Conference Article
  • Citations1

Stochastic optimization formulations for reliability unit commitment runs

  • Jul 01, 2014
  • Kai Pan +3
  • Research Article
  • Citations22

Dynamic pooled capacity deployment for urban parcel logistics

  • Mar 03, 2022
  • European Journal of Operational Research
  • Louis Faugère +3
  • Research Article
  • Citations43

A Hybrid MILP and Benders Decomposition Approach to Find the Nucleolus Quota Allocation for a Renewable Energy Portfolio

  • Nov 01, 2015
  • IEEE Transactions on Power Systems
  • Lucas Freire +3
  • PDF
  • Book Chapter
  • Citations6

A Stochastic Optimization Model for Commodity Rebalancing Under Traffic Congestion in Disaster Response

  • Jan 01, 2019
  • Xuehong Gao
  • Research Article
  • Citations42

Two-stage stochastic optimization frameworks to aid in decision-making under uncertainty for variable resource generators participating in a sequential energy market

  • Apr 14, 2021
  • Applied Energy
  • Razan A.H Al-Lawati +4
  • Conference Article

Optimizing e-waste recycling networks under uncertain environment: a fourth-party logistics perspective

  • Aug 18, 2025
  • Dongsheng Dong +4
  • Research Article
  • Citations151

Coordinated Expansion Planning of Natural Gas and Electric Power Systems

  • May 01, 2018
  • IEEE Transactions on Power Systems
  • Bining Zhao +2
  • Research Article
  • Citations13

Optimal planning of mobile emergency generators of resilient distribution system

  • Dec 18, 2021
  • Energy Reports
  • Muchen Yuan +3
  • Research Article
  • Citations13

Effective upper and lower bounds for a two-stage reentrant flexible flow shop scheduling problem

  • Feb 06, 2023
  • Computers & Operations Research
  • Shuang Zheng +4
  • Conference Article
  • Citations1

Multi-Stage Product Family Design for Reliability with Remanufacturing

  • Jan 23, 2023
  • Xinyang Liu +3
  • Research Article
  • Citations37

Online scheduling on two uniform machines to minimize the makespan

  • Jan 29, 2009
  • Theoretical Computer Science
  • Ming Liu +3
  • Research Article
  • Citations38

A robust stochastic Casualty Collection Points location problem

  • Jun 14, 2019
  • European Journal of Operational Research
  • Morteza Alizadeh +3
  • Research Article
  • Citations117

Multi-UAV Pre-Positioning and Routing for Power Network Damage Assessment

  • Jul 01, 2018
  • IEEE Transactions on Smart Grid
  • Gino J Lim +4
  • Research Article
  • Citations6

Urban integrated energy system stochastic robust optimization scheduling under multiple uncertainties

  • Apr 25, 2023
  • Energy Reports
  • Dongxu Zhou +1
  • Research Article
  • Citations81

Stochastic optimization models for a bike-sharing problem with transshipment

  • Dec 23, 2018
  • European Journal of Operational Research
  • Francesca Maggioni +3
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.