• Home
  • Search
  • Optimizing e-waste recycling networks under uncertain environment: a fourth-party logistics perspective
  • https://doi.org/10.1117/12.3072630Copy DOI Icon

Optimizing e-waste recycling networks under uncertain environment: a fourth-party logistics perspective

  • Aug 18, 2025
  • Dongsheng Dong +4 more
Show More
  • Abstract
  • Literature Map
  • Similar Papers
Abstract

Efficient E-waste recycling is key for electronic product manufacturing companies to achieve resource optimization and sustainable development. However, market fluctuations and the uncertainty of consumer behavior make the demand for E-waste recycling difficult to predict, presenting challenges for the design and management of recycling networks. This paper investigates the reverse logistics network design problem for E-waste under uncertain recycling demand from the perspective of 4PL innovation. Multiple 3PLs and temporary outsourcing service models are incorporated to address the uncertainty of recycling demand. A two-stage stochastic optimization model is introduced to reduce overall expenses. To improve solving efficiency, a new LHS-SAA algorithm is proposed. The model and method's effectiveness is shown through a real case study of a household appliance recycling company in northern Turkey. The comparative analysis shows that the LHS-SAA algorithm outperforms CPLEX. For the company, the 4PL operational model is more suitable for constructing the corresponding recycling network. Compared to the traditional supply chain network, the 4PL network can reduce overall costs through the collaborative cooperation of 3PLs. In addition, the results of the parameter sensitivity analysis show that the unit penalty cost, unit outsourcing cost, and minimum recycling ratio have a complex interdependent relationship in their effects on the results. The magnitude of the unit penalty cost for uncollected items has a decisive impact on the decision outcomes. When the penalty cost is low, the company can determine the scale of the 4PL network based on the minimum recycling ratio. As the minimum recycling ratio and unit outsourcing cost increase, the company should prepare more funds to build the 4PL recycling network. As the unit penalty cost increases, the scale of the 4PL network is solely dependent on the unit outsourcing cost, regardless of the value of the minimum recycling ratio.

Similar Papers
  • PDF
  • Book Chapter
  • Citations6

A Stochastic Optimization Model for Commodity Rebalancing Under Traffic Congestion in Disaster Response

  • Jan 01, 2019
  • Xuehong Gao
  • Research Article
  • Citations38

A robust stochastic Casualty Collection Points location problem

  • Jun 14, 2019
  • European Journal of Operational Research
  • Morteza Alizadeh +3
  • Conference Article
  • Citations1

Stochastic optimization formulations for reliability unit commitment runs

  • Jul 01, 2014
  • Kai Pan +3
  • Research Article
  • Citations22

Dynamic pooled capacity deployment for urban parcel logistics

  • Mar 03, 2022
  • European Journal of Operational Research
  • Louis Faugère +3
  • Research Article
  • Citations43

A Hybrid MILP and Benders Decomposition Approach to Find the Nucleolus Quota Allocation for a Renewable Energy Portfolio

  • Nov 01, 2015
  • IEEE Transactions on Power Systems
  • Lucas Freire +3
  • Research Article
  • Citations42

Two-stage stochastic optimization frameworks to aid in decision-making under uncertainty for variable resource generators participating in a sequential energy market

  • Apr 14, 2021
  • Applied Energy
  • Razan A.H Al-Lawati +4
  • Research Article
  • Citations151

Coordinated Expansion Planning of Natural Gas and Electric Power Systems

  • May 01, 2018
  • IEEE Transactions on Power Systems
  • Bining Zhao +2
  • Research Article
  • Citations18

Extended open shop scheduling with resource constraints: Appointment scheduling for integrated practice units

  • Apr 25, 2019
  • IISE Transactions
  • Pengfei Zhang +3
  • Research Article
  • Citations13

Optimal planning of mobile emergency generators of resilient distribution system

  • Dec 18, 2021
  • Energy Reports
  • Muchen Yuan +3
  • Conference Article
  • Citations1

Multi-Stage Product Family Design for Reliability with Remanufacturing

  • Jan 23, 2023
  • Xinyang Liu +3
  • Research Article
  • Citations1

Two-stage stochastic programming model and solution strategy for proactive planning and reactive operations of resilient power systems under disruptions

  • Dec 01, 2025
  • International Journal of Electrical Power & Energy Systems
  • Seolhee Cho +1
  • Research Article
  • Citations117

Multi-UAV Pre-Positioning and Routing for Power Network Damage Assessment

  • Jul 01, 2018
  • IEEE Transactions on Smart Grid
  • Gino J Lim +4
  • Research Article
  • Citations6

Urban integrated energy system stochastic robust optimization scheduling under multiple uncertainties

  • Apr 25, 2023
  • Energy Reports
  • Dongxu Zhou +1
  • Research Article
  • Citations81

Stochastic optimization models for a bike-sharing problem with transshipment

  • Dec 23, 2018
  • European Journal of Operational Research
  • Francesca Maggioni +3
  • Research Article
  • Citations2

Study on the Layout and Structure of the Waste Electronic Products Recycling Network

  • May 14, 2012
  • Advanced Materials Research
  • Yun Xiao Zu +3
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.