• Home
  • Search
  • Flexible Flowshop Scheduling Model with Four Stages
  • Cite Icon4
  • https://doi.org/10.17485/ijst/2016/v9i42/101905Copy DOI Icon

Flexible Flowshop Scheduling Model with Four Stages

Show More
  • Abstract
  • Literature Map
  • Citations
  • Similar Papers
Abstract

Objectives: In this paper, we consider the Flexible Flowshop Scheduling (FFS) problem with parallel machines. The main objective of this paper is to obtain a good schedule of jobs to minimize the makespan of FFS problem. Methods/Statistical analysis: In this study, two heuristic algorithms have been developed of FFS to reduce the makespan. First, we constructed the new heuristic algorithm based on Minimum Processing Time Selective Approach (MPTSA) and Longest Processing Times (LPT) approach to find the optimal or near optimal sequence for minimization of makespan of FFS problem with parallel machines. Next, we developed the heuristic algorithm using PALMER approach. In the PALMER approach we sequence the jobs based on Longest Slope Value (LSV) and obtained the value of objective function. Findings: We compared both the heuristic algorithms with the help of numerical illustrations. We solved the same numerical by both the heuristic algorithm and result show that our constructed heuristic algorithm has resulted in a better industrial production makespan. The percentage improvement of our constructive heuristic algorithm is also calculated. Gantt chart is also generated to verify the effectiveness of constructed heuristic algorithm. Application/Improvements: Our constructed heuristic algorithm is more effective to reduced the makespan of FFS problems as compare to classic heuristic algorithm as Palmer approach and provide an important tool for decision makers in production management. Keywords: Flexible Flowshop Scheduling, Gantt Chart, LPT Approach, Makespan, MPTSA Approach, Parallel Machines, Percentage Improvement

Similar Papers
  • Research Article
  • Citations10

A constraint programming approach for resource-constrained flexible assembly flow shop scheduling problem with batch direct delivery

  • Sep 24, 2024
  • Computers and Operations Research
  • Chuangfeng Zeng +2
  • Research Article
  • Citations42

A swarm optimization approach for flexible flow shop scheduling with multiprocessor tasks

  • Dec 04, 2011
  • The International Journal of Advanced Manufacturing Technology
  • Manas Ranjan Singh +1
  • Research Article
  • Citations54

Flexible flow shop scheduling with uniform parallel machines

  • Feb 01, 2006
  • European Journal of Operational Research
  • George J Kyparisis +1
  • Research Article
  • Citations13

Effective upper and lower bounds for a two-stage reentrant flexible flow shop scheduling problem

  • Feb 06, 2023
  • Computers & Operations Research
  • Shuang Zheng +4
  • PDF
  • Research Article
  • Citations3

A bi-objective simulation-optimization approach for solving a no-wait two stages flexible flow shop scheduling problem with rework ability

  • Nov 16, 2017
  • International Business Research
  • Mohammad Rahmanidoust
  • Research Article
  • Citations15

A multi-level action coupling reinforcement learning approach for online two-stage flexible assembly flow shop scheduling

  • Aug 16, 2024
  • Journal of Manufacturing Systems
  • Junhao Qiu +3
  • Research Article
  • Citations30

Scheduling of multi-component products in a two-stage flexible flow shop

  • Mar 25, 2015
  • Applied Soft Computing
  • Fatemeh Nikzad +3
  • Conference Article
  • Citations3

Metaheuristics for two-stage no-wait flexible flow shop scheduling problem

  • Mar 01, 2015
  • Mageed A Ghaleb +2
  • Research Article
  • Citations2

Flexible flow shop scheduling problem with setup times and blocking constraint via genetic algorithm and simulation

  • Oct 01, 2019
  • IOP Conference Series: Materials Science and Engineering
  • Meng Zhang
  • Research Article
  • Citations17

Scheduling rules for two-stage flexible flow shop scheduling problem subject to tail group constraint

  • Aug 30, 2013
  • International Journal of Production Economics
  • Zhan-Tao Li +4
  • Research Article
  • Citations21

Auxiliary resource planning in a flexible flow shop scheduling problem considering stage skipping

  • Nov 08, 2021
  • Computers & Operations Research
  • Ali Hasani +1
  • Research Article
  • Citations47

Constructive heuristic algorithm in branch-and-bound structure applied to transmission network expansion planning

  • Mar 01, 2007
  • IET Generation, Transmission & Distribution
  • R Romero +3
  • PDF
  • Research Article
  • Citations10

Clarifying Cutting and Sewing Processes with Due Windows Using an Effective Ant Colony Optimization

  • Jan 01, 2013
  • Mathematical Problems in Engineering
  • Rong-Hwa Huang +1
  • Research Article
  • Citations58

Effective constructive heuristics for distributed no-wait flexible flow shop scheduling problem

  • Jul 22, 2021
  • Computers & Operations Research
  • Weishi Shao +2
  • Research Article
  • Citations20

Bi-objective optimization of flexible flow shop scheduling problem with multi-skilled human resources

  • Mar 14, 2024
  • Engineering Applications of Artificial Intelligence
  • Masoud Fekri +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.