Abstract

Construction and development of the Grasberg Block Cave (GBC) mine continues to progress, with undercutting commencing in late 2018.As an experienced operator of block cave mines, PT Freeport Indonesia (PTFI) works to improve the planning and execution of undercutting.The GBC mine, with its large size and complex geotechnical conditions, requires increased focus on initiating and sustaining caving.For the past two years, PTFI has worked on developing a software tool for detailed undercut planning.The tool utilises cave management rules, the geologic block model, and ring shapes to produce detailed tonnage and grade schedules.Additionally, further analytical processing of the tool's output data allows examination of the feasibility and required resources to implement the undercutting plan.As a constraint-based scheduling application, the tool provides a high degree of flexibility in adapting quickly to changing assumptions.Factors affecting GBC undercutting include high tonnage rates, mine development resources, and variable rock mass conditions.Of primary concern, with production targets between 130,000 and 160,000 tpd, drawbells must open at a sufficient pace to achieve acceptable caving production ramp-up and then maintain throughput targets.Detailed undercut scheduling alleviates those concerns by optimising production block start dates, caving rules, and ring designs, to drive cave production with an achievable drawbelling rate.These detailed schedules also enable vetting of mine development plans, construction plans, and resource requirements.The GBC geotechnical environment requires undercutting strategies to adapt accordingly.Poor rock mass conditions, large panel boundaries, and high-stress conditions all affect undercut start points, caving directions, and other design decisions.The ability to produce realistic, detailed schedules enables further study of the impacts with 3D numerical modelling.Results from numerical modelling have helped refine not only the caving strategy, but also the overall mine design.The importance of the undercutting plan for successful caving of the large footprint, high tonnage rate GBC mine remains a priority.In conjunction with the geotechnical engineers and operations personnel, the mine planning team utilises the newly developed undercut planning tool to adapt and improve undercutting plans as more informed data becomes available.The geotechnical and operational challenges to mining the GBC necessitate the methods and approach to planning discussed in this paper.

Similar Papers
  • Conference Article
  • Citations5

Development of and production update for the Grasberg Block Cave mine – PT Freeport Indonesia

  • Jan 01, 2020
  • Charles Brannon +3
  • Conference Article
  • Citations3

Optimising for success at the Grasberg Block Cave

  • Jan 01, 2018
  • Ryan Campbell +3
  • Research Article
  • Citations1

Implementasi Investasi Sosial Sektor Industri Pertambangan

  • Oct 04, 2022
  • COMSERVA Indonesian Jurnal of Community Services and Development
  • Masjon Parhusip +2
  • Research Article

Mengelola Air Asam Dan Air Siap Minum PT Freeport Indonesia Untuk Masyarakat

  • Apr 02, 2025
  • ULIL ALBAB : Jurnal Ilmiah Multidisiplin
  • Virgine Merrylen Kafiar
  • Research Article

Ground movement prediction due to block caving mining geometry using GIS

  • Sep 02, 2015
  • Journal of Applied Geology
  • Agung Setianto +1
  • Research Article
  • Citations1

PROGRAM CORPORATE SOCIAL RESPONSIBILITY (CSR) BIDANG KESEHATAN PT FREEPORT INDONESIA DI ERA PANDEMI COVID-19

  • Dec 31, 2022
  • JURNAL PENELITIAN DAN KARYA ILMIAH LEMBAGA PENELITIAN UNIVERSITAS TRISAKTI
  • Gita Handayani Tarigan +2
  • Research Article

Improving Contractors’ Performance to Increase Electrical Locomotives (Elloco) Availability in Grasberg Blocking Cave (GBC) Mine

  • Sep 23, 2024
  • European Journal of Business and Management Research
  • Dicky Cahya Gusprita +1
  • Research Article
  • Citations1

Physical modeling of high extraction columns in block cave mining

  • Aug 01, 2025
  • International Journal of Rock Mechanics and Mining Sciences
  • Nicolás Carreño +3
  • Research Article
  • Citations5

Microseismic monitoring of hydraulic fractures in block cave mines

  • Sep 01, 2010
  • Mining Technology
  • P J Joubert
  • Research Article

Active Listening untuk Meningkatkan Kapasitas Kepemimpinan Pengurus Yayasan Pemberdayaan Masyarakat Amungme dan Kamoro (YPMAK) Timika

  • Feb 12, 2025
  • E-Coops-Day
  • Farida Farida
  • Research Article

Human Rights in Indonesia

  • May 01, 2009
  • Cornell Internation Affairs Review
  • Antonia Sohns
  • PDF
  • Research Article
  • Citations1

Identification and management of Toxic & Hazardous Wastes (THW) based on the Indonesian Government Regulation Number 22 of 2021

  • May 01, 2023
  • IOP Conference Series: Earth and Environmental Science
  • Arif Susanto +5
  • Research Article
  • Citations26

Freeport and the Suharto Regime, 1965-1998

  • Jan 01, 2002
  • The Contemporary Pacific
  • Denise Leith
  • Conference Article
  • Citations1

Implementation of major mining strategy changes at the Deep Mill Level Zone (DMLZ) mine, PT Freeport Indonesia

  • Jan 01, 2024
  • Samuel Lolon +4
  • Research Article
  • Citations16

Presence of Arbuscular Mycorrhizal Fungi on Fern from Tailing Deposition Area of Gold Mine in Timika, Indonesia

  • Jan 25, 2016
  • International journal of environmental bioremediation & biodegradation
  • Suharno Suharno +3
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.