• Cite Icon4
  • https://doi.org/10.4043/4910-msCopy DOI Icon

Hutton TLP Marine Operations

  • May 6, 1985
  • H.j Hart +2 more
Show More
  • Abstract
  • Literature Map
  • Citations
  • Similar Papers
Abstract

ABSTRACT This paper reviews the Planning and execution of the Marine Operations for the Hutton TLP including:Well Template InstallationSite PreparationFoundation InstallationTemporary AnchoragesMatingMajor TowsTLP Installation Planning the work to meet project objectives resulted in the utilisation of a number of new techniques and advanced equipment applications. These included underwater pile hammers and special acoustic equipment to provide positioning information during underwater operations. However, the detailed planning which preceded each operation significantly enhanced the effectiveness of the equipment employed. Further, it contributed materially to the attainment of First Oil only twenty two days after TLP installation. INTRODUCTION The 'towing, mating and installation of the Hutton Tension Leg Platform (TLP) involved extensive marine operations ranging from conventional sea tows to the first-ever installation of a TLP. To ensure the success of some of the more complex marine operations, special methods and unique equipment applications were required. A number of these are addressed in papers presented at other OTC sessions. This paper provides an overview of all of the principal marine operations associated with the TLP, highlighting those which required something more than a conventional approach. Figure 1 shows the relative locations of the operations covered, including:Hutton Field, Offshore OperationsInshore OperationsInverness Firth AnchorageMoray Firth AnchorageHull T?OWDeck TowMating The paper stresses the importance of effective management in the success of marine operations including the specific areas of advanced planning, contingency planning, co-ordination with regulatory agencies and the supervision of contractors. The overall marine operations schedule is included as Figure 2. Marine Operations on the project critical path were the Hull Tow, Mating, TLP Tow and Installation. WELL TEMPLATE INSTALLATION A 32 slot template for pre-drilling wells (Figure 3) was the first structure to be placed at Hutton. The template, measuring 33.2m long by 11.6m wide by 6.6m high and weighing 400T in air, was installed in two phases: Phase 1 In April 7981 the template was transported to the field and within 24 hours of arrival at Hutton was placed on the sea bed. The template?s final position was within 5.Om of the geographic target. This accuracy was achieved by using a newly developed subsurface acoustic positioning system integrated with surface electronic navigation equipment. The subsurface equipment was developed from an existing transponder which operated in a short base line mode and transmitted data on position, orientation and levelness. This system became an integral part of the systems developed for foundation and TLP tether leg installation. Phase 2 A semi-submersible drill rig was used to complete the template installation.

Similar Papers
  • Conference Article

Subsurface Safety Systems for TLP Completions

  • Oct 22, 1984
  • M B Calhoun +2
  • Conference Article
  • Citations6

Design, Fabrication, And Installation Of The Auger Tlp Foundation System

  • May 02, 1994
  • W.R Ulbricht +4
  • Conference Article

Fabrication of Hutton TLP

  • May 06, 1985
  • M.M Salama +2
  • Conference Article

Titanium Stress Joint for a TLP Tendon System

  • May 04, 1992
  • E.D Valenzuela
  • PDF
  • Peer Review Report

Reply on RC2

  • Nov 04, 2021
  • Rahul Chitteth Ramachandran
  • PDF
  • Peer Review Report

Comment on wes-2021-120

  • Oct 30, 2021
  • Zhiyu Jiang
  • Conference Article
  • Citations2

Unconventional Approach Simplifies Steel Catenary Riser Decommissioning

  • Aug 09, 2021
  • Ansel Orr +6
  • Research Article
  • Citations7

Magnolia Deepwater Development- Striving for Best-in-Class Drilling Performance

  • Dec 20, 2006
  • SPE Drilling & Completion
  • W Randall Reinhardt +3
  • Research Article

Drilling and Producing Operations Utilizing a Tension-Leg Platform

  • Oct 01, 1986
  • SPE Drilling Engineering
  • R E Irelan +2
  • Conference Article
  • Citations4

Hydrodynamic Tests on Marine Risers

  • May 03, 1982
  • George G Hartnup +4
  • Conference Article
  • Citations1

VIV Suppression Installation on Existing Horizontal Pipeline Spans

  • May 03, 2004
  • Stephen P Armstrong
  • Conference Article
  • Citations5

Two Recent Conversions Of Semisubmersible Drilling Units To Floating Production Facilities

  • May 02, 1994
  • H.E Mcbee +2
  • Conference Article
  • Citations2

Red Hawk Project Polyester Soil Ingress Testing

  • May 02, 2005
  • J Tule +3
  • Single Report

INVESTIGATIONS OF AMERICAN TROPICAL AND SUBTROPICAL SEAS SPONSORED BY THE OFFICE OF NAVAL RESEARCH

  • Jul 01, 1963
  • F G Walton Smith
  • Book Chapter
  • Citations1

Crowd Planning and Preparation

  • Dec 01, 2019
  • William O’Toole +4
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.