• Home
  • Search
  • Long Lead-Time Streamflow Forecasting Using Oceanic-Atmospheric Oscillation Indices
  • Cite Icon7
  • https://doi.org/10.4236/jwarp.2014.66062Copy DOI Icon

Long Lead-Time Streamflow Forecasting Using Oceanic-Atmospheric Oscillation Indices

Show More
  • Abstract
  • Highlights & Summary
  • PDF
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Climatic variability influences the hydrological cycle that subsequently affects the discharge in the stream. The variability in the climate can be represented by the ocean-atmospheric oscillations which provide the forecast opportunity for the streamflow. Prediction of future water availability accurately and reliably is a key step for successful water resource management in the arid regions. Four popular ocean-atmospheric indices were used in this study for annual streamflow volume prediction. They were Pacific Decadal Oscillation (PDO), El-Nino Southern Oscillation (ENSO), Atlantic Multidecadal Oscillation (AMO), and North Atlantic Oscillation (NAO). Multivariate Relevance Vector Machine (MVRVM), a data driven model based on Bayesian learning approach was used as a prediction model. The model was applied to four unimpaired stream gages in Utah that spatially covers the state from north to south. Different models were developed based on the combinations of oscillation indices in the input. A total of 60 years (1950-2009) of data were used for the analysis. The model was trained on 50 years of data (1950-1999) and tested on 10 years of data (2000-2009). The best combination of oscillation indices and the lead-time were identified for each gage which was used to develop the prediction model. The predicted flow had reasonable agreement with the actual annual flow volume. The sensitivity analysis shows that the PDO and ENSO have relatively stronger effect compared to other oscillation indices in Utah. The prediction results from the MVRVM were compared with the Support Vector Machine (SVM) and the Artificial Neural Network (ANN) where MVRVM performed relatively better.

Loading PDF

Similar Papers
  • Research Article
  • Citations37

Pacific and Atlantic Ocean influence on the spatiotemporal variability of heavy precipitation in the western United States

  • Jul 16, 2013
  • Global and Planetary Change
  • Jiang Peng +2
  • Research Article
  • Citations162

Groundwater level response in U.S. principal aquifers to ENSO, NAO, PDO, and AMO

  • Oct 05, 2014
  • Journal of Hydrology
  • Amber Jean M Kuss +1
  • PDF
  • Research Article
  • Citations5

Large-scale climate variability footprint in water levels of alluvial aquifers across Iran

  • Jan 08, 2022
  • Theoretical and Applied Climatology
  • Abolfazl Rezaei
  • Research Article
  • Citations148

Using oceanic‐atmospheric oscillations for long lead time streamflow forecasting

  • Mar 01, 2009
  • Water Resources Research
  • Ajay Kalra +1
  • PDF
  • Peer Review Report

Reply on RC2

  • Jan 13, 2023
  • Abolfazl Rezaei
  • Research Article
  • Citations284

Influences of ENSO, NAO, IOD and PDO on seasonal precipitation regimes in the Yangtze River basin, China

  • Dec 02, 2014
  • International Journal of Climatology
  • Mingzhong Xiao +2
  • PDF
  • Research Article
  • Citations11

Precipitation Variations in the Flood Seasons of 1910–2019 in Hunan and Its Association With the PDO, AMO, and ENSO

  • Apr 06, 2021
  • Frontiers in Earth Science
  • Yuxing Zeng +3
  • Research Article
  • Citations11

Effect of ENSO modulation by decadal and multi-decadal climatic oscillations on contiguous United States streamflows

  • Jul 28, 2021
  • Journal of Hydrology: Regional Studies
  • Sarmistha Singh +3
  • Research Article
  • Citations88

Estimating annual precipitation for the Colorado River Basin using oceanic‐atmospheric oscillations

  • Jun 01, 2012
  • Water Resources Research
  • Ajay Kalra +1
  • Research Article
  • Citations1

Interannual to Decadal Rainfall Variability over Greater Horn of Africa: Non-Stationary Teleconnections, Physical Mechanisms, and Predictability

  • Jan 01, 2019
  • Repository KITopen (Karlsruhe Institute of Technology)
  • Titike Bahaga
  • Research Article
  • Citations33

Long-range precipitation forecasts using paleoclimate reconstructions in the western United States

  • Apr 01, 2016
  • Journal of Mountain Science
  • Christopher Allen Carrier +2
  • PDF
  • Research Article
  • Citations31

Origin of Indian Ocean multidecadal climate variability: role of the North Atlantic Oscillation

  • Feb 01, 2021
  • Climate Dynamics
  • Tiejun Xie +4
  • Research Article
  • Citations7

Variability of the ocean heat content during the last millennium – an assessment with the ECHO-g Model

  • Mar 04, 2013
  • Climate of the Past
  • P Ortega +4
  • Conference Article
  • Citations1

Interdecadal and Interannual Oceanic / Atmospheric Variability and United States Seasonal Streamflow

  • Jul 01, 2005
  • Glenn A Tootle +1
  • Research Article
  • Citations59

Max-stable based evaluation of impacts of climate indices on extreme precipitation processes across the Poyang Lake basin, China

  • Oct 02, 2014
  • Global and Planetary Change
  • Qiang Zhang +3
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.