• Home
  • Search
  • Using oceanic‐atmospheric oscillations for long lead time streamflow forecasting
  • Open Access IconOpen Access
  • Cite Icon148
  • https://doi.org/10.1029/2008wr006855Copy DOI Icon

Using oceanic‐atmospheric oscillations for long lead time streamflow forecasting

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

We present a data‐driven model, Support Vector Machine (SVM), for long lead time streamflow forecasting using oceanic‐atmospheric oscillations. The SVM is based on statistical learning theory that uses a hypothesis space of linear functions based on Kernel approach and has been used to predict a quantity forward in time on the basis of training from past data. The strength of SVM lies in minimizing the empirical classification error and maximizing the geometric margin by solving inverse problem. The SVM model is applied to three gages, i.e., Cisco, Green River, and Lees Ferry in the Upper Colorado River Basin in the western United States. Annual oceanic‐atmospheric indices, comprising Pacific Decadal Oscillation (PDO), North Atlantic Oscillation (NAO), Atlantic Multidecadal Oscillation (AMO), and El Nino–Southern Oscillations (ENSO) for a period of 1906–2001 are used to generate annual streamflow volumes with 3 years lead time. The SVM model is trained with 86 years of data (1906–1991) and tested with 10 years of data (1992–2001). On the basis of correlation coefficient, root means square error, and Nash Sutcliffe Efficiency Coefficient the model shows satisfactory results, and the predictions are in good agreement with measured streamflow volumes. Sensitivity analysis, performed to evaluate the effect of individual and coupled oscillations, reveals a strong signal for ENSO and NAO indices as compared to PDO and AMO indices for the long lead time streamflow forecast. Streamflow predictions from the SVM model are found to be better when compared with the predictions obtained from feedforward back propagation artificial neural network model and linear regression.

Similar Papers
  • Research Article
  • Citations88

Estimating annual precipitation for the Colorado River Basin using oceanic‐atmospheric oscillations

  • Jun 01, 2012
  • Water Resources Research
  • Ajay Kalra +1
  • Research Article
  • Citations284

Influences of ENSO, NAO, IOD and PDO on seasonal precipitation regimes in the Yangtze River basin, China

  • Dec 02, 2014
  • International Journal of Climatology
  • Mingzhong Xiao +2
  • Research Article
  • Citations162

Groundwater level response in U.S. principal aquifers to ENSO, NAO, PDO, and AMO

  • Oct 05, 2014
  • Journal of Hydrology
  • Amber Jean M Kuss +1
  • PDF
  • Research Article
  • Citations5

Large-scale climate variability footprint in water levels of alluvial aquifers across Iran

  • Jan 08, 2022
  • Theoretical and Applied Climatology
  • Abolfazl Rezaei
  • PDF
  • Research Article
  • Citations7

Long Lead-Time Streamflow Forecasting Using Oceanic-Atmospheric Oscillation Indices

  • Jan 01, 2014
  • Journal of Water Resource and Protection
  • Niroj Kumar Shrestha
  • PDF
  • Peer Review Report

Reply on RC2

  • Jan 13, 2023
  • Abolfazl Rezaei
  • Preprint Article

Climate change and North Atlantic Oscillation (NAO) index: Can entropy reveal a non-natural variability trend in NAO index?

  • Mar 28, 2022
  • Antonia Chatzirodou +1
  • PDF
  • Research Article
  • Citations11

Precipitation Variations in the Flood Seasons of 1910–2019 in Hunan and Its Association With the PDO, AMO, and ENSO

  • Apr 06, 2021
  • Frontiers in Earth Science
  • Yuxing Zeng +3
  • Research Article
  • Citations37

Pacific and Atlantic Ocean influence on the spatiotemporal variability of heavy precipitation in the western United States

  • Jul 16, 2013
  • Global and Planetary Change
  • Jiang Peng +2
  • Research Article
  • Citations1

Interannual to Decadal Rainfall Variability over Greater Horn of Africa: Non-Stationary Teleconnections, Physical Mechanisms, and Predictability

  • Jan 01, 2019
  • Repository KITopen (Karlsruhe Institute of Technology)
  • Titike Bahaga
  • Research Article
  • Citations1

Near infrared spectroscopy for the characterisation of bovine teeth in terms of sex, diet, tooth type and place of origin

  • Nov 22, 2024
  • Journal of Near Infrared Spectroscopy
  • Ne Pretorius +3
  • Research Article
  • Citations11

Effect of ENSO modulation by decadal and multi-decadal climatic oscillations on contiguous United States streamflows

  • Jul 28, 2021
  • Journal of Hydrology: Regional Studies
  • Sarmistha Singh +3
  • Research Article
  • Citations22

Alternating Effects of Climate Drivers on Altamaha River Discharge to Coastal Georgia, USA

  • Oct 03, 2013
  • Estuaries and Coasts
  • Joan E Sheldon +1
  • Research Article
  • Citations5

Comparative study of different machine learning models in landslide susceptibility assessment: A case study of Conghua District, Guangzhou, China

  • Jan 01, 2024
  • China Geology
  • Ao Zhang +10
  • Research Article
  • Citations42

Feature Selection Using Parallel Genetic Algorithm for the Prediction of Geometric Mean Diameter of Soil Aggregates by Machine Learning Methods

  • May 01, 2014
  • Arid Land Research and Management
  • A A Besalatpour +4
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.