• Home
  • Search
  • Multimodal processes prototyping subject to grid-like network and fuzzy operation time constraints
  • Cite Icon16
  • https://doi.org/10.1007/s10479-017-2468-5Copy DOI Icon

Multimodal processes prototyping subject to grid-like network and fuzzy operation time constraints

Show More
  • Abstract
  • Highlights & Summary
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

This paper describes a Grid-like Material Transportation Network (GMTN) in which several heterogeneous means of transportation (Automated Guided Vehicles (AGVs), hoists, lifts, etc.) interact with each other via common shared workstations to provide a variety of demand-responsive material handling operations. Different material handling transport modes provide movement of workpieces between workstations along their manufacturing routes in the GMTN and they can be seen as processes realized with synergic utilization of various local periodically acting unimodal processes. The main contribution of this research is the solution of a constraint satisfaction problem addressing AGVs fleet match-up scheduling subject to GMTN and fuzzy operation time constraints. In the presented case both production rate (production takt) and operations execution time are described by imprecise (fuzzy) data. In other words, the research’s objective concerns assessing grid-like networks of periodically acting local transportation modes from the perspective of possible mass-customized oriented requirements imposed on scheduling of multimodal flows of jobs assigned to certain technological routes passing through common shared workstations.

Similar Papers
  • Research Article
  • Citations12

A case study on AGV’s alternatives selection problem

  • Jul 26, 2018
  • International Journal of Information Technology
  • Divya Agarwal +1
  • Conference Article

Automated Guided Vehicle for Inventory Management

  • Nov 23, 2024
  • Lavanya A +2
  • Research Article
  • Citations36

Controlling the navigation of automatic guided vehicle (AGV) using integrated fuzzy logic controller with programmable logic controller (IFLPLC)—stage 1

  • Apr 03, 2009
  • The International Journal of Advanced Manufacturing Technology
  • Mehdi Yahyaei +2
  • Research Article
  • Citations44

Automated guided vehicles fleet match-up scheduling with production flow constraints

  • Mar 01, 2014
  • Engineering Applications of Artificial Intelligence
  • Grzegorz Bocewicz +2
  • Research Article
  • Citations26

Mathematical model for deadlock resolution in multiple AGV scheduling and routing network: a case study

  • Jun 23, 2015
  • Industrial Robot: An International Journal
  • Hamed Fazlollahtabar +2
  • Research Article

Automated Guided Vehicles with Robotic Arm: Enhancing Efficiency and Flexibility in Material Handling

  • Jun 05, 2023
  • International Journal of Science and Research (IJSR)
  • Akshay Ingole
  • Research Article
  • Citations18

Design and analysis of optimal material distribution policies in flexible manufacturing systems using a single AGV

  • Jan 01, 2002
  • International Journal of Production Research
  • Bharadwaj Veeravalli +2
  • Research Article
  • Citations48

Novel methodology for optimising the design, operation and maintenance of a multi-AGV system

  • Jun 03, 2018
  • Reliability Engineering & System Safety
  • Rundong Yan +2
  • Book Chapter
  • Citations28

Industry 4.0: Sustainable material handling processes in industrial environments

  • Jan 01, 2017
  • Computer Aided Chemical Engineering
  • Dimitrios Bechtsis +3
  • Research Article
  • Citations5

Design of experiment and simulation approach for analyzing automated guided vehicle performance indicators in a production line

  • Dec 04, 2023
  • SIMULATION
  • Salazar Javier Eduardo +1
  • Research Article
  • Citations107

CPS-Based Smart Control Model for Shopfloor Material Handling

  • Apr 01, 2018
  • IEEE Transactions on Industrial Informatics
  • Yingfeng Zhang +2
  • Research Article
  • Citations2

Integrated scheduling of part, tool and automated guided vehicles in a flexible manufacturing system using modified genetic algorithm

  • Jan 01, 2019
  • International Journal of Industrial and Systems Engineering
  • Dheeraj Joshi +2
  • PDF
  • Research Article
  • Citations8

DEVELOPMENT OF AN AUTOMATED GUIDED VEHICLE CONTROLLER USING A SYSTEMS ENGINEERING APPROACH

  • Aug 01, 2016
  • SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING
  • Tremaine Ferreira +1
  • Research Article
  • Citations4

Multi-decision points model to solve coupled-task scheduling problem with heterogeneous multi-AGV in manufacturing systems

  • Jan 01, 2023
  • International Journal of Industrial Engineering Computations
  • Xingkai Wang +2
  • Research Article
  • Citations7

Designing flexible loop-based material handling AGV paths with cell-adjacency priorities: an efficient cutting-plane algorithm

  • Oct 04, 2018
  • 4OR
  • Amir Ahmadi-Javid +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.