Optimal Due-Window Assignment Based on Common Flow Allowance under Linear Deteriorating and Resource-Dependent Processing Times

Show More
  • Abstract
  • Literature Map
  • References
  • Similar Papers
Abstract

This paper studies a due-window assignment problem on a single machine. The job-dependent due-windows are obtained by the common flow allowance criterion. We assume that the processing time of a job is a linear function of its starting time and decreasing function of the resource amount assigned to it. The objective is to find the optimal size and location of the due-windows, the sequence of jobs and resource allocation scheme to minimize a cost function based on the window size and location, the earliness and tardiness of jobs and resource cost. We propose an algorithm to solve the problem.

Similar Papers
  • Research Article

Single Machine Multiple Common due Dates Assignment Based on Common Flow Allowance and Resource-Dependent Processing Times

  • Sep 01, 2014
  • Applied Mechanics and Materials
  • Cheng Xin Luo +1
  • Research Article
  • Citations36

Convex resource allocation scheduling in the no-wait flowshop with common flow allowance and learning effect

  • Aug 21, 2018
  • International Journal of Production Research
  • Xinyu Sun +3
  • Research Article
  • Citations33

Minimizing Weighted Number of Early and Tardy Jobs with a Common Due Window Involving Location Penalty

  • Nov 01, 2001
  • Annals of Operations Research
  • W.K Yeung +2
  • Research Article
  • Citations44

A multi-objective flow shop scheduling with resource-dependent processing times: trade-off between makespan and cost of resources

  • Jan 04, 2011
  • International Journal of Production Research
  • Hadi Mokhtari +2
  • Research Article
  • Citations3

Single machine SLK/DIF due window assignment problem with general job-dependent positional effect and outsourcing operations

  • Mar 01, 2023
  • RAIRO - Operations Research
  • Chunlai Liu
  • Research Article
  • Citations1

Stochastic group scheduling problems on single and multiple machines

  • Jan 01, 2004
  • Journal of Statistics and Management Systems
  • Jason Chao-Hsien Pan +1
  • Research Article
  • Citations12

Minimizing total completion time with linear deterioration: A new lower bound

  • Dec 08, 2021
  • Computers & Industrial Engineering
  • Matan Atsmony +1
  • Research Article
  • Citations129

Common due window size and location determination in a single machine scheduling problem

  • Sep 01, 1998
  • Journal of the Operational Research Society
  • S D Liman +2
  • Conference Article
  • Citations3

Early-tardy scheduling under fuzzy due dates using a genetic algorithm

  • Jul 06, 1999
  • S.S Lam +1
  • Research Article
  • Citations20

Study on Single-Machine Common/Slack Due-Window Assignment Scheduling with Delivery Times, Variable Processing Times and Outsourcing

  • Sep 15, 2024
  • Mathematics
  • Bing Bai +3
  • Research Article
  • Citations21

Hybrid flow shop with multiprocessor task scheduling based on earliness and tardiness penalties

  • Sep 13, 2018
  • Journal of Enterprise Information Management
  • Orhan Engin +1
  • Research Article
  • Citations64

Machine scheduling with resource dependent processing times

  • Dec 12, 2006
  • Mathematical Programming
  • Alexander Grigoriev +2
  • Research Article
  • Citations2

Study on Controllable Processing Time and Minmax Group Scheduling with Common Due-Window Assignment

  • Feb 14, 2026
  • Symmetry
  • Li-Han Zhang +2
  • Research Article
  • Citations42

An Exact Method to Minimize the Number of Tardy Jobs in Single Machine Scheduling

  • Nov 01, 2004
  • Journal of Scheduling
  • Stéphane Dauzère-Pérès +1
  • Research Article
  • Citations21

Group scheduling with group-dependent multiple due windows assignment

  • Jul 01, 2015
  • International Journal of Production Research
  • Min Ji +5
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.