• Home
  • Search
  • Resource-loaded piping spool fabrication scheduling: material-supply-driven optimization
  • Cite Icon18
  • https://doi.org/10.1186/s40327-017-0044-3Copy DOI Icon

Resource-loaded piping spool fabrication scheduling: material-supply-driven optimization

Show More
  • Abstract
  • Highlights & Summary
  • PDF
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

BackgroundAs offsite prefabrication and modular construction continue to gain momentum into the future, material supply chain becomes increasingly complex for modern construction projects. Pre-engineered material supply presents itself as a driver for planning crew installation operations on site that involve skilled labor and heavy equipment.MethodsThis paper proposes a framework for implementing the material-supply-driven project planning and control optimization approach to deal with material delays that take place at the piping spool fabrication shop. Design drawings, contract deadlines, resources availability and material supply patterns are extracted from a real oil and gas expansion project to validate the proposed implementation methodology.ResultsAn interactive Gantt chart with information on activity start time, duration, and allocated resources is generated to visualize the optimization outcome. In connection with the resource-constrained schedule, material supply-demand patterns over project duration are also visualized.ConclusionsThese two forms of visualizations provide insightful decision-making support in coping with material delay while fulfilling project objectives. Ultimately, material-supply driven crew job schedules in correspondence with particular objectives and implementation strategies can be generated, ready to guide project execution.

Loading PDF

Similar Papers
  • Conference Article

The Whole Process Information Management System and Application of the Supply Chain for Railway Engineering Construction Materials

  • Nov 14, 2025
  • Liu Bao +5
  • Book Chapter
  • Citations4

Critical Chain/Buffer Management

  • Jan 01, 2012
  • Mario Vanhoucke
  • Research Article
  • Citations72

Rethinking Chinese supply resilience of critical metals in lithium-ion batteries

  • Feb 22, 2020
  • Journal of Cleaner Production
  • Wenyi Yan +6
  • Research Article
  • Citations119

Optimization modeling of multi-skilled resources in prefabrication: Theorizing cost analysis of process integration in off-site construction

  • Aug 06, 2018
  • Automation in Construction
  • Mehrdad Arashpour +4
  • Research Article
  • Citations29

Calculation of safe float use in risk-analysis-oriented network scheduling

  • Jun 01, 1995
  • International Journal of Project Management
  • Daji Gong +1
  • Conference Article

A Comparative Study of Using Risk Adjusted Discount Rate and Historical-Based Monte Carlo Simulation to Evaluate Risk/Uncertainty in Oil and Gas Investment

  • Sep 01, 2021
  • D I Lidyanto
  • Research Article

자원의 불확실성을 고려한 프로젝트 일정 문제에 관한 연구: 예약이 필요한 임대자원을 중심으로

  • Feb 28, 2025
  • The Academic Society of Global Business Administration
  • Doo Hee Lee +2
  • Research Article
  • Citations8

Scheduling new product development projects using simulation-based dependency structure matrix

  • Jan 01, 2014
  • International Journal of Logistics Systems and Management
  • Mohsen Mohammadi +2
  • Research Article

Influence of Project Characteristics on Construction Worker Performance: Evidence from High-rise Projects in Nairobi, Kenya

  • Feb 17, 2026
  • Journal of Engineering Research and Reports
  • Dennis Mumo Ndolo
  • Research Article

Pendekatan Probabilistik Berbasis PERT dengan Visualisasi TFN pada Penjadwalan Proyek Konstruksi

  • Feb 03, 2026
  • Jurnal Talenta Sipil
  • Ismatul Khasanah +3
  • Research Article
  • Citations166

Optimal Planning and Scheduling for Repetitive Construction Projects

  • Jan 01, 2006
  • Journal of Management in Engineering
  • Khalied Hyari +1
  • PDF
  • Research Article
  • Citations3

A life cycle model of major innovations in operations management

  • May 10, 2019
  • International Journal of Quality Innovation
  • Attila Chikán +1
  • Book Chapter

Privacy-Preserving Digital Product Passports for the Garment and Clothing Industry

  • Feb 20, 2026
  • Ranu Burad +2
  • Report Component
  • Citations2

Africa's Lobito Corridor benefits may be exaggerated

  • Sep 16, 2024
  • Emerald expert briefings
  • Oxford Analytica
  • Conference Article
  • Citations59

How product characteristics determine end-of-life strategies

  • May 04, 1998
  • C.M Rose +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.