• Home
  • Search
  • Calculation of safe float use in risk-analysis-oriented network scheduling
  • Cite Icon29
  • https://doi.org/10.1016/0263-7863(94)00004-vCopy DOI Icon

Calculation of safe float use in risk-analysis-oriented network scheduling

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Calculation of safe float use in risk-analysis-oriented network scheduling

Similar Papers
  • Research Article
  • Citations12

A Quantitative Analysis of the Performance of Transportation Projects in Developing Countries

  • May 01, 2010
  • Transport Reviews
  • Eduardo A Gamez +1
  • Research Article
  • Citations9

Time-cost optimization using harmony search algorithm in construction projects

  • Jan 01, 2019
  • Revista de la construcción
  • Mohammad Lemar Zalmai +2
  • Research Article
  • Citations1

Predicting project duration using a coupled artificial neural network and Taguchi method approach

  • Jul 11, 2024
  • STUDIES IN ENGINEERING AND EXACT SCIENCES
  • Larbi Bendada +3
  • Research Article

Pendekatan Probabilistik Berbasis PERT dengan Visualisasi TFN pada Penjadwalan Proyek Konstruksi

  • Feb 03, 2026
  • Jurnal Talenta Sipil
  • Ismatul Khasanah +3
  • Research Article
  • Citations77

Ship maintenance scheduling by genetic algorithm and constraint-based reasoning

  • Feb 01, 1999
  • European Journal of Operational Research
  • Safaai Deris +4
  • Research Article
  • Citations10

Critical Duration Index: Anticipating Project Delays from Deterministic Schedule Information

  • Nov 01, 2022
  • Journal of Construction Engineering and Management
  • Maria-Carmen González-Cruz +3
  • Research Article
  • Citations75

Project Scheduling using Dependency Structure Matrix

  • Dec 25, 2004
  • International Journal of Project Management
  • J Uma Maheswari +1
  • Research Article
  • Citations8

Scheduling new product development projects using simulation-based dependency structure matrix

  • Jan 01, 2014
  • International Journal of Logistics Systems and Management
  • Mohsen Mohammadi +2
  • Research Article
  • Citations58

Data-Driven Machine Learning Approach to Integrate Field Submittals in Project Scheduling

  • Nov 09, 2020
  • Journal of Management in Engineering
  • Mohamad Awada +2
  • Conference Article
  • Citations1

Integrated Earned Value Method for IT Project Cost and Duration Estimation

  • May 20, 2023
  • Der-Jiun Pang
  • Book Chapter
  • Citations3

A Daily Work Report Based Approach for Schedule Risk Analysis

  • Oct 11, 2019
  • Chau Le +1
  • Book Chapter

Simulation Model for Project Duration Estimation with Parameters Extraction Method from Accumulated Data

  • Oct 07, 2019
  • Kazuo Hiekata +2
  • PDF
  • Research Article
  • Citations18

Resource-loaded piping spool fabrication scheduling: material-supply-driven optimization

  • Apr 11, 2017
  • Visualization in Engineering
  • Jing Liu +2
  • Book Chapter

CHAPTER V - CRITICAL PATH METHODS

  • Jan 01, 1978
  • Computer Methods in Operations Research
  • Arne Thesen
  • Research Article
  • Citations11

Later start time for teens improves grades, mood, and safety

  • Nov 28, 2016
  • Phi Delta Kappan
  • Kyla L Wahlstrom
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.