• Home
  • Search
  • Satellite- and Epoch Differenced Precise Point Positioning Based on a Regional Augmentation Network
  • Cite Icon9
  • https://doi.org/10.3390/s120607518Copy DOI Icon

Satellite- and Epoch Differenced Precise Point Positioning Based on a Regional Augmentation Network

Show More
  • Abstract
  • Highlights & Summary
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Precise Point Positioning (PPP) has been demonstrated as a simple and effective approach for user positioning. The key issue in PPP is how to shorten convergence time and improve positioning efficiency. Recent researches mainly focus on the ambiguity resolution by correcting residual phase errors at a single station. The success of this approach (referred to hereafter as NORM-PPP) is subject to how rapidly one can fix wide-lane and narrow-lane ambiguities to achieve the first ambiguity-fixed solution. The convergence time of NORM-PPP is receiver type dependent, and normally takes 15–20 min. Different from the general algorithm and theory by which the float ambiguities are estimated and the integer ambiguities are fixed, we concentrate on a differential PPP approach: the satellite- and epoch differenced (SDED) approach. In general, the SDED approach eliminates receiver clocks and ambiguity parameters and thus avoids the complicated residual phase modeling procedure. As a further development of the SDED approach, we use a regional augmentation network to derive tropospheric delay and remaining un-modeled errors at user sites. By adding these corrections and applying the Robust estimation, the weak mathematic properties due to the ED operation is much improved. Implementing this new approach, we need only two epochs of data to achieve PPP positioning converging to centimeter-positioning accuracy. Using seven days of GPS data at six CORS stations in Shanghai, we demonstrate the success rate, defined as the case when three directions converging to desired positioning accuracy of 10 cm, reaches 100% when the interval between the two epochs is longer than 15 min. Comparing the results of 15 min' interval to that of 10 min', it is observed that the position RMS improves from 2.47, 3.95, 5.78 cm to 2.21, 3.93, 4.90 cm in the North, East and Up directions, respectively. Combining the SDED coordinates at the starting point and the ED relative coordinates thereafter, we demonstrate the performance of RTK PPP with standard deviation of 0.80, 1.34, 0.97 cm in the North, East and Up directions.

Similar Papers
  • Book Chapter

FCB Estimation Using IGS Real-Time Products and Its Application in Precise Point Positioning

  • Jan 01, 2018
  • Bo Jiao +5
  • Preprint Article

Enhancing PPP Performance with Multi-GNSS Satellite Products and Integer Ambiguity Resolution

  • Mar 18, 2025
  • Marcus Franz Wareyka-Glaner +1
  • Research Article
  • Citations2

Uncalibrated phase delay estimation and ambiguity resolution for BDS-3 six-frequency uncombined PPP with legacy B1I/B3I and new B1C/B2a/B2b/B2a + b signals

  • Nov 05, 2023
  • Advances in Space Research
  • Zhehao Zhang +1
  • PDF
  • Research Article
  • Citations2

A PPP-RTK APPROACH TO MASS-MARKET APPLICATIONS

  • May 25, 2023
  • The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences
  • Y Gao +2
  • Research Article
  • Citations11

Performance analysis of ambiguity resolution on PPP and relative positioning techniques: consideration of satellite geometry

  • Jun 01, 2020
  • International Journal of Engineering and Geosciences
  • Sermet Ogutcu
  • PDF
  • Research Article
  • Citations15

Performance Evaluation of Real-Time Precise Point Positioning with Both BDS-3 and BDS-2 Observations.

  • Oct 23, 2020
  • Sensors
  • Lin Pan +7
  • Research Article
  • Citations22

Performance assessment of real-time multi-GNSS integrated PPP with uncombined and ionospheric-free combined observables

  • Sep 30, 2020
  • Advances in Space Research
  • Lin Pan +5
  • Conference Article
  • Citations45

Integrating GPS and LEO to accelerate convergence time of precise point positioning

  • Oct 01, 2015
  • Mingxing Ke +5
  • Research Article
  • Citations180

LEO constellation-augmented multi-GNSS for rapid PPP convergence

  • Sep 06, 2018
  • Journal of Geodesy
  • Xingxing Li +6
  • PDF
  • Research Article
  • Citations10

Multi-GNSS Fast Precise Point Positioning with Multi-Frequency Uncombined Model and Cascading Ambiguity Resolution

  • Jan 17, 2022
  • Mathematical Problems in Engineering
  • Qing Zhao +3
  • Research Article

Investigating the Impact of Random and Systematic Errors on GPS Precise Point Positioning Ambiguity Resolution

  • Jun 30, 2014
  • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
  • Joong-Hee Han +2
  • Conference Article

PPP Performance with Large TEC Gradient and Mitigation Methods

  • Nov 23, 2020
  • Yan Xiang +3
  • Research Article
  • Citations90

Generating GPS satellite fractional cycle bias for ambiguity-fixed precise point positioning

  • Sep 08, 2015
  • GPS Solutions
  • Pan Li +4
  • Conference Article
  • Citations9

Precise GNSS Positioning in Arctic Regions

  • Feb 10, 2014
  • Kees De Jong +3
  • PDF
  • Research Article
  • Citations2

Modelling and Assessment of a New Triple-Frequency IF1213 PPP with BDS/GPS

  • Sep 09, 2022
  • Remote Sensing
  • Zhongyuan Wang +4
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.