Thames Tideway Tunnel: Hammersmith Pumping Station – highly constrained working

  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

The Thames Tideway Tunnel project is a deep tunnel system for combined sewer overflow (CSO) control in London, UK. The project controls flows from 34 CSOs by transferring flows to Beckton Sewage Treatment Works for treatment. This paper focusses on the CSO interception works undertaken at Hammersmith Pumping Station, from outline design development through to the detailed design, construction and commissioning. The development of the hydraulic and structural design for the interception of the combined sewage flows at the existing Thames Water pumping station is described. The methods of construction and logistics for these works and for the drop shaft, connection tunnel to the main tunnel and other civil engineering works are also described. There is a focus on the temporary works undertaken to enable works in the pumping station’s inlet channel and for the adjacent interception chamber, the instrumentation undertaken in the upstream catchment sewers and the close working relationship with Thames Water. Design and construction methods and working arrangements accommodated significant constraints, including limited available land for the construction site, working adjacent to a new property development, maintaining a good relationship with the local community and ensuring the pumping station remained operational at all times.

Similar Papers
  • Conference Article
  • Citations1

Not in My Front Yard: Overcoming Public Resistance to Urban GSI Retrofit Projects

  • Jan 12, 2015
  • Kristine Cramer
  • Research Article
  • Citations43

Quantitative analysis of impact of green stormwater infrastructures on combined sewer overflow control and urban flooding control

  • May 21, 2017
  • Frontiers of Environmental Science & Engineering
  • Jinsong Tao +3
  • Conference Article

Coordination of Complex Geotechnical Works at a Tideway Site in Central London

  • May 01, 2025
  • Adrian Liviu Bugea
  • Preprint Article

A study on vortex separator technology to control combined sewer overflow

  • Jun 08, 2021
  • Nawshin Rummnan
  • Research Article
  • Citations1

Prédiction des débits de ruissellement pour le contrôle des réseaux d'égouts unitaires

  • Sep 01, 1982
  • Canadian Journal of Civil Engineering
  • Gilles Patry +2
  • Conference Article

Design and Implementation of a Water Quality Field Monitoring Program in Support of CSO Long Term Control Planning

  • Jul 13, 2005
  • Charles M Poskas +1
  • Research Article
  • Citations49

Optimization of Real‐Time Control With Green and Gray Infrastructure Design for a Cost‐Effective Mitigation of Combined Sewer Overflows

  • Dec 01, 2021
  • Water Resources Research
  • Marie‐Ève Jean +4
  • PDF
  • Research Article
  • Citations7

How reliable – and (net) beneficial – is the green in green infrastructure

  • May 02, 2023
  • Agricultural and Resource Economics Review
  • Peter M Groffman +2
  • Research Article
  • Citations1

City of Richmond, Virginia conducts Bacteriological Monitoring in the James River as Indicator of the Effectiveness of its Established Long Term Combined Sewer Overflow (CSO) Control Program

  • Jan 01, 2001
  • Proceedings of the Water Environment Federation
  • Wilbur E Mcconico +6
  • Research Article
  • Citations60

Implementation of an integrated real-time control system of sewer system and waste water treatment plant in the city of Wilhelmshaven

  • Oct 01, 2013
  • Urban Water Journal
  • Katja Seggelke +3
  • Research Article
  • Citations1

DISTRIBUTED RUNOFF MODEL OF WATER QUALITY AND STORM WATER IN URBAN SEWER PIPE SYSTEMS COMBINING PWRI MODEL AND SWMM

  • Jan 01, 1998
  • PROCEEDINGS OF HYDRAULIC ENGINEERING
  • Masahiro Watanabe +2
  • PDF
  • Research Article
  • Citations24

Study on the Rectification of Forebay in Pumping Station

  • Jan 01, 2018
  • Mathematical Problems in Engineering
  • Weiwei Song +3
  • PDF
  • Research Article

Comparison of Two Methods of End-of-Pipe Control for CSO and Stormwater

  • Jan 01, 1994
  • Journal of Water Management Modeling
  • Mario Conetta +2
  • Research Article
  • Citations12

Optimization of CSO Storage and Treatment Systems

  • Mar 01, 1997
  • Journal of Environmental Engineering
  • Richard Field +1
  • Conference Article
  • Citations3

Pipe Jacking in Difficult Urban Waterfront Conditions

  • Jul 06, 2007
  • Rafael C Castro +3
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.