  • Using Computer Simulations to Plan Construction Projects Accurately
  • https://doi.org/10.29173/aar70Copy DOI Icon

Using Computer Simulations to Plan Construction Projects Accurately

Show More
  • Abstract
  • Highlights & Summary
  • PDF
  • Literature Map
  • Similar Papers
Abstract

The three main objectives in construction projects are completing the project on time, within budget, and with good quality. Each construction project is unique and unpredictable making it beneficial to model the project before executing it. There are many ways to model a construction project; however, computer models are ideal. It is very costly and time consuming to experiment with the actual system. Therefore, by using a computer simulation, accurate data can be collected from the project without the time and cost drawbacks. The specific construction project researched is based on a real project from Fort Mcmurray Alberta, Canada. The construction project involved the delivery and erection of three different types of steel in a construction site. Once the steel has been delivered, it needs to be stored and then carried by forklift to one of two cranes to be erected. A schedule was provided for which days each type of material was expected to be delivered and erected, however this schedule did not account for the 20% chance that any delivery could be delayed by one day or the 10% chance that deliveries could be delayed by two days. A model project was created on Simphony.NET with the assumptions that work could commence the entire day (24 hours), the site has unlimited storage, and a delay in one delivery does not delay all the deliveries after it. The schedule for the project was then modified to reflect the results of the simulation. The modified schedule showed that several deliveries of materials were delayed. However, due to the model’s assumptions and the time for erection being relatively short, the planned schedule for the erection of the materials was not delayed. By using the data collected from the computer simulation it was possible to more accurately plan the schedule for this construction project.

Loading PDF

Similar Papers
  • Research Article

Exploring the Mitigation Actions of the Epidemic Impacts on Construction Projects in the Kingdom of Saudi Arabia

  • Jul 26, 2024
  • The Open Civil Engineering Journal
  • Abdullah M Abdullatif +3
  • Research Article
  • Citations7

The study of surface fatigue in sliding wear

  • Aug 01, 1973
  • Wear
  • Z Kolozsváry
  • Research Article
  • Citations2

Mitigation Approach for Significant Causes of Contractor’s Delays in Construction Projects in Sri Lanka

  • Sep 29, 2021
  • Proceedings of International Conference on Business Management
  • P Tharsan +2
  • Research Article
  • Citations18

Integrated carbon emission estimation method for construction operation and project scheduling

  • Aug 31, 2015
  • KSCE Journal of Civil Engineering
  • Tae-Kyung Lim +3
  • Book Chapter
  • Citations6

Stochastic Project Network Scheduling Technique for Construction Projects Using GERT

  • Jan 01, 2022
  • K Pregina +1
  • Research Article
  • Citations6

Bi-objective Optimization for Resource-constrained Robust Construction Project Scheduling

  • Nov 18, 2023
  • KSCE Journal of Civil Engineering
  • Wanlin Liu +3
  • Research Article
  • Citations58

Data-Driven Machine Learning Approach to Integrate Field Submittals in Project Scheduling

  • Nov 09, 2020
  • Journal of Management in Engineering
  • Mohamad Awada +2
  • Research Article
  • Citations2

Scheduling The Construction of Low-Income Community Houses in Palu City Using the Probabilistic Duration Method

  • Jun 01, 2024
  • IOP Conference Series: Earth and Environmental Science
  • A Setiawan +2
  • Research Article
  • Citations2

Characterization of true stress-true strain curves obtained by hot deformation of different types of steels

  • Oct 01, 1993
  • Scripta Metallurgica et Materiala
  • G.E.San Martín +1
  • Research Article
  • Citations7

Study of labor cost escalation in delay projects

  • Feb 01, 2020
  • Journal of Physics: Conference Series
  • R Natawidjana +1
  • Research Article
  • Citations7

The benefits of applying project management methodology on project delay: A study in construction projects in Iraq

  • Mar 01, 2020
  • IOP Conference Series: Materials Science and Engineering
  • Hayder K Aljamee +1
  • Research Article

Analisis Pengendalian Biaya dan Waktu pada Proyek Konstruksi Menggunakan Critical Path Method (CPM) dan Precedence Diagram Method (PDM)

  • Feb 02, 2026
  • Media Ilmiah Teknik Sipil
  • Ayu Lestari +2
  • Research Article

An expert analytical approach to reducing construction project delays from ineffective scheduling

  • May 25, 2025
  • KIU journal of science engineering and technology
  • Joseph O S +4
  • Research Article
  • Citations5

Delay Analysis Statements in the Presence of Debatable Concerns in Construction Projects

  • Dec 01, 2021
  • IEEE Engineering Management Review
  • Abanoub Wasfy +1
  • Research Article
  • Citations107

Bridge construction progress monitoring using lidar and 4D design models

  • Oct 23, 2019
  • Automation in Construction
  • Nisha Puri +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.